Jackson County Drain Commissioner v. Village of StockbridgeJackson County Drain Commissioner v. Village of Stockbridge
Plaintiffs appeal as of right an order granting summary disposition pursuant to MCR 2.116(C)(8) to defendants. This case arose when the village of Stockbridge contracted with the Ingham County Drain Commissioner to discharge its excess wastewater into the Jacobs Lake Drain, which flows through the Wild River and Portage River drains and ultimately the Grand River Drain. We affirm.
The Wild River, the Portage River, and the Grand River intercounty drains all flow through Jackson County. The Jacobs Lake Drain is located entirely in Ingham County. The village, which is also located in Ingham County, is outside any of the previously mentioned intercounty drainage districts. Plaintiff Geoffrey Snyder, the Jackson County Drain Commissioner, testified that flooding had historically occurred along all three drains before he was first elected in 1976, and that the flooding had worsened every year since. He admitted that no assessments had been levied since 1918, and that maintenance had not been performed on the drains during the time he had been in office. One of the landowners along the drain testified that one of his parcels flooded seven out of ten springs. He stated that he used to farm other properties along the drain, but abandoned them when he could not harvest a crop as a result of the flooding. He also said he had observed frequent flooding on others’ properties. Another landowner along the drain testified that a couple of times a *276 year — usually after a heavy rain — the Wild River Drain would back up, and the tributaries would overflow their banks.
According to Richard Grant, Jr., a professional engineer hired by the village, the village had historically disposed of its treated effluent by spraying it over crop fields. When the village began having trouble with its existing system’s ability to accept new flow, it hired Grant’s firm to explore other discharge alternatives. The firm investigated several alternatives, including discharge into the Huron Lake Drain and Snyder’s proposal. The firm recommended continuing to dispose of the wastewater by spray irrigation during the warm months and discharge into the Jacobs Lake Drain during cold weather. After five public meetings and hearings before the Department of Environmental Quality (DEQ), with Snyder participating in at least one of the five, the DEQ issued a finding of no significant impact, the project plan was approved, and funding was received. Although Snyder claimed he objected to the proposed plan, he acknowledged that he did not formally appeal the DEQ’s finding of no significant impact. He wrote the village a letter on October 6, 2002, advising the village that it needed to add its lands to the intercounty drainage district pursuant to
On September 3, 2003, the village and the Ingham County Drain Commissioner entered into an agreement that allowed the village to discharge into the Jacobs Lake Drain. The village agreed to pay the Jacobs Lake Drain a one-time tie-in fee of $30,000 and annual maintenance fees of $1,500. It further agreed it would not discharge at a rate of more than three cubic feet a second and would not discharge when the Jacobs Lake *277 Drain was at 90 percent capacity. The commissioner reserved the right to temporarily suspend the village’s discharge when, in his discretion, he determined that an emergency situation existed. The agreement contained no specific provisions for downstream flooding or payments to the various intercounty drains.
On October 16, 2003, the Grand River Intercounty Drainage Board voted two to one that a permit pursuant to
Plaintiffs essentially argue that the Jacobs Lake Drain, the Wild River Drain, the Portage River Drain, and the Grand River Drain all comprise a single inter-county drain, and that defendants were required to extend the intercounty drain pursuant to either
*278
This Court reviews a trial court’s grant of summary disposition pursuant to MCR 2.116(C)(10) de novo,
Dressel v Ameribank,
The specific language of
Instead,
Because plaintiffs were not challenging the DEQ discharge permit, to withstand summary disposition, they had to present sufficient evidence to raise a genuine issue of material fact concerning whether the proposed discharge was “capable of producing in the drain detrimental deposits, objectionable odor nuisance, injury to drainage conduits or structures, or capable of producing such pollution of the waters of the state receiving the flow from the drains as to injure livestock, destroy fish life, or be injurious to public health.”
The discharge permit issued by the DEQ provided that “[t]he receiving water shall contain no unnatural turbidity, color, oil films, floating solids, foams, settle-able solids, or deposits as a result of this discharge.” It also proscribed the discharge of “solid or viscous pollutants in amounts which will cause obstruction to the flow in the sewerage system resulting in interference .. ..” It allowed a discharge of suspended solids from March 1 to April 30 of up to 100 milligrams a liter a day, not to exceed an average of 70 milligrams a liter a day, and a discharge of suspended solids from November 1 to December 31 and in February of up to 45 milligrams a liter a day, not to exceed an average of 40 milligrams a liter a day. A milligram equals 0.001 *280 grams, there are 1,000 grams in a kilogram, and one kilogram is about the mass of one liter of water. Therefore, at the highest rate, the permitted discharge of total suspended solids was 0.01 percent of the total discharge.
