97 Neb. 306 | Neb. | 1914
Plaintiff brought this action to recover damages in the sum of $30,000 for personal injuries. Prom a judgment on a verdict in his favor for $16,000, defendant has appealed.
Plaintiff was the head brakeman and a switchman on a local Union Pacific freight train running regularly between Omaha and Columbus. While he was watching this train as it ran southward on a Union Pacific track at a switch near South Omaha, where he was required to signal the engineer for switching purposes, an engine running backward in the same general direction on the Chicago Great Western track ran against him. He had gone upon that track at the regular time and place pursuant to a daily custom known to a switching crew in charge of the engine which struck him. He was knocked down, but clung to the engine and was dragged beneath it. As a result he lost a foot and three fingers and was severely shocked. At the place of the injury tracks of the two railway systems run side by side in a curve, the Chicago Great Western track being four or five feet west of the nearest Union Pacific, track. The side of the cab occupied by the engineer to whom plaintiff gave signals was on the convex of the curve. Plaintiff dropped off his own train and went •westward onto .defendant’s parallel track, where the engineer on the Union Pacific engine was within the line of
The first assignment of error is directed to the giving-of an instruction containing the following language :• “When plaintiff was injured the railroad, which was mentioned in the testimony in this case as the Chicago Great Western Railway was' being operated by receivers appointed by the United States circuit court. Shortly after-plaintiff’s injury said railroad property was, pursuant to a sale made by said United States circuit court and cer
The orders and decrees to which reference is thus made impose upon the purchaser the following obligations:
“As a part of the consideration for the property purchased, the purchaser shall take the property and shall receive the deed therefor upon the express condition that, in addition to the sum bid therefor, the purchaser shall pay and discharge all the following claims which are not paid by the amount bid: * * * (a) All indebtedness, obligations or liabilities which by such receivers shall have been contracted or incurred in the operation or on account of the property of the said Great Western Company at any time before the same shall have been delivered to the purchasers, or in the discharge of their duties as receivers at any time before they are finally discharged. * * * The purchaser shall pay any of the claims described in clauses hi’ and ‘b’ which are established or unquestioned, and any disputed claims when allowed by the master, without objection, or by the court, and they shall pay to the master or into court' the moneys required to discharge the same from time to time as the court may direct.”
It is argued that the instruction is erroneous, because defendant, in purchasing the property of the Chicago Great Western Railway Company and of the receivers on the terms fixed by the decrees and orders of the federal court.
On the other hand, plaintiff takes the position that the last clause quoted from the decree does not impose a condition of liability, but merely sanctions an equitable remedy which is not exclusive, and insists that damages caused by the receivers in the operation of the railway are recoverable in an independent action at law against the purchaser.
The decree on its face shows that payment of the bid is not the full measure of the purchaser’s liability.' Provision is made in direct terms for the payment of other liabilities and obligations. Is plaintiff’s claim one of them? In the management of the railroad the liabilities created by the receivers, except for individual or personal misconduct, were official, and a valid claim or a judgment against them in their representative capacity is in effect a liability against the property under their control. In directing receivers the federal courts keep these principles in mind. It will not be presumed, in construing a decree directing a sale by receivers, that the federal court intended to relieve railroad property from a lawful and just claim growing out of the operation of the railroad while in their hands. Such claims may exist at the time of the sale, though there has not yet been an opportunity to adjudicate or to allow them in any judicial proceeding. Under the orders of the court the earnings of the carrier may be put into improvements, while liabilities created by the receivers remain unpaid. The decree was not intended to wrong those having legal claims or to devise means for re
The next assignment of error challenges an instruction submitting to the jury an issue as to the right of plaintiff to recover damages under the doctrine of the last clear chance. Defendant insists that facts authorizing a recovery based on that rule of law are not pleaded, and that therefore the trial court erroneously submitted an issue not tendered by the pleadings. On the record presented the point is too narrow and technical. That issue was tried. There was evidence on both sides. While plaintiff in his petition did not plead in legal phraseology the principle on which he seeks relief,, he pleaded facts showing that he was negligently injured after his peril had been discovered. The grounds on which plaintiff sought relief were not only understood by defendant and tried by the parties, but the facts on which plaintiff based his right of recovery were stated in the petition. For these reasons, the assignment is overruled.
