Jacob ARNOW, Eckhard Festag, David Kraft, Susan Michetti,
Patricia Schaffner, and Abe Sklar, Petitioners,
v.
UNITED STATES NUCLEAR REGULATORY COMMISSION, Respondent,
and
Commonwealth Edison Company, Intervening Respondent.
No. 87-1732.
United States Court of Appeals,
Seventh Circuit.
Argued April 5, 1988.
Decided Feb. 3, 1989.*
John L. Stainthorp, Peoples Law Office, Chicago, Ill., for petitioners.
Charles E. Mullins, U.S. Nuclear Regulatory Com'n, Washington, D.C., Philip P. Steptoe, III, Sidley & Austin, Chicago, Ill., for respondent.
Before RIPPLE, MANION and KANNE, Circuit Judges.
RIPPLE, Circuit Judge.
The petitioners, various persons residing in Illinois,1 seek review of a final order of the respondent, the Nuclear Regulatory Commission (NRC), denying their request for issuance of an order to show cause why certain nuclear power plants owned and operated by the intervening respondent, Commonwealth Edison Company (CECo), should not be suspended from operation and retested. The petitioners' primary concern is that the containments of those nuclear power plants might be inadequate to prevent the spread of radioactive material during a nuclear accident. In denying the petition, the Director of the NRC's Office of Nuclear Reactor Regulation (NRR) determined that the concerns of the petitioners were groundless. Because we hold that section 701(a)(2) bars our review, we deny the petition for want of jurisdiction.
* Background
A. Procedural Posture
The petitioners commenced this action by filing a petition with the NRC on August 30, 1986. The petition, captioned an "Emergency Relief Petition," alleged that deficient leak-rate testing of nuclear containments at CECo nuclear power plants had created an unsafe situation. The petition requested the NRC to issue an order to show cause upon CECo to explain "why the operating license of the Unit 1, Zion Nuclear Power Plant, and same of the Unit 1, LaSalle County Nuclear Power Plant, and same of the Unit 1, Byron Nuclear Power Plant should not be suspended and containment systems thereof be retested in accordance with Appendix J to 10 C.F.R., Part 50." R.D503 at 1.2
On October 22, 1986, Harold C. Denton, the Director of the NRR, acknowledged receipt of the petition by publishing a notice in the Federal Register. At that time, he denied the petitioners' request for emergency relief, but noted that the NRC would review the petition and would issue a formal ruling within a reasonable time. See Petitioners' App. at 26 (copy of notice filed with the Office of the Federal Register). In a written decision on February 10, 1987, he denied the petition. The Director filed the decision with the office of the Secretary of the NRC. The NRC declined to undertake a discretionary review and therefore the Director's decision became final agency action on March 10, 1987.3 The petitioners timely filed their petition for review with this court on May 8, 1987.4 Thereafter, CECo filed a brief as an intervening respondent.
Subsequent to the filing of the petitioners' petition for review, the respondents filed a motion to dismiss the petition for want of jurisdiction. On October 15, 1987, this court issued an order which stated that "respondents' motion to dismiss will be considered with the merits of this appeal by the panel assigned to consider this case." Citizens of Illinois v. NRC, No. 87-1732, order at 2 (7th Cir. Oct. 15, 1987).
B. Facts
The petitioners challenge certain tests conducted by CECo, and approved by the NRC, on the containments of three nuclear power reactors owned and operated by CECo. The containment at a nuclear power plant basically is a large shielding structure that surrounds the nuclear reactor. This shield is designed to contain radioactive material in the event of a nuclear accident. An effective containment therefore ensures that any exposure of the public to radioactive gases will be minimal. To test the effectiveness of a containment, nuclear power plant licensees conduct leakrate tests. Leak-rate tests are designed to measure how much air might escape under a worst case scenario during a "loss-of-coolant accident."5 Apparently, no two nuclear reactors have the same leak rate due to various factors such as the containment size, and the configuration, location, meteorological and demographic characteristics of the nuclear plant site. See Respondent's Br. at 7.
