The defendant Blake Manor Development Corporation
The trial court found the following facts. On September 1,1987, the plaintiffs purchased lot number seventeen in the Blake Manor subdivision from the defendant. The subdivision, located in New Britain, consists of thirty-one lots laid out on the side of a hill. It was developed in three stages. The defendant used the engineer
On February 23, 1987, the plaintiffs entered into a contract with the defendant for the purchase and construction of a home on lot number seventeen for $182,900. The contract provided a limited warranty program that required that the defendant’s performance adhere to standards of normal workmаnship. The warranty required that the defendant establish the necessary grades and sewers to ensure proper drainage away from buildings. Further, it required that no standing water should remain in a manmade landscaped area twenty-four hours after a rain except swales and collecting areas which mаy drain as long as forty-eight hours after a rain or from sump pump discharge. It also provided that once the proper grades and swales were established by the defendant, the plaintiffs were required to maintain them.
In the spring of 1988, the plaintiffs and other homeowners living in the tract experienced severe flooding and erosion of their lots. All of the topsoil on the plaintiffs’ lot washed away. Their backyard became a swamp with a foot of mud and gullies of up to two and three feet deep. The lot had not been rough graded properly. The contours were much steeper than shown on the subdivisiоn map and water was draining onto it from all of the other lots. In August, 1988, the plain
The city of New Britain ordered the implementatiоn of an erosion remediation plan. This plan was principally designed to correct the drainage conditions of the roads and storm sewers in the subdivision. It did not address the individual concerns of the homeowners regarding their properties. The plaintiffs and other property owners signed agreemеnts allowing the defendant to do the corrective work, which satisfied the city’s concerns but did not solve the plaintiffs’ problems. The defendant did not regrade the plaintiffs’ property at the time it implemented the city’s remediation and erosion control plan.
At the request of the parties, the court viewed the premises at the conclusion of the evidence and in the presence of counsel. The erosion and drainage problems continued on the property and it was obvious that there had been unsuccessful attempts to remedy the condition. Trees located on the proрerty were dying as a result of improper rough grading, and standing water remained on the property for weeks.
I
The defendant first claims that the court improperly concluded that it had violated implied warranties under General Statutes § 47-118.
General Statutes §§ 47-116 and 47-118 “impose liability under an implied warranty on the builder/vendor of a new home in favor of the purchaser of any improved real estate.” Beckman v. Jalich Homes, Inc.,
The trial court correctly concluded that “[bjecause tract homes are sold as a package, that is, the house and lot are sold together, the implied warranties are breached not only because of structural defects but also because of the unsuitability of the lot upon which thе house was built.” The trial court, citing Hesson v. Walmsley Construction Co.,
The court proрerly concluded that the defendant breached the implied statutory warranties that the drainage system would be installed according to sound engineering standards, and that the house would be constructed on the lot in a workmanlike manner and would be fit for habitation.
II
The defendant next claims that the court improperly concluded that it had violated CUTPA. The defendant points out that the court based its finding of a CUTPA
The purpose of CUTPA is to protect the public from unfair practices in the conduct of any trade or commerce, and whether a practice is unfair depends on the finding of a violation of an identifiable public policy. Daddona v. Liberty Mobile Home Sales, Inc.,
“Whether a practice is unfair and thus violates CUTPA is an issue of fact.” DeMotses v. Leonard
Ill
The defendant’s final claim is that the trial court abused its discretion in concluding that the plaintiffs were entitled to damages in the amount of $15,468 and attorney’s fees in the amount of $8600. The defendant argues that the court’s findings, pursuant to which it awarded the sum of $12,000 for damages for regrading, were unsupported by the evidence, and that, since the court incorrectly concluded that the defendant had violated CUTPA, its award of attorney’s fees was clearly erroneous and unsupported by the record.
“It is beyond dispute that the trial court has broad discretion in determining the relevancy and materiality of evidence.” Web Press Services Corporation v. New London Motors, Inc.,
In rendering judgment, the court awarded $968 for preliminary costs, $12,000 for regrading, and $2500 for tree removal for a total of $15,468. In explaining, the court stated: “The court would indicate with regard to damages that although a serious attack was made upon the expertise and credibility of Dean Burhoe, the court finds that that attack on his expertise does not affect the accuracy and the believability of the observations that he made. He apparently is the only non-party witness in this case who actually was present when the situation was most pronounced, in the spring of 1988. The court does not perceive Burhoe’s testimony on the issue, actually the critical issue with regard to Burhoe’s testimony was not whether the erosion sedimentation plan did the job that the city expected it would do, but whether it did the job to which the [plaintiffs] were entitled as a matter of law insofar as their own lot was concerned.
“Burhоe by reason of being a landscaper, of having observed the original conditions, the court finds and gives great weight to his testimony. The court would also note that although it found helpful testimony of [two other witnesses] that their concerns obviously were different in kind and scope from those of the [plaintiffs], so that the court has given great weight and accepts the testimony of Burhoe as to damages, although not necessarily relying on his testimony with regard to issues of liability. . . . Burhoe indicated that these estimates were reasonable ones . . . .”
The record is clear that Burhoe’s testimony established that there was аn improper rough grade and drainage and that proper completion of the job required replacement of the topsoil along with the furnishing of sod and seed that had been eroded due to poor drain
Because we have already concluded that the trial court properly found a violation of CUTPA, an award of attorney’s fees was proper.
The judgment is affirmed.
In this opinion the other judges concurred.
Notes
There are also four individual defendants, directors and officers of the defendant corporation, who have not appealed from the judgment rendered against them on the fifth count of the complaint. We will refer in this opinion to Blake Manor Development Corporation as the defendant.
The plaintiffs are Michael and Donna Krawiee.
The defendant filed a counterclaim that was removed from thе matter by substituted pleadings upon the defendant’s refiling of its answer and special defenses.
There is no written memorandum of decision, nor is the oral decision, as transcribed, signed by the trial judge. Practice Book § 4059. The plaintiffs have filed, as an appendix, a transcript of the oral decision. Practiсe Book § 4074. It is the appellant who bears the burden of providing an adequate record for review. Oakes v. New England Dairies, Inc.,
General Statutes § 47-118 provides in pertinent part: “(a) In every sale of an improvement by a vendor to a purchaser, except as provided in subsection (b) of this section or excluded or mоdified pursuant to subsection (d), warranties are implied that the improvement is: (1) Free from faulty materials; (2) constructed according to sound engineering standards; (3) constructed in a workman-like manner, and (4) fit for habitation, at the time of the delivery of the deed to a completed improvement, or at thе time of completion of an improvement not completed when the deed is delivered.
“(c) If the purchaser, expressly or by implication, makes known to the vendor the particular purpose for which the improvement is required, and it appears that the purchaser relies on the vendor’s skill and judgment, there is an implied warranty that the improvement is reasonably fit for the purpose.”
General Statutes § 47-116 provides in pertinent part: “As used in this chapter, unless the context otherwise requires: ‘Improvement’ means any newly constructed single family dwelling unit, any conversion condominium unit being conveyed by the declarant and any fixture or structure which is made a part thereof at the time of construction or conversion by any building contractor, subcontractor or declarant . . . .”