For convenience these two appeals will be disposed of in one opinion.
The facts in reference to the Ivanhoe case are as follows: On September 23, 1949, the district, acting under the Irrigation District Federal Cooperation Law (Wat. Code, §§23175
This proceeding is in rem in nature. In such an action the only issue involved is the validity of the contract.
Courtney McCracken, the owner of 309 irrigable acres within the district, appeared as the only individual defendant objecting to confirmation. He is a bachelor, so that under the contract he is entitled to have water distributed to only 160 of his acres. He is a nonresident of the district so was unable to participate in the confirmation election held in the district (Wat. Code, § 23220 et seq.). He opposed confirmation, mainly on the ground that the 160-acre limitation was invalid as to him and to his property.
The United States government has never appeared in the action as a party, but the Regional Counsel and the Assistant Regional Counsel of the Department of the Interior received permission to appear as amici curiae in the trial on the side of those seeking confirmation. Federal counsel not only appeared at and participated in the trial of the action in this capacity, but appeared on the prior appeal in this court, on the proceedings in the United States Supreme Court, and have participated in the proceedings now involved in this court.
Counsel for the Di Giorgio Fruit Corporation, the owner of large areas of irrigated and irrigable lands in the San Joaquin Valley in and out of the district appeared as amici curiae in opposition to the confirmation.
The Water Project Authority of the State of California also appeared in the action before judgment, and assumed a
Other amici curiae have appeared on behalf of both sides of this controversy at various stages of these proceedings.
The trial court denied confirmation of this contract on various grounds, and entered its judgment accordingly. 1
The Ivanhoe Irrigation District, the State of California and the Water Project Authority of the state appealed. This court, by a four to three vote, affirmed the trial court.
(Ivanhoe Irr. Dist.
v.
All Parties,
The Madera ease has had substantially the same history. It involves an appeal by the plaintiff Madera Irrigation District and certain of the defendants from a judgment refusing to confirm a proposed contract between the United States, acting by and through the Bureau of Reclamation of the Department of the Interior, and the Madera Irrigation District. The contracts involved in the Ivanhoe and Madera eases are substantially similar. In its prior opinion
(Madera
"As in the Ivanhoe contract the United States undertook to deliver water for irrigation purposes from the Central Valley Project to the district and to expend funds for the construction of a distribution system within the district. This proceeding, also an in rem special proceeding to obtain the confirmation of the proposed contract, was brought by the district pursuant to the provisions of sections 22670 et seq. and section 23225 of the Water Code. The federal law (Omnibus Adjustment Act of 1926, § 46, 44 Stats. 649, 650, 43 U.S.C. § 423e, Federal Reclamation Laws Ann. 318-319) and article 36 of the contract require the validity or invalidity thereof to be determined by a court of competent jurisdiction. The contract in question was entered into on May 14, 1951, by the district acting under the Irrigation District Federal Cooperation Law. (Wat. Code, §§ 23175 et seq.) On the 26th of March, 1951, the California Districts Securities Commission, with reservations, approved the contract (Wat. Code, §§23222, 24253), and the electors of the district subsequently approved it by a vote of 1979 to 755 (Wat. Code, §§23220, 23221, 21925-21935). The district commenced this proceeding on the 21st day of May, 1951. Eighty-six landowners within the district, and four landowners outside of the district filed answers in which they opposed the confirmation of the contract. The State of California and the Water Project Authority of the State of California, by and through the attorney general, filed a joint answer. The state prayed that the contract be validated and a separate prayer recited that the Water Project Authority ‘is not taking any position upon the validity of the contract’ and requested the court to declare that its decree ‘does not purport to be an adjudication of the right or interest of the State of California or its agencies ... or of the right or interest of the United States or its agencies ... in or to the water or water rights . . . involved in the Central Valley Project.’
"After the statutory time for filing an answer had expired, leave of the court was granted the State Engineer of the State of California, acting in his capacity as such and ex-officio as Chief of the Division of Water Resources, Department of Public Works, to file a separate answer by counsel for the Division of Water Resources. The State Engineer took noposition as to the validity of the contract, stating that his object was to protect the state law relating to water use and control. Regional counsel for the Bureau of Reclamation of the Department of the Interior were granted leave by the court to appear as amici curiae and as such participated throughout the proceedings in the trial court in support of the confirmation of the contract.” The trial court (the same court as was involved in the Ivanhoe case) entered its judgment denying confirmation for substantially the same reasons it had set forth in the Ivanhoe case. The findings and conclusions in this case also disposed of certain issues not involved in the Ivanhoe case.
In its prior opinion in the Madera case this court also stated (
The nature of the Central Valley Water Project is fully described in the prior opinion of this court and need not be repeated here (
This court, as in the Ivanhoe case, by a four to three vote, affirmed the judgment with modifications
(Madera Irr. Dist.
v.
All Persons,
In the opinion that follows the parties contending that the contracts between the federal government and the irrigation districts are invalid will be referred to as Objectors. Those seeking confirmation of the contracts and contending they are valid will be referred to as Confirmers.
