Keeney v. L & S ConstructionKeeney v. L & S Construction
The principal issue in this appeal is whether monetary penalties imposed for disposal of solid wastes in violation of the applicable environmental statutes were so excessive as to constitute an abuse of discretion. The plaintiff, Timothy R.E. Keeney, the commissioner of environmental protection (commissioner), filed a multicount complaint charging the defendants L and S Construction, Cathy Morsey, Lee B. Morsey and Steven Hinckley (defendants)
During 1990 and 1991, without having applied for any state permits, the defendants disposed of massive amounts of construction debris at five different sites in the state. One of these sites was their own property in New Milford, while the others were sites on which they deposited waste materials with the consent of the owners.
At their own property at 322 Kent Road in New Milford, abutting the Housatonic River, the defendants buried several thousand cubic yards of waste material on the site, and accumulated more than 51,000 cubic yards altogether. The waste materials constitute an environmental hazard to the site’s subsurface water and to the contiguous river.
At 44 Black Bridge Road in Newtown, although the defendants received consent to deposit clean fill, they instead deposited 700 cubic yards of construction debris. The solid waste is within fifty to seventy-five feet of a well, and its leachate will pollute the ground and endanger the water supply at the site.
On Route 55 in Sherman, the defendants dumped 3000 to 4000 cubic yards of construction debris on property for which they had agreed to dig a foundation hole and to build an access road. These solid waste materials constitute a danger to the water supply in the area and to the environment.
On property in or near a wetland in New Preston, with the unwitting consent of the owner, the defendants dumped 2000 cubic yards of construction debris. These solid wastes constitute a danger to the water supply, to the environment in general and to the wetlands.
The trial court concluded that the defendants had violated three different environmental statutes by their disposal оf significant amounts of construction debris at each of these five sites without the necessary permits. First, the defendants’ dumping of construction materials contravened the requirements of
Having found that the commissioner had proven these three statutory violations, the trial court issued a permanent injunction enjoining the defendants from dumping future deposits of solid waste anywhere within the state without a permit and requiring their compliance with detailed specifications for the removal of the illegal solid waste previously deposited at each of the sites other than Torrington.
In addition, pursuant to
The defendants’ appeal raises two issues. They maintain that the judgment of the trial court should be set aside becаuse: (1) there was insufficient evidence of their violation of § 22a-16 of the Environmental Protection Act; and (2) the amount of the civil penalties constituted an abuse of discretion. We are unpersuaded.
I
The defendants’ claim of insufficiency of the evidence is a limited one. They do not challenge the trial court’s finding that their unlicensed disposal of construction
In support of its conclusion that the defendants had violated the Environmental Protection Act, the trial court found that, at each of the five sites at issue in this case, the defendants had deposited construction debris in close proximity to water resources. At each site, the leachate from this construction debris constituted an environmental hazard to a river, to the local water supply or to a wetlands. These findings of fact would be reversible on appeal only if they were clearly erroneous. See
The defendants do not question the trial court’s findings relating to their improper disposal of the construction debris or to the leachate emanating from such debris. They maintain, however, that the court improperly determined that they had violated § 22a-16 of the Environmental Protection Act because whatever pollution, impairment or destruction of the environment resulted from their аctivities was not shown to have been unreasonable.
The state’s evidence on the adverse impact of the defendants’ activities on the health and well-being of the community and the environment principally took the form of expert opinions offered by three environ
Although the defendants do not challenge the qualifications of the state’s witnesses to give expert opinions on environmental matters, they nonetheless maintain that the trial court could not have relied on these expert opinions because the experts testified in large part on the basis of hypothetical questions rather than on the basis of their own personal observations. The defendants cite no authority in support of this proposition of law, and our law is to the cоntrary. The established rule is that, on direct examination, the stated assumptions on which a hypothetical question is based must be the essential facts established by the evidence. See Floyd v. Fruit Industries, Inc.,
II
Although the defendants do not contest the trial court’s finding that they violated
In making its assessment, the trial court appropriately relied on the guidelines defined in Carothers v. Capozziello, supra, and
In conformity with these guidelines, the trial court made the following findings. The defendants’ violations were “severe and extremely serious. Not only did the defendants dump toxic demolition debris near water supplies at the various sites but also dumped it next to the Housatonic River in New Milford in huge quantities. The 51,000 cubic yards of waste at that site were buried over a 2 acre area up to 18 feet deep. They totally dumped over the five sites in excess of 58,000 cubic yards of waste. Of further significance is that much of this dumping occurred after the defendants were told by the authorities that they were violating the law.” The defendants made substantial profits as a result of their illegal dumping, not only because they entered into profitable contracts for the illegal disposal of demolition debris but also because they did not incur the costs associated with lawful disposition. They had profited from a contract to transport and dump demolition material from New York at $8 per cubic yard and they had saved the costs of proрer disposition in an amount “in excess of $1,000,000.” The court further noted that, in assessing penalties against the defendant, it had considered the effect of the fine on future violations by these defendants.
