90 N.J.L. 206 | N.J. | 1917
The opinion of the court was delivered by
The suit wlas for overflowing plaintiff’s lands by water, and the complaint, in two counts, alleged two different dates when such overflow occurred. The jury found for plaintiff in the sums of $179.18 on the first count, and $2,935.66 on the second count.
Plaintiff was the owner and occupier of a coal and lumber yard on the northwest corner of Cortlandt and Jerolaman streets in Belleville., Jerolaman street runs substantially east and west. One block wjest of Cortlandt street and running parallel with it is the Paterson and Newark branch of the Erie railroad. A block further west, up a sharp grade, is Washington avenue, an important highway between New-, ark and Paterson. Next west of Washington avenue, and still further up the hill, is Linden avenue. North of Jerolaman street and east of Linden avenue was a spring, whose overflow ran generally slightly south of east, always to the north of Jerolaman street, passing under Washington avenue down the hill, under the railroad through a culvert, and
hdie second count, as amended, rested on the sanie acts of defendant in diverting the water, and in addition charged that early in 1912 the town connected the natural water course with, a covered drain just east of plaintiffs premises, and put catch bars across the opening, so that in March, 1912, during storm conditions, the excessive volume of diverted water flooded plaintiffs premises as before and .in addition the opening of the covered drain became blocked by debris caught by the bars and the water backed up on plaintiffs premises.
1. There was a motion to nonsuit on each count, and it is now urged that there should at least have been a nonsuit as to the first count. Eor this, the ease of Miller v. Morristown, 47 N. J. Eq. 62, affirmed in this court in 48 Id. 645, is relied on as the leading authority. The argument proceeds on the assumption that plaintiff’s evidence showed nothing more than a regrading of streets and diversion of water consequent thereon. If this were true, defendant’s point would bo well taken under the first branch of the Miller case; but the evidence tends to show in addition, and the jury evidently found, that water flowing down Jerola
2. The same considerations dispose of the point that there should have been a direction of verdict for the defendant. There was a fair conflict of evidence, and a direction would have been improper.
3. Error is further charged in that the court permitted evidence of changes made by defendant in the drainage system after the .injuries complained of.
. Ordinarily it may be conceded such evidence is irrelevant and injurious, in tending to operate as an admission of guilt. In the present case, however, it came in on the cross-examination of defendant’s engineer, who had denied in his testimony that the flood water had run dowtn the street in any such quantity as to do material damage to the roadway and lead defendant to provide for it in other ways. This was a material point in plaintiff’s case, and to meet it he was entitled to bring out that defendant had taken care of this storm water by a special sewer; the inference, of course, being that unless there were a material amount of storm water, the culvert would not have been built, and its building was •evidential of the incorrectness of the witness’ statement. In this aspect it was competent; its incidental harmfulness as tending to show an admission of liability could and should
4. Finally, it is claimed that the court erred in charging the jury as follows in response to plaintiff’s request:
“If the jury find (hat, at the time complained of, water which in its natural course according to the grade of streets and levels of adjacent property, would not have reached plaintiff’s laud, was artificially collected and diverted by the town to the plaintiff’s land, to his damage, it will not excuse the town that the water years before, by another route, liad reached the watercourse that ran through plaintiff’s land. In other words, if on the 11th of November, 1911, and the 12th and 13th of March, 1912, water which would not have come to the plaintiff’s land in any way was thrown upon it, the fact that at some prior time it had come upon file plaintiff’s land by some other course is past history Which does not concern the court and jury.”
The objection to this instruction, stated in the language of appellant’s brief, is this: That the jury were told “that they were not concerned with the question whether the same volume of water, from the same sources, prior to the acts of defendant would or would not have reached plaintiff’s land by the natural watercourses of the surrounding country.”
If by “acts of defendant” counsel means the general system of regrading, rather than the particular act of diversion at the crossing of Washington avenue, the charge was correct. ' Tf, as was held in Miller v. Morristown, the town might lawfully adopt a new set of grades causing incidental changes in drainage, it is that system, and not, the natural drainage of an uninhabited country to which owners are to conform and which they are entitled to assume will he maintained. If by “acts of defendant” the particular diversion is meant, we answer that a reading of the instruction will demonstrate that no such interpretation as that indicated by appellant can reasonably be placed upon it; for the comparison is between the “natural course, according to the grade
The judgment will be affirmed.
For affirmance—The Chancellor, Chief Justice, Garrison, Swayze, Trenchard, Parker, Bergen, Minturn, Kalisoh, Black, White, Hbppenheimer, Williams, Taylor, Gardner, JJ. 15.
For reversal—Hone.