Krug v. St. Mary's Borough

152 Pa. 30 | Pa. | 1892

Opinion by

Mr. Justice Green,

This was an action of trespass brought to recover damages occasioned, as alleged by the plaintiff, by the negligent construction of a stone bridge over Elk creek by the defendant. The bridge was erected in 1866 by the borough authorities •.over Elk creek within the borough-limits. The plaintiff claims, and on the trial gave evidence to prove, that the whole width of the creek between the abutments, was twenty-two feet ten inches, and alleges that it might and should have been built, with one span only, so as to leave the water of the stream to flow freely and without obstruction. He also further alleges, and gave evidence to prove, that the bridge was built with two narrow spans about nine feet in width each, with a pier about three feet in width in the centre. This, the plaintiff claims, was a negligent construction of the bridge by the defendant which resulted in the water of the stream being backed up and obstructed so as to overflow his house and land immediately above the bridge in times of ordinary freshets, causing him damage and injury. The learned court below submitted the cause to the jury entirely on this issue, charging them as follows : “ Now in order that the plaintiff may recover against the' borough any damages, it is necessary for him to establish by the evidence in the case that the damages resulted from the acts and conduct of the defendant. In other words the evidence must show to the satisfaction of the jury that the overflowing of his land was caused by the improper erection of the pier in the centre of the bridge across Elk creek. ... If in the erection of the bridge there were sufficient space left' to pass an ordinary freshet the borough would not be liable to Krug, although his land might be overflowed. ... If you *35come to the conclusion that the damages which Krug claims in this suit were caused by the improper and unskillful erection of the bridge, and that the bridge was not capable of passing the water of an ordinary freshet, then you determine from the evidence what amount of damages he has sustained. ... If you come to the conclusion that the bridge was erected by the borough of St. Mary’s in such a manner as to pass the water through the arches in time of an ordinary freshet, and that the land was not overflowed by reason of the unskillful erection of the bridge, then your verdict should be for the defendant. If however you- come to the conclusion that the bridge was so improperly and unskillfully erected that it did not allow the passage of the water in time of an ordinary freshet, then you ascertain from the testimony what damages Krug has sustained by reason of the erection of the bridge, causing the alleged overflow of his land.”

The same idea was enforced by the court in answer to the points submitted on both sides, and hence the only question tried was whether the defendant had been guilty of negligence in the construction of the bridge, and in such a manner as to do injury to the plaintiff in the enjoyment of his land just above the bridge. No question was raised as to the right of the borough to build and to maintain the bridge at the point where it was erected, nor was there any contention on the part of the plaintiff as to the exclusive right of ‘the defendant to determine the character of the structure, its location, the materials of which it should be built, and all the details of the construction. No other question was raised, or submitted to the jury, except the question of negligence of the defendant in the exercise of its right of construction, and if there was such negligence, whether it resulted-in injury to the plaintiff. On the trial there was an abundance of testimony submitted by the plaintiff in support of his allegation of negligence. It was shown by a number of witnesses that, in times of moderate rises in the water of the stream, the passages left between the pier and the abutments were not sufficient to carry off the water, that whenever there was floating timber, logs, boards, barrels or any other débris in the stream, it would be caught by the centre pier and would obstruct the flow of the water so as to dam it up and raise it considerably higher above the bridge *36than it was below, and thus overflow the plaintiff’s land. Witnesses also testified that there was no occasion for the centre pier, and that if it had not been placed there the space between the walls of the bridge at each end would have been sufficient to pass all the water of the stream. The verdict in favor of the plaintiff was in accord with the testimony and could not consistently have been otherwise. There was indeed no real opposing testimony on the question of obstruction, nor on the question of negligence in the construction. There was certainly no occasion for the erection of a pier in the centre of a bridge-span the whole width of which was only twenty-two feet. The only engineer who was examined on the trial testified that the effect of the pier was to obstruct the flow of the water materially, and that, in his opinion, if the pier was out, the space would be sufficient to carry off’ all the water in an ordinary flood. There was really no contrary testimony on this subject, and the case was simplified to the mere question of the negligent exercise of the right to construct the bridge.

The doctrine upon this subject is entirely free from difficulty, and is well expressed by Mr. Justice Agnew in delivering the opinion of this court in the case of Allentown v. Kramer, 73 Pa. 406. After referring to a number of cases which affirm the right of a municipality to raise its streets, or bridge them, -without liability for consequential injury, he proceeds as follows: “But the'cases referred to, or some of them, state the distinction upon which this case was submitted to the jury,.and which has been sustained in many other cases, to wit: that for negligence either in the construction or repair of public works (when repair is a duty) the corporation itself must respond in damages for a special injury caused by its negligence,” citing many cases. And again: “ The right of the city to raise the street and to construct the bridge as a necessary part of the improvement, does not appear to have been drawn into question. The faulty and negligent construction of the bridge making it an obstruction to the flow of the water in ordinary-rains, was a proper ground of’recovery.”

The law upon this subject is so perfectly familiar and so thoroughly well established that a repetition of the authorities is quite unnecessary. No question arose as to the statute of limitations or a prescriptive right to flood the plaintiff’s lands. *37Whether there were any floods prior to 1884 we are not informed by the testimony, and we certainly cannot presume there were any in the absence of testimony to prove them. For those that occurred in that and subsequent years this and another action were brought, both within six years, and the fact that no similar action was brought in previous years proves nothing as to the right of recovery in these actions. There might have been no freshets in that period inflicting any serious injury, or the plaintiff might not have cared to incur the expense and annoyance of a lawsuit during that time. It is enough to know that there was not a particle of testimony proving or tending to prove the existence of a prescriptive, or any, right to flood the plaintiff’s land by the back water at this bridge.

The assignments of error are not sustained.

Judgment affirmed.