In 1997, Kennedy discovered the contamination. Kennedy reported the contamination to the Minnesota Pollution Control Agency (the Agency) and began further investigations and clean-up of the site. Kennedy then brought suit against CBS, the successor in interest to Westinghouse.
1
The district court found CBS liable under the federal Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and the Minnesota Environmental Response and Liability Act (MERLA). The court awarded Kennedy $106,393.23 in statutory response costs and issued a declaratory judgment of liability for future response costs, which CBS did not appeal.
2
See Kennedy I,
Before the Kennedy I proceedings, CBS entered into a consent order with the Agency that would lead to the development and implementation of a Response Action Plan (Plan) to clean up pollution at the Kennedy Building site. On remand from Kennedy I, the district court held the *875 case in abeyance for the development of the Plan. Kennedy participated in the comment process. Relevant to this appeal, Kennedy commented that absent the removal of all contaminated soils from the site, “the asphalt cap will have to be maintained indefinitely to prevent water infiltration.” Kennedy specifically objected to the inclusion of permeable, unpaved islands in the parking lot plans submitted by CBS. The Agency considered this comment and responded that any concern regarding residual contamination would be addressed by monitoring. Further, it explained that “replacement of the asphalt surface is not an integral part of the remedial action; it is solely for the purpose of Site restoration.” At the end of the administrative process, the requirements of the Plan were laid out in the Minnesota Decision Document (Decision Document) issued by the Agency. The Plan required CBS to perform site preparation and asphalt removal; soil excavation and confirmation sampling; off-site disposal, backfilling of excavated areas, site restoration, and resurfacing of excavated areas; and long term monitoring. The Decision Document also noted that CBS is obligated to perform future additional remedial action upon redevelopment or exposure of “remotely accessible” soils.
On February 8, 2006, the district court issued an order modifying the injunction to 1) incorporate the Plan requirements from the Decision Document, 2) order CBS to provide the court with the results of periodic testing, and 3) order further remedial action contingent on tests showing the spread of contamination or redevelopment that would expose unremediated soils. The court also required CBS to post a bond to cover costs of future relief, which was later set at $1,311,000. CBS appealed, arguing that the injunction was not sufficiently specific, that the evidence showed there was no need for injunctive relief under MERA, and that the district court did not have the power to require CBS to post a bond. In
Kennedy II,
we affirmed as to the latter two arguments, but found the injunction to lack the required specificity and remanded with instructions that the district court “expressly list those actions required by the injunction.”
CBS implemented the Plan, beginning work in July 2006. The Plan required CBS to excavate all contaminated soil up to twelve feet below the surface and back-fill with clean fill. This excavation covered most of the lot and was particularly extensive on the east and north sides of the Building. In order to complete the required excavation without risk of severe structural damage, CBS determined that it was necessary to install a system of three-foot-wide concrete buttresses on the east and north sides of the Building. Rather than removing the buttresses after excavation and backfill, CBS determined that it was preferable to leave them in place. They were covered with backfill and paved over when the parking lot was restored. Restoration of the site, including permanent paving of the parking lot, was completed in May 2007. Throughout the implementation of the Plan, KBA alleges that it incurred expenses due to testing soil, holding meetings, having building personnel provide access to various parts of the Kennedy Building, and obtaining advice regarding various issues.
The district court hearing regarding modification of the injunction on remand and Kennedy’s motion for additional relief was set for September 4, 2007. On August 30, 2007, the Agency issued a letter approving CBS’s Response Action Implementation Report with the addition of a “down-gradient monitoring well.” Kennedy contended that CBS’s remedial action did not comply with the requirements in *876 the Decision Document and asked the district court to impose additional requirements. Kennedy also moved the district court to increase the bond posted by CBS and to award Kennedy $59,448.61 in post-judgment response costs. The district court modified the injunction to impose no further requirements on CBS; declined to increase the amount of the bond; and denied Kennedy’s motion for response costs. We affirm the district court as to the MERA injunction and bond issues. We remand for further proceedings on response costs.
