190 Ind. 374 | Ind. | 1921
— In 1895 the John Young drain was established and constructed, commencing near the center of the southwest quarter of section 26, township 29 north, range 8 east, in Huntington county, Indiana, and extending southeastwardly across that section and across sections 35 and 36, a distance of 10,380 feet, and terminating at a highway on the south boundary of sec
At the same time the remonstrators filed an answer to the petition in three paragraphs, of which the first paragraph was a general denial, the second asserted that the old drain “is ample and sufficient to drain all lands * * * and the lands * * * of all parties concerned,” and the third stated that, if constructed, the drain petitioned for would not be a repair of the old drain, but would be a new drain with branches and laterals by which the lands of said defendants would be affected. A reply in general denial to the second and third paragraphs of said answer was filed. Appellee at the same time filed a motion to strike out the “two-thirds” remonstrance. The cause was then submitted for trial, on the issues joined, on June 30, 1917, and was continued for argument to July 30, 1917, on
A motion for a new trial was filed by appellants the same day, but the record does not show that this motion ever was ruled on, or that appellants saved any exception in relation to it.
The drainage commissioners filed a report that the proposed repair of said drain was practicable, that it would improve the public health, benefit the public highways, and be of public utility, that the costs, damages and expenses would be less than the benefits to the lands assessed therefor, and that the best and cheapest method to accomplish such repair work would be to commence at the lower end of the fifteen-inch tile, as laid when the drain was originally constructed, and lay tile downstream along the open ditch a distance of 6,184 feet, to a point near where the original drain terminated, at the south boundary of appellee’s farm, the tile to be used ranging in size from sixteen inches in diameter at the upper end, where it joined the old fifteen-inch tile, to twenty-seven inches at the lower end, and thence to construct an open ditch, more than four feet deep at the upper end, leading down across a forty-acre tract to an outlet, a distance of 1,316 feet. Nothing was to be done to the upper 4,000 feet of the original drain, which was tiled when the drain was first built. The cost was assessed, not only against all of the lands originally assessed for the construction of the drain, but also against more than 600 acres which had subsequently been made to drain into it by means of open ditches and tile, and also agaiqst the forty-acre tract
After notice to new parties, the appellants jointly filed a plea in abatement verified by their attorney, stating in substance that the report provided for deepening a large part of the old drain, and putting into the part which had been constructed as an open drain tile larger than were used in the part at the upper end originally tiled, and for extending the ditch a quarter of a mile downstream to an outlet, and for assessing the cost against more than 600 acres of additional lands, as well as against all those originally assessed for the construction of the drain. A motion to strike out this plea for the alleged reason that it did not state any statutory ground of remonstrance, and that appellants had previously filed an answer in bar, was sustained, and appellants excepted. Some further evidence was heard, on March 25,1918, upon the issue joined on the answers alleging that, if constructed, the improvement petitioned for would be a hew and different drain and not the repair of the old'drain, after which the court sustained appellee’s motion to strike out the “two-thirds remonstrance,” and appellants excepted.
The appellants then filed 'a motion to strike out the report of the drainage commissioners for the alleged reasons that it provided for the construction of a new and different drain, larger, deeper and longer than the one which the petition asked to repair, and that the court was therefore without jurisdiction, which motion was overruled, and appellants excepted. And the court thereupon ordered the drain established; and confirmed the report of the drainage commissioners, and the assessments made therein, and ordered the drain con
On that day the appellants also filed their motion for a new trial, the only proper specifications of which were that the decision is not sustained'by sufficient evidence, and is contrary to law. This motion was overruled, and appellants excepted, and perfected a term appeal. None of appellants filed or offered to file a remonstrance asserting that any part of the lands assessed would not be benefited, or challenging the amount of any assessment, or putting in issue any findings made by the drainage commissioners. The only relief asked or sought was based on the assumption that the trial court was entirely without jurisdiction.
No question is presented as to the right of any one or more of the appellants, separately, each to defeat the assessment against his land in whole or in part, or to obtain any relief based upon any other cause than lack of jurisdiction of the court to order the work done.
The evidence set out in the bill of exceptions shows that more than two-thirds of the owners of lands affected by the proposed improvement joined in the remonstrance which the court struck out, and tends to establish the other facts substantially as above stated.
The following plat shows the boundaries of the original drainage district, and to what extent lands outside of that district were assessed for the cost of the proposed repairs, the broken lines around the outside inclosing the added territory. Appellants have assigned as errors the overruling of their motion for a new trial, and of their motion to strike out the report of the viewers, and the action of the court in striking out their plea in abatement and their “two-thirds remonstrance.” Under these several assignments they discuss and rely only upon the propositions (a) that this was an ac
The remonstrance by all but two or three out of two dozen landowners affected, filed on the day the petition was docketed, was sufficient to defeat the proceeding if it was, in fact, a proceeding for the construction of a new drain. §6142 Burns 1914, Acts 1907 p. 508, §3.
But if it was only a proceeding to extend, repair, and tile an existing public drain, and if the court properly
The mere fact that lands not originally assessed for the construction of the drain were assessed for the repairs, changes and extensions ordered by the court did not affect the jurisdiction of the court, nor afford any ground for abating the suit or for striking out the report of the drainage commissioners.
The judgment is affirmed.