II
Opinion of the NRR Director
In addressing the merits of the instant case, the Director of the NRR first characterized the contentions of the petitioners as falling into three categories: "(1) allegations regarding the general methodology associated with CILRTs [containment integrated leak-rate tests], (2) allegations concerning the validity of certain CILRTs performed at the Zion Nuclear Power Station Unit 1, in 1982 and 1984, and (3) allegations related to certain computer programs employed by CECO in conducting CILRTs for the Zion, LaSalle, and Byron units." In Re: Commonwealth Edison Co.,
The Director then addressed the third category of allegations in the petition--deficiencies in the computer programs used during the CILRTs at the CECo plants. First, the petition alleged that the program options "EDIT DATA" and "DELETE DATA FILED" were included in the test programs "for the express purpose of malicious falsification of the test record." Id. at 125. The Director determined, however, that "the subject options are a necessary part of the program; they literally permit the compilation of bona fide test data." Id. The Director then addressed the second challenge. The petition alleged that the computer program options called "ERASE" or "WIPE" can remove and switch data from CILRTs without leaving a trace that data were deleted or replaced. In dismissing this challenge, the Director concluded:
Such an option has legitimate uses. The option may be used to purge erroneous data from storage, i.e., sensor data that may have become garbled in transmission to storage memory. The option may also be used to clear the storage memory prior to the start of an actual test, and to facilitate the performance of parameter studies using archived data. The petition is incorrect in stating that the program leaves no record that data were deleted. The fact that data have been deleted can be readily ascertained by examining the time intervals between data sets. The time at which a data set is obtained is not altered by the "WIPE" option. Therefore, since data are acquired at prescribed, uniform intervals, missing data sets are easily detected.
Id.
The Director then addressed and summarily dismissed further challenges that the use of these options would result in an illegal amount of data rejection, that the computer programs could be manipulated to reinstate previously discarded data, and that these computer programs impermissibly affected the weighting coefficients used to calculate the containment air mass and average temperature.6
III
Discussion
Although the District of Columbia Circuit has addressed the merits of a petition for review in this context without first resolving the jurisdictional question, see Lorion v. United States Nuclear Regulatory Comm'n,
1. Contentions of the Parties
The NRC contends that, under the Supreme Court's decision in Heckler v. Chaney,
None of [the Act's] general provisions, all of which are framed in the permissive, provides any guidance on how the agency is to exercise its enforcement discretion, much less requires the exercise of Commission enforcement authority in a particular case. Clearly, under the rationale of Heckler, these Atomic Energy Act provisions do not evidence a Congressional intent to rebut the presumption of nonreviewability that accompanies agency refusal to take enforcement action.
Respondents' Motion to Dismiss at 13.
The petitioners contend that Chaney is distinguishable factually because, unlike the FDA, the NRC already had committed its resources to investigate the allegations in the petition. In addition, they submit that the Atomic Energy Act, unlike the FDCA, provides sufficient law for a court of appeals to apply in reviewing a NRC nonenforcement decision:
In the Atomic Energy Act Congress clearly put a premium upon safety and mandated that nuclear power generation be undertaken with full regard for the health and safety of the public. The NRC has translated this concern into practical rules, which, among other things, mandate that there must be effective containment systems. There is, therefore, no problem in this case in determining what law should apply.
Petitioners' Br. at 17.
2. Analysis
a.
Our jurisdiction to review decisions of the NRC is found in 28 U.S.C. Sec. 2342(4), a provision of the Administrative Orders Review Act, referred to commonly as the Hobbs Act. The Supreme Court explained this provision in Florida Power & Light Co. v. Lorion,
Under 28 U.S.C. Sec. 2342(4), ... the courts of appeals have exclusive jurisdiction over petitions seeking review of "all final orders of the Atomic Energy Commission [now the Nuclear Regulatory Commission] made reviewable by section 2239 of title 42." Title 42 U.S.C. Sec. 2239(b) provides that the Hobbs Act covers review of "[a]ny final order entered in any proceeding of the kind specified in subsection (a) [of section 2239]." Subsection (a) proceedings are those "for the granting, suspending, revoking, or amending of any license." 42 U.S.C. Sec. 2239(a)(1).
Id. at 733,
Id.,
b.
