79 W. Va. 463 | W. Va. | 1917
Conceiving himself aggrieved by the diminution in the value of his property, resulting from the alteration of the grade of Neely avenue in front of his house and lot and the appropriation of the major part of the avenue at that point to the construction of the abutment and approach to a bridge, approximately half of which is within the limits of the defendant corporation, plaintiff brought this action, and obtained the judgment which defendant charges is infected with error. Apart from the approaches, steel and cement entered into the construction of the piers, abutments, supports, girders, flooring and guard rails, and lumber into the approaches except as to the cement footers for the platform supports. The county court of Doddridge county, as the active agency in the erection of the bridge, assumed the liability for the cost of the improvement, upon the condition that it was to be reimbursed to the extent of. one half of the expense incurred, the town of West Union, the sole defendant, to permit the appropriation of Neely avenue, within its corporate limits, to consummation of the improvement. While the record does not clearly disclose the method by which the reimbursement was to be effected in the proportion required, it is conceded in argument by counsel representing each liti
This concurrence in the expense of the improvement is accounted for only on the theory of the joint interest of the court representing the county and council representing the town, and lack of the authority or power of either of them acting alone to cause the bridge' to be built or of sufficient funds under the control of either to complete the bridge. With the motive prompting the joint action, or the correctness of either theory or the propriety of the enterprise, we are not now concerned. As to none of these matters is there any question raised or doubt cast by either of the parties. The bridge was completed, and the structure opened for the use of the public and now is used by it.
By the first assignment, defendant challenges the correctness of the ruling on its demurrer to the declaration. It is charged to be insufficient, solely because it shows on its face that the action was commenced after the lapse of one year from the date the cause of action accrued, hence barred by the statute. That provision, however, does not apply. The cause of action would, under the statute, have survived the death of the plaintiff at any time within five years after the right to sue had accrued to him, whether he had brought or failed to bring the action while living. The right to sue in the first instance, or to prosecute in the second, would- not have abated by death except after the expiration of five years. In part the injury averred consists of an obstruction to the free use and enjoyment of a public street in its original condition, a use interrupted by the change of grade and by the superimposition of an additional servitude due to the abutment and approach created by the defendant itself within the corporation boundary. An action for such obstruction sur
On the theory that, as the bridge, although in part within the town limits, was constructed under the direction and control of the county court, that court alone is liable to respond in damages for any pecuniary loss occasioned thereby to the property of the plaintiff, also is relied on to exonerate defendant from the liability sued for. That burden can not so be shifted, nor defendant thereby relieved from responsibility for the injury resulting from an act in the consummation and maintenance of which it participated, and the benefit of which it has since enjoyed. So far as the structure is within its territorial jurisdiction, the municipality is liable for the consequences of the original construction and its location in the thorofare under its control, and for injuries due to lack of proper maintenance and repairs. The bridge when completed became part of the streets of the town, and, as such, subject to its dominion and control. Curry v. Mannington, 23 W. Va. 160; Cavender v. Charleston, 62 W. Va. 654. If its maintenance 'creates a nuisance, it is subject to municipal correction; if it wrongfully inflicts injury upon the person or property of another the town must respond to the injury. These principles are so well settled in this state as not to require further discussion or citation of authority. In Maine, the court in Perkins V. Oxford, 66 Me. 545, held
Defendant assigns as erroneous the admission over its objection of testimony introduced by plaintiff in support of his right to a recovery, that in the process of the erection of the necessary piers the contractors caused an interruption of the flow of a sewer connecting the property alleged to be damaged with Middle Island creek, whereby his cellar became flooded with water, inflicting physical injury to his property. The correlation of this proof with the cause of action averred in the declaration is not apparent. Indeed, it is inconsistent with the permanent injury claimed by the plaintiff. The defect so introduced is re'adily remediable; it has been remedied by the repair of the breach in the sewer line. For the expenditure so occasioned the defendant may or may not be liable, but surely not in this action. This proof should not have been admitted.
Without any averment in his declaration to impart to defendant information of an intention to offer proof on that phase of the case, plaintiff was permitted to introduce testimony tending to show the accumulation of water on the approach and its escape through the flooring to the ground below in front of his house and lot, thereby creating an unsanitary condition which injuriously affected the value of his property. Without such averment for the purpose of notice, this proof ought not to have been admitted. The purpose of a declaration is fully to state the essential elements of the cause of action averred as the basis of the recovery demanded, to enable the defendant to prepare his defense to meet the different important phases of the claim preferred against him.
Again, defendant complains of the undue activity of the presiding judge during the progress of the trial, and especially while the jury was engaged in viewing the premises at the request of the plaintiff. While a judge is sitting at the trial
The troublesome questions arise out of the instructions given at the instance of the plaintiff upon the measure of damages in cases of this character. Many of them present mere abstract legal principles, usually the embodiment of points of the syllabus of decided cases involving cases similar to the one before us. Upon the use of these this court has frequently animadverted, not because of any doubt of the correctness of the principles announced, but because when delivered to a jury not trained in legal discrimination there is danger of a misapplication to the facts of the case before them. Indeed, many of the witnesses examined upon the trial, who seem to have been men possessed of more than an ordinary degree of intelligence and acumen, confessed their inability to comprehend without assistance- from the court or counsel the distinction between general and special benefits to the property involved, -when applied 'to inquiries of this nature. Yet to aid the jury there were propounded upon this vital inquiry instructions abstract in form, which have been differently interpreted almost if not altogether as frequently as any other subject considered by courts and authors of law text books. Concededly the statement and application of the doctrine' of special benefits is inextricably involved in confusion. .Besides, a correct understanding of the principle embodied in the instructions does not always assure its correct application by the jury. What properties are “similarly situated” — an expression somtimes used in the decisions — is
Apart from the irregularity noted, which may be cured upon, the second trial, the instructions given are not erroneous, except number five requested by plaintiff, 'which is unintelligible as it appears in the record; and except number five given for defendant, which is erroneous in principle, if not misleading. Plaintiff’s instruction number one we think
We therefore reverse the judgment, set aside the verdict, and remand the action for a new trial.
Reversed, and remanded for new trial.