Further argument is directed to the point that the trial court erred in permitting a recovery under the doctrine of the last clear chance after plaintiff was struck, without requiring a finding that the switching crew on the Chicago Great Western track had actual knowledge of that fact. Such actual knowledge was shown by defendant’s witnesses without dispute or contradiction, and a statement to that effect to the jury would have been proper. ' It follows that defendant was not prejudiced by the instruc
An instruction on the duty of plaintiff to look and listen before going onto defendant’s track and on the law applicable to proof of contributory negligence on his part is also criticised as erroneous. On those subjects the trial court, among other things, said:
“As to just what time he should look and listen before going on the track is for you to determine from all of the facts and circumstances in evidence before you. In this case if you believe from a preponderance of the evidence that plaintiff did not take such precautions as to his own safety as an ordinarily prudent person would have done under like circumstances and surroundings, and if you further find that such failure on the part of plaintiff caused or contributed to his injury, then you should find that he was guilty of contributory negligence. If, on the other hand, you believe that he did take such precautions as to his safety as an ordinarily prudent person would have done under like circumstances and surroundings, then you should find he was not guilty of contributory negligence.”
In this connection defendant assigns error in the refusal of the trial court to give the following requested instruction:
“Plaintiff, in going upon the track of the defendant company without looking for the approach of the engine after he dropped off his train at the main-line switch, was guilty •of negligence.”
Whether there was error in these rulings depends upon the evidence. There is proof tending to show: Plaintiff dropped off his engine at what is called the “inside switch,” lined it, climbed onto a ladder on the side of one of the cars of his train while it was running southward, rode about 125 feet to a place described in the record' as the “mainline” switch, again dropped off and went upon the Chicago Great Western track to give signals at the place of the injury. This was a repetition of what had occurred regularly at the same hour for a long time. The custom was
The trial court refused, on request of defendant, to give an instruction that a speed of 12 or 15 miles an hour was not unreasonable or excessive, and that the jury had no right to find defendant guilty of negligence solely on proof of that rate of speed. This ruling is also assigned as error. The point is not well taken. There is testimony which, if believed, tends to show that the engine on the Chicago Great Western track ran faster than 12 or 15 miles an hour. Besides, the custom, facts and circumstances proved made the requested instruction, in the form submitted to the trial judge, inapplicable to the condi
Another assignment of error presented is the admission in evidence of annuity tables issued by the National Life Insurance Company. The judgment cannot be reversed on this ground. It was shown by other proofs that plaintiff was 36 years old at the time of the collision and that he was permanently injured. His expectancy of life and his earning capacity before and after the injury were also shown. It is a well-established rule of evidence that, in .an action for personal injuries resulting in the permanent impairment of plaintiff’s earning capacity, annuity tables may be admitted in evidence and considered by the jury in connection , with other competent proofs. Vicksburg & M. R. Co. v. Putnam, 118 U. S. 545; Baltimore & O. R. Co. v. Henthorne, 73 Fed. 634; McKeigue v. City of Janesville, 68 Wis. 50; Reynolds v. Narfagansett Electric Lighting Co., 26 R. I. 457; 17 Cyc. 422. Defendant asserts, however, that the document introduced by plaintiff shows the prices at which the National Life Insurance Company offers annuities for sale, without proof that such prices are fair and reasonable, and draws the conclusion that the evidence was erroneously admitted. According to the proofs applicable to this question, the tables introduced in evidence show the lowest rate at which annuities can be purchased. They were therefore at least as favorable to defendant as rates proved according to the standards demanded by it. When all the testimony relating to these tables is considered, error in admitting them does not affirmatively appear.
Under the final assignment of error the verdict for $16,000 is vehemently assailed as excessive, but the reasons urged by defendant for setting it aside on that ground do not seem to be sufficient to warrant an interference with the work of the jury. There is no definite rule for measuring some of the damages inhering in the verdict. The injuries inflicted by defendant were distressing, and the .amount allowable for pain and suffering cannot be com
Affirmed.