Snyder testified that the village was authorized to discharge effluent at an average rate of 2.7 cubic feet a second. The design capacity for the Jacobs Lake Drain was 650 cubic feet a second. And the Jacobs Lake Drain contributed merely one to five percent of the total flow of the Grand River Drain. Therefore, the total flow of the Grand River Drain was between 13,000 and 65,000 cubic feet a second. The proposed discharge from the village would comprise between 0.0004 and 0.002 percent of this total flow. Of this percentage of the total flow, not more than 0.01 percent would involve suspended solids.
Ann Heyt, a professional engineer who testified for plaintiffs, estimated that the proposed discharge would contribute between 21,000 and 27,000 pounds of sediment a year to the 7 million pounds a year already being deposited in the Portage River. Thus, plaintiffs’ expert estimated that the discharge would contribute 0.3 to 0.39 percent of the total sediment a year. She acknowledged that the amount contributed was a very small fraction of the total, but could not estimate whether the addition of the sediments would make the situation worse because the amount of sediment deposited in a particular area depended on many factors, such as the different flow rates, velocity, elevation, and hydraulics of the stream. Given that even testimony introduced by plaintiffs did not indicate a significant contribution, we conclude that plaintiffs failed to establish that an issue of material fact existed concerning whether the proposed discharge would result in a detrimental deposit.
*281
The next question is whether the village was required to obtain written approval from only the Ingham County Drain Commissioner or was required to obtain written approval from the intercounty drainage board pursuant to
The commissioner shall have jurisdiction over all drains within his county, including those heretofore established and now in process of construction. Drains extending into more than 1 county or affecting lands in more than 1 county, shall be established and constructed in accordance with the provisions of this act regulating the establishment and construction of drains traversing more than 1 county or affecting lands in more than 1 county. Nothing in this act shall be construed as depriving a drain commissioner of jurisdiction or as making any drain an intercounty drain, merely because a drain extends into another county for the purpose of securing a proper outlet and not for the purpose of draining any lands in the other county: Provided, such extension is approved by the drain commissioners and the board of supervisors of each affected county. The portion of any such drain extending into another county shall not be considered in determining the number of signers required to a petition to locate, establish and construct.
Here, although the Jacobs Lake Drain empties into the Wild River Drain, which empties into the Portage River *282 Drain, which empties into the Grand River Drain, the Jacobs Lake Drain and the Jacobs Lake Drain District are located entirely within Ingham County. The Jacobs Lake Drain does not extend into Jackson County to empty into the Wild River Drain. Instead, the Wild River Drain originates in Ingham County. Moreover, there is no indication from the maps provided to the trial court that water or sewage originating in another county empties into the Jacobs Lake Drain.
In any event, whether the Jacobs Lake Drain was considered part of the respective intercounty drains should have been indicated in the order establishing the intercounty drainage districts pursuant to
The trial court granted defendants summary disposition on plaintiffs’ trespass-nuisance count on the grounds that defendants were immune. This Court reviews questions of governmental immunity de novo.
Pierce v City of Lansing,
Nevertheless, plaintiffs argue that because they were only seeking equitable relief,
Pohutski
did not apply. To support their position, plaintiffs rely on
Hadfield v Oakland Co Drain Comm’r,
[Attorney General ex rel] Wyoming Twp [v Grand Rapids,175 Mich 503 ;141 NW 890 (1913)] and Trowbridge [v City of Lansing,237 Mich 402 ;212 NW 73 (1927)] do not support the existence of a public nuisance exception. In the first place, both cases involved plaintiffs seeking only prospective equitable relief in the form, of abatement, to which this Court, in both cases, found they were entitled. As Justice Brickley correctly noted in Hadfield, such cases do not even fall within the purview of governmental immunity and cannot properly be cited in that context.... The distinction between the government’s liability for prospective equitable relief and its liability for retrospective damages or compensation, and the principle that the *284 former kind of liability is generally not barred by sovereign immunity, are fundamental to sovereign immunity law. [Li II, supra at 468-469.] [3]
Pohutski
did not specifically address whether a trespass-nuisance action that merely seeks abatement of the nuisance is barred by governmental immunity. Instead, the Court clearly stated that
Except as otherwise provided in this act, a governmental agency is immune from tort liability if the governmental agency is engaged in the exercise or discharge of a governmental function. Except as otherwise provided in this act, this act does not modify or restrict the immunity of the state from tort liability as it existed before July 1, 1965, which immunity is affirmed.