Under the Administrative Procedure Act (APA), 5 U.S.C. Secs. 551-706, final actions of governmental agencies generally are presumed to be reviewable by the courts. See Citizens to Preserve Overton Park, Inc. v. Volpe,
Subsequently, in Heckler v. Chaney,
The Supreme Court held that the court of appeals did not have jurisdiction. Although it noted that the APA provides a presumption of reviewability of agency actions, the Court reasoned that, "before any review at all may be had, a party must clear the hurdle of Sec. 701(a). That section provides that the chapter on judicial review 'applies, according to the provisions thereof, except to the extent that--(1) statutes preclude judicial review; or (2) agency action is committed to agency discretion by law.' " Chaney,
[R]eview is not to be had if the statute is drawn so that a court would have no meaningful standard against which to judge the agency's exercise of discretion. In such a case, the statute ('law'), can be taken to have 'committed' the decisionmaking to the agency's judgment absolutely. This construction avoids conflict with the 'abuse of discretion' standard of review in Sec. 706--if no judicially manageable standards are available for judging how and when an agency should exercise its discretion, then it is impossible to evaluate agency action for 'abuse of discretion.'
Id. at 830,
Consequently, the Court held that a refusal to take enforcement action by an administrative agency is presumptively unreviewable by the courts. Id. at 831,
Despite the presumption of unreviewability, however, the Court noted that "the presumption may be rebutted where the substantive statute has provided guidelines for the agency to follow in exercising its enforcement powers." Id. at 832-33,
provides only that "[t]he Secretary is authorized to conduct examinations and investigations ..." (emphasis added). Unlike the statute at issue in Dunlop, Sec. 332 gives no indication of when an injunction should be sought, and Sec. 334, providing for seizures, is framed in the permissive--the offending food, drug, or cosmetic "shall be liable to be proceeded against." ... The Act's enforcement provisions thus commit complete discretion to the Secretary to decide how and when they should be exercised.
Chaney,
Most recently, the Supreme Court has held that section 701(a)(2) precludes judicial review of personnel termination decisions by the Director of the Central Intelligence Agency because the relevant provision of the National Security Act, 50 U.S.C. Sec. 403(c), "strongly suggests that its implementation was 'committed to agency discretion by law.' " Webster v. Doe, --- U.S. ----,
c.
Only one court has addressed squarely14 the applicability of section 701(a)(2) in the context of a nonenforcement decision by the NRC. See Massachusetts Public Interest Research Group, Inc. v. NRC,
In addressing the same question presented to the First Circuit, we note that, under the analytical framework provided by the Supreme Court, our task must commence with a "careful examination of the statute on which the claim of agency illegality is based...." Webster,
.............................................................
...................
* * *
Finally, the section providing for injunction proceedings under the Atomic Energy Act, much like the injunction provision of the FDCA, 21 U.S.C. Sec. 332, confers broad discretion upon the NRC. See 42 U.S.C. Sec. 2280 ("[w]henever in the judgment of the Commission any person" has or will violate the Act, the Attorney General "may" apply for an injunction); cf. 21 U.S.C. Sec. 332 (providing the FDA with no guidance as to when it should seek an injunction).17
Upon review of "the overall structure of the [Atomic Energy] Act," Webster,
d.
As pointed out by the District of Columbia Circuit in Lorion v. United States Nuclear Regulatory Commission,
In addressing this issue in the context of the regulations promulgated by the National Highway Transportation Safety Administration (NHTSA), the District of Columbia Circuit found no law to apply under the agency's applicable regulation--49 C.F.R. Sec. 552.8. See Center for Auto Safety,
The regulation sub judice provides the court no way to second-guess the weight or priority to be assigned these elements. In particular, it would be unwise, and inconsistent with the broad mandate of the agency under the governing statute, to infer a mandatory allocation of the agency's limited resources from the regulation at issue.
Center for Auto Safety,
Our review of the applicable NRC regulations convinces us that, like the NHTSA regulation, no standard of review is defined. Neither section 2.202, which provides for orders to show cause, nor section 2.206, which provides for requests for action, give us any meaningful "law to apply." See 10 C.F.R. Sec. 2.202 (the "Director of Nuclear Reactor Regulation ... may institute a proceeding to modify, suspend, or revoke a license or for such other action as may be proper by serving on the licensee an order to show cause....") (emphasis supplied); 10 C.F.R. Sec. 2.206(b) ("Within a reasonable time after a request [for a section 2.202 proceeding] ... has been received, the Director of the NRC office with responsibility for the subject matter of the request shall either institute the requested proceeding in accordance with this subpart or shall advise the person who made the request in writing that no proceeding will be instituted in whole or in part, with respect to his request, and the reasons for the decision."). The regulations clearly commit total discretion to the NRC on matters of enforcement. See MassPIRG,
The petitioners contend, however, that other regulations, relating to the testing of containments and the revocation of licenses, provide sufficient law for us to apply. See, e.g., 10 C.F.R. Part 50, App. A (1988); 10 C.F.R. Part 50, App.J (1988). The NRC has failed to respond to the petitioners' citations to these specific regulations. Nevertheless, after a thorough review of these regulations, we do not find that they provide us with the requisite law to apply. The regulations primarily set forth technical factors concerning the design of nuclear reactor containments and the test requirements for "preoperational and periodic verification ... of the leak-tight integrity of the primary reactor containment." 10 C.F.R. Part 50, App.J (1988). These regulations therefore merely set forth the methodology of containment construction and leak-rate testing; they provide no guidelines for the agency to follow in exercising its enforcement powers that we, as a reviewing court, could look to in adjudicating the NRC's decision not to take enforcement action.19 As the Supreme Court succinctly explained in Chaney, "an agency decision not to enforce often involves a complicated balancing of a number of factors which are peculiarly within its expertise."
