Lakewood Construction Co. v. BrodyLakewood Construction Co. v. Brody
Appeal from an order of Supreme Court, Oneida County (Ringrose, J.), entered June 4, 2002, which granted in part the motion of third-party defendant and the cross motion of defendant on counterclaim/third-party plaintiff to strike defendant’s counterclaims.
It is hereby ordered that the order so appealed from be and the same hereby is unanimously affirmed with costs.
Memorandum: This action was commenced by Lakewood Construction Co., Inc. (Lakewood), seeking damages for breach of a construction contract pursuant to which Lakewood was to renovate a fire- and water-damaged residence owned by defendant, Martin Brody. Brody interposed two counterclaims against Lakewood, for breach of contract and negligence, seeking dam
Brody appeals from four separate orders, the first of which granted a motion and cross motion to strike Brody’s counterclaims insofar as they relate to the allegedly defective installation of the laundry room floor, on the basis of Brody’s, “failure to comply with the [prior] Order of the Court permitting an inspection of the Brody residence” (see CPLR 3126 [3]). The remaining three orders variously granted in part and denied in part the parties’ motion and cross motions for summary judgment.
Supreme Court did not abuse its discretion in striking the counterclaims in part as a sanction for Brody’s willful refusal to permit an inspection of the laundry room floor, as directed in the prior order of discovery (see CPLR 3126 [3]; see generally Kihl v Pfeffer,
The court properly granted that part of Lakewood’s motion for summary judgment dismissing Brody’s affirmative defenses/ counterclaims to the extent that they allege that Lakewood should have uncovered and rectified any alleged defects in the plywood subflooring. By all accounts, once Lakewood had removed the damaged finished flooring, it observed an apparently sound and undamaged stratum of poured gypcrete several inches thick. The allegedly water-damaged plywood subflooring was beneath that gypcrete. The contract neither expressed nor implied that the flooring work would include an inspection and possible replacement of the plywood subflooring. Moreover, the contract did not call for removal of the layer of gypcrete, whether for inspection of the plywood subflooring or otherwise. Nor, contrary to Brody’s contention on appeal, did the contract call for a demolition and complete reconstruction of the in-floor heating system. Further, Lakewood established that, under the circumstances of this case, neither industry standards nor common sense required Lakewood to inspect the plywood subflooring for possible damage. The need to rip up the evidently sound gypcrete in order to inspect the plywood subflooring from above could not have been apparent to Lakewood, nor could it reasonably be deemed to have been a necessary part of the job of installing new finished flooring. We therefore affirm the order in appeal No. 3.
Beyond that, however, we conclude that the court erred in granting, with but one exception pertaining to the allegedly
With regard to the order in appeal No. 4, granting in part Oneida’s cross motion for summary judgment dismissing the amended third-party complaint (except insofar as it relates to the flooring work in the aforementioned “limited section” of the living room), we deem it appropriate to grant relief to Lakewood, which did not appeal from that order, as a means of effectuating our grant of relief to Brody on his appeal from the order in appeal No. 2 (see generally 511 W. 232nd Owners Corp. v Jennifer Realty Co.,