85 Wash. 360 | Wash. | 1915
This is an action to recover a balance claimed to be due for sand and gravel furnished on contract by the plaintiff to the defendant for use in the construction of permanent highway “3 B” in King county, between June 16 and December 1, 1913.
The contract is in writing and provides that plaintiff shall deliver to defendant sand and gravel, according to specifications and acceptable to the county engineer, at sixty-two and one-half cents a cubic yard, f. o. b. Auburn, freight charges to be paid by defendant and deducted from the amount due the plaintiff; cost of freight and hauling charges on any material rej ected by the engineer to be deducted from amount due plaintiff. The specifications referred to are those contained in the written contract between the defendant and King county for the construction of the road, and provide that the sand should be clean, coarse and sharp, and that both
Exclusive of three car loads rejected by the engineer in the cars and not included in the plaintiff’s bill, the plaintiff claimed to have delivered to the defendant 9,942.5 yards of sand and gravel of a value of $6,214.03. Plaintiff admitted that it received from the defendant $3,200 cash on account, and that defendant was entitled to credit for $2,190.21 for freight paid by the defendant, leaving a balance of $823.82, for which plaintiff asked judgment, with interest thereon from December 1, 1913.
The defendant denied that it had received more than 9,039.75 yards of usable material; alleged that 744.5 yards delivered did not comply with the specifications, but contained debris, dirt and clay and could not be used and was left in the bottoms of the cars ; that in addition thereto, 160 yards of material was condemned by the engineer, and that in making part of the sand and gravel that was used acceptable to the engineer, the defendant was required to use in connection therewith cement of the value of $97.40; and that defendant was put to the expense of hauling and handling condemned gravel which with the cost of this cement, amounted to $223.90. The defendant also set up an affirmative defense and counterclaim to the effect that, by reason of the inferior grade and quality of the material furnished, the defendant was required by the engineer to pick, clean and wash it before use, and was delayed in the construction of the highway by reason of the inferior material shipped, to the defendant’s damage in the sum of $500.
The case was tried to the court without a jury. The court found that the plaintiff furnished the amount of material claimed in its complaint, which at the contract price
The several assignments of error are all directed to the single claim that the findings of the court are not supported by a preponderance of evidence. The respondent advances the much worn argument that this court will not disturb the findings of the trial court unless they lack any support in the evidence. It is asserted that this court has so often decided that counsel deems it unnecessary to cite any authority on the question. It is true that, in a few cases, expressions capable of that construction have inadvertently crept into our opinions, but the contrary rule has been expressed so often and so positively, and is so clearly laid down by the statute, Rem. & Bal. Code, § 1736 (P. C. 81 § 1225), that we are at a. loss to understand the continued reassertion of this long discarded theory. As we said in Baker v. Yakima Valley Canal Co., 77 Wash. 70, 137 Pac. 342, after citing a number of decisions:
“These decisions clearly recognize the correct rule that findings of the trial court in a case triable de novo will be sustained only when supported by a fair preponderance of the evidence. It is our duty in such a case to weigh the evidence. That is what a trial de novo means.”
And again in Zizich v. Holman Security Inv. Co., 77 Wash. 392, 137 Pac. 1028, 139 Pac. 57, we said:.
“The statute, Rem. & Bal. Code, § 1736 (P. C. 81 § 1225), puts the burden upon this court of trying the case de. novo in. actions legal or. equitable tried to the court. In the discharge of this duty, we treat the findings of the trial judge
See, also, Lewis v. Dean, 76 Wash. 596, 137 Pac. 341; Borde v. Kingsley, 76 Wash. 613, 136 Pac. 1172; Dougherty v. Soll, 70 Wash. 407, 126 Pac. 924; Johns v. Arizona Fire Ins. Co., 76 Wash. 349, 136 Pac. 120, 49 L. R. A. (N. S.) 101, and numerous decisions therein cited, where the same rule is negatively stated.