e.
Despite our determination that the Atomic Energy Act and the regulations promulgated thereunder provide "no law to apply" and fail to rebut the presumption of nonreviewability, we do not hold that every decision of the NRC is insulated from judicial review. In MassPIRG, the First Circuit explicitly noted:
[T]he courts ... may review NRC decisions which undermine its fundamental statutory responsibility to protect "the health and safety of the public." See, e.g., 42 U.S.C. Sec. 2236(c). In Chaney, the Court noted, without deciding, that an agency policy which "is so extreme as to amount to an abdication of its statutory responsibilities" might be reviewable because "the statute conferring authority on the agency might indicate that such decisions were 'not committed to agency discretion.' "
MassPIRG,
Conclusion
Because Congress has not provided us with any meaningful standard of review under the Atomic Energy Act, nor has the NRC under its own regulations, we must dismiss the petition for want of jurisdiction pursuant to section 701(a)(2) of the APA.
DISMISSED FOR WANT OF JURISDICTION.
Notes
Pursuant to Circuit Rule 40(f), this opinion has been circulated among all judges of this court in regular active service. No judge favored a rehearing in banc on the question of this court's jurisdiction to review nonenforcement decisions of the Nuclear Regulatory Commission. Judge Cudahy did not participate in the consideration or decision of this case
The petitioners in this case were captioned "Citizens of Illinois." However, as the NRC points out in its brief, the "petition was filed by a number of individuals, not by any organization." Respondent's Br. at 3 n. 2. The government requests only that the petitioners be listed individually. We note that appeals seeking review of agency decisions are controlled by Rule 15 of the Federal Rules of Appellate Procedure. Rule 15 requires that "the petition [for review] shall specify the parties seeking review and shall designate the respondent and the order or part thereof to be reviewed." Fed.R.App.P. 15(a). We believe that the petitioners have met the strictures of Rule 15. Cf. Torres v. Oakland Scavenger Co., --- U.S. ----,
We also note that the petition did not name the United States as a party respondent. Under the Hobbs Act, 28 U.S.C. Sec. 2344, the United States "shall be" a party. All subsequent pleadings have been served on the United States, and the government acknowledges that, under Federal Rule of Appellate Procedure 15(a), the initial defect is not fatal. See Respondent's Br. at 2 n. 1.; Fed.R.App.P. 15(a) ("The United States shall ... be deemed a respondent if so required by statute, even though not so designated in the petition.").
Specifically, the petition alleged that the testing at the CECo nuclear power plants was defective for five reasons. These five reasons were stated as follows:
(1) The Zion tests used the incorrect weighting coefficients, which was confirmed by the failure of the verification test;
(2) The computer programs used by CECo in the tests allowed impermissible deletion and alteration of data recorded during the test;
(3) Data produced during the Zion 1983 test had in fact been substantially altered and there existed a possibility of using these computer programs to diminish the calculated leak rates for meeting the allowable values;
(4) The tests did not comply with 10 C.F.R. Part 50, App.J in that a test of the Zion containment system in July-August 1984 was followed by a failing verification test and that the NRC thereafter allowed an illegal short duration test;
(5) That the gas mass equation used in calculating the leak rate was inaccurate.
Petitioners' Br. at 4.