The plain language of the statute does not limit the immunity from tort liability to liability for damages. As noted in
Pohutski, supra
at 689, governmental immunity is to be broadly construed, while exceptions to immunity are to be narrowly construed. To construe the statute as plaintiffs urge in the instant case would be to construe governmental immunity narrowly. Moreover, such a construction would judicially impose a term into the statute that the Legislature did not provide, which is not permitted.
Polkton Charter Twp v Pellegrom,
*285
In addition, the decisions in both
Hadfield
and
Li II
— with respect to whether a trespass-nuisance action that merely seeks abatement of the nuisance is barred by governmental immunity — were plurality opinions. A plurality opinion of the Supreme Court, in which the reasoning is not supported by a majority of the justices, is not binding on this Court.
Burns v Olde Discount Corp,
A governmental agency is immune from tort liability for the overflow or backup of a sewage disposal system [4] unless the overflow or backup is a sewage disposal system event [5] and the governmental agency is an appropriate *286 governmental agency. [6] Sections 16 to 19 abrogate common law exceptions, if any, to immunity for the overflow or backup of a sewage disposal system and provide the sole remedy for obtaining any form of relief for damages or physical injuries caused by a sewage disposal system event regardless of the legal theory. [7]
The plain language of the statute includes the drains at issue here in the definition of “sewage disposal system.”
Because the village was not discharging into the Jacobs Lake Drain at the time of the instant suit, the village did not qualify as an appropriate governmental agency.
(3) If a claimant, including a claimant seeking noneconomic damages, believes that an event caused property damage or physical injury, the claimant may seek compensation for the property damage or physical injury from a governmental agency if the claimant shows that all of the following existed at the time of the event:
(d) The governmental agency, having the legal authority to do so, failed to take reasonable steps in a reasonable amount of time to repair, correct, or remedy the defect.
(4) In addition to the requirements of subsection (3), to obtain compensation for property damage or physical injury from a governmental agency, a claimant must show both of the following:
*288 (b) The claimant complied with section 19.
There was no evidence that the Ingham County Drain Commissioner or the Jacobs Lake Drain District had the legal authority to repair a defect to a drain that was located in Jackson County. Moreover, there was no indication that plaintiffs complied with
Affirmed.
Notes
“Drain” is defined by
The word “drain”, whenever used in this act, shall include the main stream or trunk and all tributaries or branches of any creek or river, any watercourse or ditch, either open or closed, any covered drain, any sanitary or any combined sanitary and storm sewer or storm sewer or conduit composed of tile, brick, concrete, or other material, any structures or mechanical devices, that will properly purify the flow of such drains, any pumping equipment necessary to assist or relieve the flow of such drains and any levee, dike, barrier, or a combination of any or all of same constructed, or *278 proposed to be constructed, for the purpose of drainage or for the purification of the flow of such drains, but shall not include any dam and flowage rights used in connection therewith which is used for the generation of power by a public utility subject to regulation by the public service commission.
Both Hadfield and Li II involved actions for damages rather than actions solely seeking equitable relief.
3 Li II involved a suit against the city of Ann Arbor and a suit against the city of Jackson. In Pohutski, supra at 682-684, the Supreme Court distinguished between sovereign immunity and governmental immunity, indicating that sovereign immunity applied only to the state, not to lesser forms of government. Thus, it is questionable whether the reasoning in Li II may be applied to lesser forms of government.
4 “Sewage disposal system” is defined as
all interceptor sewers, storm sewers, sanitary sewers, combined sanitary and storm sewers, sewage treatment plants, and all other plants, works, instrumentalities, and properties used or useful in connection with the collection, treatment, and disposal of sewage and industrial wastes, and includes a storm water drain system under the jurisdiction and control of a governmental agency. [MCL 691.1416(j) .]
5 A “sewage disposal system event” is defined by
the overflow or backup of a sewage disposal system onto real property An overflow or backup is not a sewage disposal system event if any of the following was a substantial proximate cause of the overflow or backup:
*286 (¿) An obstruction in a service lead that was not caused by a governmental agency.
(ii) A connection to the sewage disposal system on the affected property....
(Hi) An act of war ... or an act of terrorism.
6 “Appropriate governmental agency” is defined as “a governmental agency that, at the time of a sewage disposal system event, owned or operated, or directly or indirectly discharged into, the portion of the sewage disposal system that allegedly caused damage or physical injury.”
7 The last part of