In accordance with our clear duty under the statute as construed by these decisions, we have examined the evidence in this case with much care. We have read not only the abstract and supplemental abstract, but also the statement of facts, which is not voluminous. We find that the respondent, in open court during the trial, admitted that the appellant is entitled to an allowance for 160 yards of condemned gravel, which at the contract price would amount to $100; fifteen yards on account of a fir stump shipped in one car, which at the contract price would amount to $9.37; and for $97.40 for cement used by direction of the engineer in making other material shipped acceptable. The appellant is thus entitled to an undisputed credit of $206.77.
There was also undisputed evidence that the appellant, by reason of the shipment of unusable material, was put to the
following items of necessary expense:
Demurrage on one car of material................ $2.00 •
Unloading that car............................ 5.30
Unloading another car......................... 5.00
Hauling twenty yards of condemned gravel to the
roadway................................... 11.00
Removing eighteen yards.............:.....•...... 5.65
Removing 110 yards, of condemned gravel.......... 24.50
$53.45
As to the material which appellant claims was left in the bottoms of the cars because of its being mixed with dirt, debris and mud, there was a direct conflict in the evidence. That of the appellant may be condensed as follows: Of the 299 carloads, 210 were shipped in gondola cars, 80 in flat bottomed cars, and 9 in cars of which the evidence gives no specific description. In the bottom of each of the gondola cars were four pockets, each of which would hold about three-fourths of a yard of material. The testimony of the appel-. lant’s president and three other witnesses was to the effect that the pockets in each of these gondola cars were filled with mud, slime and debris, indicating that, after the cars were filled, water had been turned upon them, thus washing the earthy material and debris to the bottom of the cars. The testimony is clear that in practically all of these gondola cars this unusable material was not unloaded but was left in the pockets. The appellant’s evidence was also clear to the effect that in the bottom of each of the flat bottomed cars was about one yard of unusable material, which was left when the car was unloaded. According to this testimony, it would appear that there were at least three yards of material thus left in each of the 210 gondola cars, amounting in all to 630 cubic yards, and one yard in each of the 80 flat bottomed cars, making a total of this unusable material of 710 cubic yards. This, at the contract price, would amount to $443.75. Two of the witnesses for the respondent testified that the gondola cars were returned with the pockets filled with material, but denied that the material was inferior in any particular to the balance of the car load. They testified, however, that this returned material was taken from the cars and the cars washed out before reloading, a course hardly necessary if this returned material was good.
When the respondent presented its bill for the balance of $823.82, the appellant presented to the respondent a counter bill for credits, including all of the foregoing items, and some others not clearly established by the evidence. In addition to these, the appellant’s evidence also tended to establish a claim of about $60 paid for labor in picking shale from the material which was actually used, and $45 for loss of time by the bricklayers, caused by the fact that certain of the sand shipped for use as a cushion for the brick was unfit and the bricklayers could not proceed until other sand had been procured. The evidence touching these items, however, is not entirely satisfactory, and in view of the fact that neither of them was included in the bill for credits presented by the appellant to the respondent, we are of the opinion that they should not be allowed. It would seem that, had the appellant believed at the start that it was justly entitled to these credits, they would have been included in its bill. The fact that they were not so included raises a strong presumption that they are an afterthought.
A further discussion of the evidence would be of no profit. It must suffice to say that we have carefully considered all of
(1) For the value of 160 yards of rejected gravel;
15 yards for the space occupied by a ¿tump in
one of the cars; and $97.40 worth of cement, amounting in all to.....................$206.77
(2) For demurrage on one car and the handling of
rejected gravel ......................... 53.45
(3) For rejected material left in the bottoms of the
cars, amounting in all to 710 yards........ 443.75
Total...............................$703.97
Deducting this amount from the $823.82 claimed by the respondent, leaves a balance due of $119.85, for which amount, with interest from the first day of December, 1913, and costs in the trial court, the respondent is entitled to judgment.
The cause is therefore remanded with direction to the trial court to modify the judgment in accordance with this opinion. The appellant may recover its costs on this appeal.
Morris, C. J., Main, Fullerton, and Crow, JJ., concur.