A final order of the NRR Director filed with the NRC becomes final agency action if the NRC does not act to reverse or modify the Director's decision within 25 days. 10 C.F.R. Sec. 2.206(c)(1) (1988). Although the NRC's regulations provide that the NRC's review is discretionary, see id., the Sixth Circuit has suggested that "[i]t is apparently the practice of the Commission to review each denial of a Sec. 2.206 petition to assure that the director has not abused his discretion." Dickinson v. Zech,
The petition for review was prepared and signed by Dr. Zinovy V. Reytblatt. Dr. Reytblatt also prepared the original brief on behalf of the petitioners. In an order docketed June 19, 1987, this court stated that "[a]s far as we know, Reytblatt is not an attorney; accordingly, he may not represent anyone other than himself. The brief, therefore, is ordered stricken." The order did not address, however, the petition for review also signed by Dr. Reytblatt. In a similar context, in an opinion authored by then-Judge Stevens, we held that "[e]ven if [a] notice was defective because not signed by a member of the local Bar, such a defect was surely not jurisdictional.... No motion to dismiss the first appeal having been made in this court, we need not consider the significance of the failure to have the notice executed by a member of the local Bar." Tryforos v. Icarian Dev. Co.,
Appendix J of Part 50 to Title 10 of the Code of Federal Regulations contains regulations pertaining to how and when the leak-rate tests should be conducted. As the introduction to Appendix J states:
One of the conditions of all operating licenses for water-cooled power reactors as specified in section 50.54(o) is that primary reactor containments shall meet the containment leakage test requirements set forth in this appendix. These test requirements provide for preoperational and periodic verification by tests of the leak-tight integrity of the primary reactor containment, and systems and components which penetrate containment of water-cooled power reactors, and establish the acceptance criteria for such tests.
C.F.R. Part 50, App.J (1988)
Appendix J further provides that leak-rate tests are to be carried out pursuant to industry standards. The standards followed by CECo were promulgated by the American National Standards Institute (ANSI) in 1981. ANSI/ANS 56.8-1981. The results of the leak-rate tests conducted pursuant to the ANSI standards are expressed as a percentage of the air mass in the containment volume for a twenty-four hour period. The NRC regulations set forth two purposes for such testing: first, it ensures that the licensee can protect the public health and safety in the event of an accident; and second, it indicates structural weak points where gases could escape the containment shield in the event of a loss-of-coolant accident. See generally 10 C.F.R. Part 50, App.J (1988); Respondent's Br. at 7.
The Director succinctly summarized his decision:
The Reytblatt affidavit makes numerous assertions of impropriety which appear to evolve from an imprecise understanding of the functions of certain options typically provided for data control in leak test computer codes, a misinterpretation on [sic] the information appearing on printouts of data sets and a misunderstanding of regulatory requirements in industry guidelines. In any event, while the Staff does not review and approve computer codes used in the industry for the leak rate testing of containment structures, as noted above, NRC inspectors carefully scrutinize all aspects of such testing and obtain raw test data for analysis to independently assess the acceptability of leak rate test results. This has been done for each of the facilities identified by the Petitioners. NRC inspectors have observed CILRTs conducted by CECO and analyzed test data, and have found no evidence of wrongdoing on the part of CECO. The Staff concludes, therefore, that the Petitioners' claims have no technical or safety merit.
N.R.C. at 127
In Dickinson v. Zech,
The intervening respondent, CECo, "takes no position on the question whether the Court has jurisdiction to entertain the Petition for Review." CECo's Br. at 8
Section 2.206 of Title 10 of the Code of Federal Regulations provides in relevant part:
(a) Any person may file a request to institute a proceeding pursuant to section 2.202 to modify, suspend, or revoke a license, or for such other action as may be proper....
(b) Within a reasonable time after a request pursuant to paragraph (a) of this section has been received, the Director of the NRC office with responsibility for the subject matter of the request shall either institute the requested proceeding in accordance with this subpart or shall advise the person who made the request in writing that no proceeding will be instituted in whole or in part, with respect to his request, and the reasons for the decision.
C.F.R. Sec. 2.206 (1988)
Prior to the Supreme Court's decision in Lorion, this court reviewed decisions of the NRC denying enforcement of Sec. 2.206 petitions. See City of West Chicago v. NRC,
In addition, a court's pre- Chaney decision to review an agency's nonenforcement decision need not control that court's post-Chaney jurisdictional analysis of the same sort of agency decision. See Falkowski v. EEOC,
On remand, the District of Columbia Circuit avoided resolution of the issue and proceeded to address, and dismiss, the merits presented by the petitioners. Lorion v. NRC,
Section 701(a) reads:
(a) This chapter applies, according to the provisions thereof, except to the extent that--
(1) statutes preclude judicial review; or
(2) agency action is committed to agency discretion by law.
