KIRK V. PULASKI ROAD IMPROVEMENT DISTRICT NO. 10.
No. 10
Arkansas Supreme Court
December 20, 1926
February 21, 1927
172 Ark. 1031 | 291 S.W. 793
EMINENT DOMAIN—LIABILITY FOR GRADING PART OF STREET.—Whеre the street in front of plaintiffs’ property was partly ungraded, an improvement district engaged in paving the street was not liable to plaintiffs for reducing to grade the ungraded portion of the street, there being no change in the grade of the street in front of plaintiffs’ propеrty. - EMINENT DOMAIN—DAMAGES FROM EXCAVATION.—Where a road improvement district, in widening a street and extending the grade, excavated part of a high bank in front of the property, the only element of damages recoverable by adjacent property owners was the actual injury to their property by loosеning the soil in blasting off the face of the embankment.
- EMINENT DOMAIN—DAMAGES IN WIDENING STREET.—In an action by property owners against an improvement district for damages by loosening the soil on his property caused by blasting in widening the street in front thereof, the measure of damages was the difference in market value of the property before and after the injury, if any, and not the cost of constructing a retaining wall or the depreciation in rental value.
- EMINENT DOMAIN—INJURY TO PROPERTY—DAMAGES.—Every element that can fairly enter into the question of market value and which a prudent business man would consider before purchasing the property should be considered by the jury in determining the difference between the value of property before and after it was damaged in constructing a highway.
- EMINENT DOMAIN—DAMAGES IN WIDENING STREET.—In an action by a property owner against an improvement district for damages by loosening the soil on plaintiffs’ property by blasting in widening the street, evidence held to warrant recovery of substantial damages by property owners.
Appeal from Pulaski Circuit Court, Third Division; Marvin Harris, Judge; reversed.
Horace Chamberlin, for appellant.
Rose, Hemingway, Cantrell & Loughborough, for appellee.
MCCULLOCH, C. J. Appellants are the owners of two lots facing south on West Second Street, between Summit and Schiller avеnues, in the city of Little Rock. They have owned these lots for many years, and there are three dwelling houses on them, built about the year 1900.
In the creation of Pulaski Road Improvement District No. 10, authority was conferred upon the district to improve West Second Street, and this was done during the years 1923 and 1924. The city council passed an ordinance, just before the work of improving the street was begun, widening West Second Street in front of appellant‘s prоperty to a width of forty feet. The ordinance provided that the road improvement district should do the work of widening the street and should make good any damages sustained by property owners. The work
It is undisputed that the street in front of appellants’ property was dedicated by the original owners to a width of sixty feet, and that the widening of the street by the distriсt in making the new improvement did not extend to the line of appellants’ property. No part of appellants’ property was taken or used in the widening of the street, the only contention being that there was damage done to the property by loosening the bank and еxtending the top of the slope as a result of blasting away the face of the bluff. Nor was there any change in the grade of the street in front of appellants’ property. That portion of the street which had been previously graded by the city
“1. If you find for the plaintiff, you will find for them for the depreciation in the market value of their property caused by the invаsion of their property line, and by the rendering of their property line less accessible, if you find from the evidence it has been rendered less accessible by the invasion of their property line.
“2. If you find from the evidence in this case that, on account of the excavations made by directions of the defendant, the property of the plaintiff will in the future slide or crumble into the excavations, you would have a right to take that fact into consideration in determining the depreciation in the market value of the property of the plaintiffs.
“3. If you find from a preponderance of the evidence that the defendant, in widening Second Street, has invaded the plaintiffs’ property line and has made a portion of said property useless to them by virtue thereof, and, if you find from such evidence that it has thereby deprived said properties of reasonably safe or convenient means of ingress and egress, then the court instructs you that such constitute injuries for which the plaintiffs should recover, and this is true, even though you may find
that the defendant did the work of widening the street in a skillful manner.”
