83 N.Y.S. 823 | N.Y. App. Div. | 1903
The plaintiff has recovéred á verdict of $5,000 damages for severe injuries to his arm, caused by coming in contact with a feed wire Upon the defendant’s trolley system while engaged in sandpapering one of the supporting poles, preparatory to painting the same. The plaintiff was employed by a contractor who had entered into' á contract with the defendant to paint- the supporting poles. The measure of the defendant’s obligation to á workman under these circumstances was to use reasonable care for his protection against injury. (Wells v. Brooklyn Heights R. R. Co., 67 App. Div. 212, and cases there cited.) The theory of the plaintiff’s case was that the accident was due to the defective insulation of the feed wire at a point a short distance from the supporting pole, where his elbow came in contact with it,' and, in view of the: language of the complaint, the trial court held that no negligence could be predicated
There was proof in the case which would authorize a finding that the insulating covering of the feed wire was lacking at the point where the plaintiff claims to have received his injury ; but it is conceded that the wire had been in place about a year, and the ■appellant contends that evidence showing that the insulation was -defective at the time of the accident did not justify the inference that the defect existed at the time of the original construction, inasmuch as there was proof that the action of the wind, causing the wires to sway, had a tendency to wear away the covering material at certain points. ■ I think, however, that such inference might ■fairly be based upon the testimony offered in behalf of the defendant itself. One of the defendant’s witnesses, a lineman named Lafayette R. Baut, testified that there had been no change in the feed wire or the construction at the pole, where this accident occurred, since the occurrence of the accident down to the time of the trial. The feed wire, he said, was in the same condition, exactly the same, as it was in 1899, when he examined it immediately after the accident. The trial took place on October 14, 1902. If the ■condition of the pole and wire had remained unchanged from July 22, 1899, the day when the accident occurred, to October 14, 1902, the day of the trial, the jury might certainly infer that it remained unchanged from the time it was put up, a year previous to the day ■of the accident, up to the time of the accident.
It is not necessary to discuss the point made in regard to the ■alleged contributory negligence of the plaintiff, or his assumption of the risks involved in the employment, further than to say that the-proof on these branches of the case not only justified, but required, the submission of both issues to the jury.
The judgment should be affirmed..
; Present — Goodrich, P. J., Bartlett, Hirschberg, Jems and Hooker, JJ. ,
Judgment and order unanimously affirmed, with costs.