II.
A.
Kennedy appeals the district court’s modification of Paragraph 1 of the MERA injunction on remand to impose no further requirements on CBS, except those in Paragraphs 2 (testing-contingent remediation) and 3 (bond and redevelopment-contingent remediation), previously affirmed by this court.
At the outset, Kennedy argues that the district court did not comply with the appellate mandate when it failed to determine which of the Decision Document requirements further the purposes of MERA and independently evaluate CBS’s performance of the applicable Decision Document requirements. In
Kennedy II,
we remanded the injunction to the district court to ensure that it specifically enumerated any requirements it placed on a party.
Next, Kennedy argues that the district court erred in determining that no further relief was necessary under Paragraph 1 of the injunction. We review the district court’s issuance of a permanent injunction for abuse of discretion.
United States v. Bailey,
There is substantial evidence in the record that CBS completed the remediation required by the Decision Document. CBS’s submissions to the Agency, the district court, and this court point to substantial record evidence that “all accessible and remotely accessible soils above contamination standards have been removed and replaced with clean dirt and the parking surface was restored.... ” Kennedy does not contest that CBS carried out these remedial actions in accordance with the Decision Document, nor that CBS repaved the parking lot. Rather, Kennedy makes specific contentions that certain aspects of the remediation were inadequate. For Kennedy to prevail, it must show that the district court clearly erred in rejecting its contentions that the buttresses and/or parking lot did not comply with the Decision Document and were necessary to protect the environment.
See Kennedy I,
First, Kennedy contends that the buttress system installed by CBS is a construction-related structure that must be removed under the terms of the Decision Document and poses a threat of contamination. Kennedy argues that CBS did not disclose the permanent installation of buttresses to the Agency and thus, no determination has been made as to whether they violate the terms of the Decision Document. The record reveals, however, that the buttresses are depicted in the exhibits to the Remedial Action Implementation Report submitted to the Agency and that the district court was clearly apprised of their existence. We are persuaded that the permanent installation of foundation support does not violate the terms of the Decision Document; for instance, the Decision Document discusses using grout, also a permanent installation, to stabilize the building as one of a non-exclusive list of options. We further conclude that substantial evidence supports the district court’s determination that removal of the buttresses is not required by the Decision Document or by the goal of protecting natural resources. The record discloses measures taken to prevent PCB and cholorbenzene contamination of the buttresses, such as use and disposal of plastic lining, removal of all contaminated soil around the buttresses, and installation of clean fill. Despite Kennedy’s expert testimony that contamination of the buttresses was “likely,” it was not clearly erroneous to find that the protective measures were taken by CBS were sufficient. Finally, Kennedy’s argument about the potential for future contamination at the time of buttress removal and disposal is unavailing. Injunctive relief will not issue to “address speculative future harm.”
See E.E.O.C. v. HBE Corp.,
Second, Kennedy contends that CBS did not comply with the Decision Document requirements for restoring its parking lot, and argues that the current design, including permeable islands in the asphalt parking lot, poses a threat of pollu *878 tion, impairment, or destruction to natural resources. Substantial evidence supports the district court’s rejection of this factual contention. Although the Decision Document required CBS to reinstall asphalt, it noted that “the replacement of the asphalt surface is not an integral part of the remedial action; it is solely for the purpose of Site restoration.” During the comment process, Kennedy expressed concern that poor maintenance of the asphalt and the inclusion of green space in the parking lot design created the risk that contamination would spread. The Agency considered Kennedy’s comment and concluded that there was no significant risk of such migration and the monitoring requirements were sufficient to address any concerns, and reiterated its position that reinstallation of the asphalt was for restoration rather than remediation. Kennedy’s complaints regarding the design of the parking lot, which was reconfigured to comply with City of Minneapolis permit requirements, show neither that CBS failed to comply with the Decision Document nor that the parking lot design endangers natural resources.