Error of the court is assigned in submitting as thе measure of damages the difference in market value of the property, if any, instead of the cost of restoration by the construction of a retaining wall, and also in refusing to submit, as a measure of damages, the depreciation of the rental value. We think the court was correct in its instruction. The injury, if any, was a permanent one, for which all the damages could and must have been recovered in one action. The injury was not recurring so as to permit separate actions from time to time as each separate injury occurred, аnd the difference in market value was therefore the correct measure of damages. Davis v. Dunn, 157 Ark. 125, 247 S. W. 793.
We conclude upon the whole that there was no error in the proceeding—that the issues were correctly submitted to the jury, and that the evidence was sufficient to support thе verdict in favor of appellee.
Affirmed.
Opinion on rehearing, delivered February 21, 1927.
HART, C. J. Upon further consideration of this case, the majority of the court is of the opinion that the motion for a rehearing should be granted.
This is an action for the assessment of damages for injury to plaintiff‘s property in improving a street next tо her property, which is also a State highway. It is true, as stated in our former opinion, that the cost of the retaining wall is not the plaintiff‘s measure of damages. The record shows that the highway commissioners, in a praiseworthy effort to satisfy the plaintiff, expended about $325 in erecting а retaining wall to protect a shade tree in her yard. The record also shows that it would cost more than $2,000 to erect a retaining wall which would prevent the embankment of the plaintiff‘s property, abutting the improved street, from further caving in. While this proof was competent to show the damage to the plaintiff‘s property, it was not the measure of
Every element that can fairly enter into the question of market value and which a business man of ordinary prudence would consider before purchasing the property should also be considered by the jury in arriving at the difference between the value of the property bеfore and after the taking or damage to it. L. R. Junction Ry. v. Woodruff, 49 Ark. 381.
Tested by this rule, we think the plaintiff, under the undisputed evidence, was entitled to recover some substantial amount of damages.
Glenn D. Douglas, a civil engineer, was a witness for the plaintiff. He made a plat of her property showing the line of the embankment as it existed at the time of the survey. We quote from the abstract of the plaintiff his testimony as follows: “The upper line of the embankment is over the property line and encroaches thereon. The under line is irregular and is practically outside the line—that is, south of the property line—at least this is practically so. The embankment has caved some more since I made my survey. This soil is slate or shale with an inclination to the north of approximately forty-five degrees. The encroachment on the plaintiffs’ lots by virtue of this excavation presents an irregular line and it extends onto the property from nothing to approximately two feet.
“The surface of lot 7 is from ten to twelve feet above the street level. Lot 7 is higher above the surface of the street than lot 6. The street opposite lot 7 betwеen curbs is 40 3/10 feet. The curb is six inches on each side. The north curb of the street is from three to three and a half feet to the embankment. The north curb line which the district established is about two and
His testimony was corroborated by that of Mrs. Maude M. Kirk. In addition, she stated that the embankment had caved up to the very edge of the terrace. She testified that there is always some sloughing away, which was much more when there was a hard rain.
D. A. McCrea, one of the engineers for the road improvement district, which damaged the prоperty, testified that the caving of the embankment was the result of blasting. According to his testimony, it is almost impossible in digging out rock excavations to control the effect of the powder. The reason is that the powder will follow the seams. The average encroaching upon the plaintiff‘s property occasioned by the excavations is about six inches. It might be in some places as much as a foot and six inches back of the retaining wall, which was afterwards filled in. The retaining wall was the one which the commissioners placed around the shade trеe next to the edge of the embankment abutting the street in order to protect it.
Other evidence shows that the embankment would still cave after hard rains. Thus, it will be seen that, according to the undisputed evidence, the plaintiff suffered some substantial amount of damages, and the jury failеd to award her any amount.
It is probable that the jury was misled by the instructions of the court which singled out her element of damages. In any event, the testimony above abstracted is not contradicted at all. It is true that the witnesses for the defendant testified that there was no difference between the market value of the property before and after the taking and damage. But, as we
Justices WOOD and SMITH dissent.