The NRC has not argued that Sec. 701(a)(1) is applicable in this case.
Chaney,
[Section] 482(b) of the L-MRDA provides that after investigating a complaint, [the Secretary] must determine whether there is probable cause to believe that violations of Sec. 481 have occurred affecting the outcome of the election. Where a complaint is meritorious and no settlement has been reached which would remedy the violations found to exist, the language and purpose of Sec. 402(b) indicate that Congress intended the Secretary to file suit. Thus, apart from the possibility of settlement, the Secretary's decision whether to bring suit depends on a rather straightforward factual determination, and we see nothing in the nature of that task that places the Secretary's decision "beyond the judicial capacity to supervise."
Bachowski v. Brennan,
Nevertheless, two courts of appeals, in dictum, have expressed conflicting impressions concerning the issue of whether there is law to apply under the Atomic Energy Act in the context of an NRC decision not to issue an order to show cause under Sec. 2.206. Compare Dickinson v. Zech,
We are aware that other courts, including our own, have reviewed final orders of the NRC after the Supreme Court issued its opinion in Chaney. However, none of those courts addressed the question of appellate jurisdiction over a final order of the NRC in the context of an NRC nonenforcement decision. See, e.g., Commonwealth Edison Co. v. NRC,
Finally, we note that courts of appeals, including our own, in addressing post-Chaney agency nonenforcement decisions under other statutes, have not hesitated to find those decisions unreviewable because Congress provided no law to apply. See, e.g., Andrews v. Consolidated Rail Corp,
Although the MassPIRG court explained that "[n]one of the parties have argued that the controlling statute, the Atomic Energy Act, provides a standard within the meaning of Chaney,"
We note that the Atomic Energy Act is quite dissimilar from the LMRDA, which the Supreme Court determined in Dunlop provides sufficient law for courts to apply. The relevant section of the LMRDA states:
The Secretary shall investigate such complaint and, if he finds probable cause to believe that a violation of this subchapter has occurred and has not been remedied, he shall, within sixty days after the filing of such complaint, bring a civil action against the labor organization as an entity in the district court of the United States in which such labor organization maintains its principal office to set aside the invalid election, if any, and to direct the conduct of an election or hearing and vote upon the removal of officers under the supervision of the Secretary and in accordance with the provisions of this subchapter and such rules and regulations as the Secretary may prescribe.
29 U.S.C. Sec. 482(b). Accordingly, while the statute arguably gives some discretion to the Secretary of Labor (unlike the Atomic Energy Act, the FDCA, and the National Security Act), the LMRDA contains some clearly defined factors that a court of appeals can apply upon review. See supra note 11. As the Supreme Court explicitly has noted, the LMRDA "quite clearly withdr[aws] discretion from the agency and provide[s] guidelines for exercise of its enforcement power." Heckler v. Chaney,
Similarly, the National Security Act provision that was at issue in Webster provides in relevant part, "the Director of Central Intelligence may, in his discretion, terminate the employment of any officer or employee of the Agency whenever he shall deem such termination necessary or advisable in the interests of the United States...." 50 U.S.C. Sec. 403(c) (emphasis supplied)
See also Lorion,
See Chaney,
The petitioners also contend that 10 C.F.R. Sec. 50.34(a) (1988), 10 C.F.R. Sec. 50.40(a) (1988), and 10 C.F.R. 50.100 (1988) provide us with a sufficient standard for judicial review. However, Sec. 50.34(a) merely sets forth the required contents of a preliminary safety analysis report. Such a report must be included, and prepared by the applicant, in an application for a construction permit. Section 50.40(a) simply provides that in applications for a license, the NRC "will be guided" by the "health and safety of the public." This is essentially the same language contained in the AEA itself. Finally, Sec. 50.100 is an enforcement regulation that, like the statutory enforcement provisions, is worded in the permissive. Accordingly, we do not find that these regulations, either separately or in concert, alter our holding that we have no jurisdiction to review the petition.
The petitioners do not assert that the NRC's general policy statements or previous agency rulings provide us with sufficient law to apply. Nevertheless, we note that the First Circuit squarely addressed and rejected such contentions in MassPIRG,