The district court did not. clearly err in finding that CBS substantially complied with the Decision Document and rejecting Kennedy’s proposed factual findings that the parking lot and buttresses endangered natural resources. Thus we find no error in the district court’s conclusion that no further injunctive relief was necessary under Paragraph 1. MERA permits the court to impose equitable relief only if it is “necessary or appropriate to protect the air, water, land, or other natural resources located within the state from pollution, impairment, or destruction.” Minn.Stat. § 116B.07.
The district court’s modification of Paragraph 1 of the MERA injunction was not an abuse of discretion.
B.
Kennedy appeals the district court’s denial of its motion to increase the bond posted by CBS to cover the cost of future remediation. Kennedy argues that the excavation conducted by CBS uncovered greater quantities of contaminated soil and greater concentration of contaminants than expected, resulting in higher than anticipated future remediation costs. Accordingly, it moved the district court to increase the bond amount imposed by the 2006 injunction, and affirmed in Kennedy II, from $1,311,000 to $3,378,972. The district court summarily denied Kennedy’s motion. CBS urges us to affirm, arguing that Kennedy’s proposed motion was outside the scope of remand from Kennedy II, and that Kennedy previously waived the issue. Further, CBS argues that there has been no change in circumstances that permits the district court to reconsider the amount of the bond.
To the extent that Kennedy argues that the district court could have revisited this issue under our
Kennedy II
remand, we review the scope of the mandate de novo.
See Duncan Energy Co.,
In
Kennedy II,
we remanded the injunction to the district court for a modification of Paragraph 1 of the injunction, as discussed above. Although Kennedy’s motion below to increase the bond was styled separately from its suggestions for modification on remand, Kennedy now appears to argue that the bond amount is within the scope of the remand because the purpose of the bond is “to ensure that the MERA injunction [is] properly implemented.” Our remand in
Kennedy II,
however, did not instruct the district court to modify Paragraph 3 of the injunction, which ordered the bond, or the subsequent order setting the bond amount. Further, we limited the scope of the district court’s modification of Paragraph 1 to “specifying] which requirements of the Decision Document” were to be included in the injunction.
Alternately, Kennedy argues that the district court should modify the bond amount in light of the soil conditions uncovered during CBS’s implementation of the Plan. Kennedy does not specifically identify the legal basis for its motion, though it discusses both changed circumstances and newly discovered evidence as the factual bases for its motion. Kennedy does not, however, allege that the condition of the unremediated soil has actually changed since the amount of the bond was set, only that more accurate information is now available: “[Kennedy] contends that the greatly increased contamination discovered during the remediation justified increasing the bond.” 6 (Emphasis added). We therefore conclude that its motion is grounded on Federal Rule of Civil Procedure 60(b)(2), which permits relief from a final judgment when there is “newly discovered evidence that, with reasonable diligence, could not have been discovered in time to move for a new trial.... ” We assume but do not decide that Kennedy has made a sufficient showing of newly discovered evidence under Rule 60(b)(2).
Relief under Rule 60(b)(2), however, is limited by Rule 60(c)(1), which indicates that a Rule 60(b)(2) motion must be made “no more than a year after the entry of the judgment or order or the date of the proceeding.” The injunction ordering CBS to post a bond was initially entered on February 8, 2006, and the amount of the bond was set on April 21, 2006, which is the date of the final order for the purposes of Rule 60.
7
After our opinion was entered in
*880
Kennedy II,
affirming this part of the injunction, Kennedy filed a motion to increase the bond amount on May 29, 2007. More than one year elapsed from the final entry of the district court’s order until Kennedy’s motion, and thus it is untimely. We therefore affirm the district court’s denial of the motion to increase the bond.
See Swanson,
C.
Kennedy contends that the district court erred in denying its motion for $59,448.61 in response costs. The district court denied Kennedy’s motion without elaboration, stating simply that “Plaintiffs motion [Docket No. 375] is denied.” Kennedy contends that the district court incorrectly determined that the motion for response costs was outside the scope of remand. CBS urges us to affirm the district court’s denial as a decision on the merits.