The court expressly inquired into the defendants’ ability to pay a substantial fine. In part, this inquiry was grounded in the court’s initial findings about the size of the defendants’ business. The court determined that the defendants were actively engaged in the demolition business, having grossed at least $269,000 in the first six months of 1991. They owned the land and the buildings in New Milford, as well as “six large trucks
The defendants challenge the trial court’s findings in several respects. Significantly, they do not contest the considerable number of days that the court found them to have violated the statute at each of the five sites at which they illegally disposed of demolition debris. They maintain, however, that the court improperly: (1) ignored testimony about their financial circumstances; (2) found that 51,000 cubic yards of waste had been deposited at the New Milford site;
The defendаnts presented only one witness to testify about their financial ability to pay a penalty. That witness was the defendant Cathy Morsey, the manager of the defendant partnership. Although she testified on direct examination that the company was under severe financial stress, on cross-examination she acknowledged that she had little or no direct knowledge of the underlying financial data, inasmuch as the figures upon which she relied had come from a bookkeeper who was no longer in the comрany’s employ. In these circumstances, the court was not required to attribute persuasive weight to her testimony. We agree with the commissioner that, especially after flagrant
The defendants challenge the court’s finding about the extent of their dumping activities at the New Milford site. Specifically, the court found that “51,000 cubic yards of waste at that site were buried over a 2 acre area up to 18 feet deep.” The defendants’ contention that no evidence was adduced to support the finding cannot prevail in light of the testimony of Peter Carpenter, a field inspector of the department of environmental protection engineering enforcement division, solid waste unit. On the basis of test borings performed at the site, Carpenter testified that demolition debris had been buried over a two acre area up to sixteen to eightеen feet deep. With the appropriate conversion into cubic yardage, this evidence substantiates the court’s finding.
The defendants’ contention that the court ignored their attempts to remedy their illegal use of the New Milford site cannot be sustained. Not only did they fail to ask the trial court to articulate what role such attempts might have played in its decision; see
The defendants also argue that the trial court lacked a factual foundation for its findings about the economic
Finally, we reject the defendants’ contention that the court did not have the discretion to impose both a remоval order and a civil penalty in the circumstances of this case. The governing statutes do not forbid the trial court to order cumulative remedies. Indeed, as the commissioner points out, a remedy limited to the costs of removal would not achieve the primary purpose of civil penalties, which is deterrence. See, e.g., United States v. T & S Brass and Bronze Works, Inc., 681 F. Sup. 314, 322 (D.S.C. 1988); United States v. Phelps Dodge Industries, Inc., 589 F. Sup. 1340, 1365 (S.D.N.Y. 1984).
The judgment is affirmed.
In this opinion the other justices concurred.
Notes
The commissioner also brought charges against the owners of the properties, the defendants Leonard F. Ballwig, Nevzat Murtishi, Agman Murtishi and Michael Chemiske. These defendants аre not parties to this appeal because, at trial, they entered into a stipulated judgment with the commissioner.
“(b) No solid waste facility shall be built or established and no solid waste facility without a permit to construct shall be altered after July 1, 1971, until the plan, design and method of operation of such facility have been filed with the department and approved by the commissioner by the issuance of a permit to construct, provided, nothing in this chapter or chapter 446e shall be construed to limit the right of any local governing body to regulate, through zoning, land usage for solid waste disposal. The commissioner shall send a written notification of any application for a permit to construct to the chief elected official of each municipality in which the proposed facility is to be located, within five business days of the date on which any such application is filed.”
The construction debris had been removed from the Torrington site by the time of the trial.
The defendants make a subsidiary claim that the trial court mistakenly assumed that the demolition debris was hazardous waste rather than solid waste. Although the record indicates some casual usage of the term “hazardous,” the trial court consistеntly and correctly made its findings under the proper statutes. The court’s determination that the demolition debris was hazardous to local water supplies and to local wetlands is not a finding that the debris fell within the legal classification of hazardous waste.
The penalty was assessed, under each statute, in accordance with the trial court’s findings that the defendants’ continuing violations had occurred as follows: New Milford, 649 days; Sherman, 639 days; New Preston, 636 days; Newtown, 606 days; and Torrington, 89 days.
The defendants claim that the trial court made an improper factual finding because it allegedly adopted the representation of the commissioner, at trial, that “this case involves the largest amount of dumping of hazardous waste in the State’s history.” Nothing in the memorandum of decision substantiates the proposition that the court made such a finding.
An acre consists of 4840 square yards. Two acres consist of 9680 square yards. At a depth of sixteen feet, or 5.33 yards, the site contained 51,626 cubic yards of debris.
The trial court’s finding must stand, despite the testimony of the defendant Cathy Morsey. Her testimony on this issue was neither dispositive nor did the court have to find it credible.