From the sparse record in front of us, we cannot determine whether the district court’s opinion was procedural or substantive. At oral argument, the district court suggested that Kennedy was procedurally barred from recovering additional response costs. The district court also suggested that such a request was outside the scope of this court’s mandate. While we will not divine the basis for the lower court’s decision from its comments, they support the inference that the court may have ruled on procedural grounds. Further, in its brief below and here, CBS argues both that Kennedy’s request for response costs was outside “the limited mandate from the Eighth Circuit” as well as that Kennedy’s request should be denied on the merits. Thus, the district court may have denied Kennedy’s motion on either the procedural or substantive grounds advanced by CBS. The district court’s order does not resolve this ambiguity. The only explicit factual finding in the district court’s order, that “CBS has substantially performed the remediation requirements,” bears no logical relationship to Kennedy’s request for response costs.
The district court was not foreclosed from entertaining Kennedy’s claim for response costs. First, further response costs are not precluded by the 2002 award. On the contrary, at that time Kennedy won a declaratory judgment of liability against CBS that is binding in subsequent actions to recover “all future reasonable and necessary costs.” Minn.Stat. 115B.11, subd. 2(b). Second, the mandate in
Kennedy II
did not foreclose the district court from ruling on Kennedy’s motion.
See United States Fid. & Guar. Co. v. Concrete Holding Co.,
*881
Because the basis for the district court’s decision is critical to the parties’ rights going forward, we decline to rule on Kennedy’s claim for response costs in the first instance. These are fact-intensive claims not appropriate for determination by the court of appeals. While the district court’s legal conclusions as to the compensability of claimed response costs are reviewed de novo,
see Trimble v. Asarco, Inc.,
We remand to the district court for clarification and/or reconsideration of its order.
See Fogarty v. Piper,
(1) Which, if any, of Kennedy’s claimed response costs are compensable; and
(2) The amount of money damages, if any, to which Kennedy is entitled.
III.
For the forgoing reasons, we affirm the order of the district court modifying the MERA injunction and denying Kennedy’s motion to increase the bond. We remand this case for clarification of the district court’s order denying Kennedy’s request for response costs.
Notes
. Liability for the site is now placed with CBS Corporation (CBS). CBS was preceded by Viacom, which was the party of record in Kennedy I. For simplicity, we will consistently refer to CBS, substituting it for Viacom where applicable.
. The district court also awarded Kennedy statutory attorney’s fees, witness fees, costs, and prejudgment interest.
. Additionally, we reversed a jury verdict in favor of Kennedy on common law strict liability claims that had awarded it $225,000 in compensatory damages and $5,000,000 in punitive damages. We reversed and remanded the entry of prejudgment interest and award of attorneys’ fees insofar as they were awarded for the strict liability claim.
Kennedy I,
. Kennedy similarly makes much of Federal Rule of Civil Procedure 65(d)(l)'s requirements for specificity and detail. However, as the district court’s revision of the injunction did not require any new acts, such detailed findings and description were unnecessary. See id. (requiring detail — and prohibiting incorporation by reference — when an "act ... [is] restrained or required").
. In its reply brief, Kennedy contends that it will incur costs during redevelopment due to site contamination. Removal of the buttresses may be considered such a cost. An action under MERLA is the appropriate way to recover response costs at that time. Kennedy has the benefit of a declaratory judgment establishing CBS’s liability for all future response costs under Minn.Stat. § 115B.11, subd. 2. Thus, the district court did not err in rejecting its request for injunctive relief at this time.
. Further, Kennedy has not alleged any exceptional circumstances that would render the amount of the bond inequitable.
See generally Ass’n for Retarded Citizens of N.D. v. Sinner,
. Once the amount of the bond was set on April 21, 2006, no further action was contem *880 plated by the district court. Thus we treat it as a final order.
. While Kennedy did not style its motion under Rule 15, the district court may choose to treat it as such and entertain Kennedy’s claims. Alternately, the district court may exercise its discretion to deny Kennedy leave to supplement the pleadings.