The Confirmers contend that in its prior decisions this court held that federal law made the state law applicable to these contracts; that under state law the contracts were invalid ; that the United States Supreme Court held that this construction, as a matter of federal law, was erroneous; that it also held that the contracts were valid under federal law; that this being so no questions as to the validity of the contracts remain to be decided; that, in any event, if this court were now to rule that the districts lacked capacity to enter into the contracts the decision would be reviewable by the United States Supreme Court; that in deciding this ease the high court clearly indicated that the question of validity was a federal question; that the election proceedings were valid in that the notice requirements of the Water Code were complied with; that, in any event, the only ones who could object to defects in the notices are voters in the districts; that none of the Objectors are such voters; and that, even if the election notices were defective, the defects have been obviated by subsequent elections on supplementary contracts.
As will be later pointed out at some length, as a result of the United States Supreme Court decision, the issues in these cases have been greatly simplified. In its prior opinions this court held that title to the water was involved, and purported to determine the nature of the state’s title and the title of the United States to such water. It held that all the water involved was held subject to an express trust by the state, and that the federal government, however it secured its rights, held the water subject to the terms of this trust. The United States Supreme Court held that the federal government either
The problem left for determination on the issue of the validity of the contracts is thus now quite simple. The federal government with federal funds has lawfully developed water •—project water—that without the project would not have been developed. The United States and the State of California have provided by appropriate legislation for entering into contracts regarding this water, and have provided certain limitations on its use, so that the water thus developed will reach the ultimate user subject to those conditions. This water belongs to or by appropriate action may. be secured by the United States. In a very real sense it is or will become the property of the United States.
As was stated by the United States Supreme Court
(Ivanhoe Irr. Dist.
v.
McCracken,
“Also beyond challenge is the power of the Federal Government to impose reasonable conditions on the use of federal funds, federal property, and federal privileges. [Citing cases.] The lesson of these cases is that the Federal Government may establish and impose reasonable conditions relevant to the federal interest in the project and to the over-all objectives thereof. Conversely, a State cannot compel use of federal property on terms other than those prescribed or authorized by Congress. [Citing cases.] Article YI of the Constitution, of course, forbids state encroachment on the supremacy of federal legislative action.”
Thus, on the question of the capacity to contract, the only question that was ever involved in these cases jvas whether the United States and the districts have the legal capacity to enter into a contract whereby the United States agrees to sell and the districts agree to buy water subject to conditions. The United States Supreme Court has held the federal government may so contract and that such a contract does not violate due process or deny equal protection of the laws. The only question remaining on this phase of the case is whether the districts have the legal capacity to contract to buy the water under state law. As will be pointed out later, the state law expressly confers such capacity upon irrigation districts. That is the end of this phase of this case.
The arguments of counsel have gone far afield in discussing this issue. Counsel on both sides have conscientiously and
Before directly passing on the issue of capacity of the districts to enter into such contracts, a brief reference to the background facts should be made, and an analysis made of the effect of the opinion of the United States Supreme Court on the prior opinions of this court.
First as to the background facts:
California has a serious water problem particularly in the Central Valley. The state for many years has been attempting to cope with that problem (
One of the main features of the federal Reclamation Act of 1902 under which the Bureau of Reclamation operates is the so-called excess land provision. That provision, section 5 of the act, reads in part: “. . . No right to the use of water for land in private ownership shall be sold for a tract exceeding one hundred and sixty acres to any one landowner, . . (32 Stat. 389, 43 U.S.C. § 431). Section 8 of the act states that “nothing in this Act shall be construed as affecting or intended to affect or in any way interfere with the laws of any State or Territory relating to the control, appropriation, use, or distribution of water used in irrigation, or any vested right acquired thereunder, and the Secretary of the Interior, in carrying out the provisions of this Act, shall proceed in conformity with such laws, . . .’’ (32 Stat. 390, 43 U.S.C. § 383).
Sections 9(d) and 9(e) of the Reclamation Act provide for the type of repayment arrangements which the federal agencies may include in their contracts with the districts. Section 9(d) authorizes contract terms for repayment for the
Irrigation districts are authorized by state law to enter into contracts with the United States. (Wat. Code, § 23195.)
As already pointed out the Ivanhoe district filed this action seeking a confirmance of the contract between it and the federal government. The contract contains both the section 9(d) and section 9(e) features to which reference has been made. Various provisions to secure the payments of the obligations to the federal government are also contained in the contract. Articles 35-37 of the contract deal with the “excess land” provisions. Generally, excess land is defined as irrigable land exceeding 160 acres in ownership of a single person or 320 acres held by husband and wife. 4
The basic holding of this court in these cases was that section 8 of the Reclamation Act left this court free to apply state law. “ [T]he federal government both by legislation and court decision has recognized that the law of this state is determinative of rights to water in this state.” (
After holding that by virtue of federal law the state law was made applicable, this court then ruled that under state law certain provisions of the contracts were invalid, that is the provisions dealing with the 160-acre limitation required by section 5 of the Reclamation Act (
The holding of this court that section 8 of the Reclamation Act made state law applicable to these contracts, was directly reversed by the United States Supreme Court. The high court stated: ‘ ‘ The opinion of the Supreme Court of California turned on an interpretation of ... § 8 of the Reclamation Act of 1902. That section provides that the Act is not to be construed as interfering with state laws ‘relating to the control, appropriation, use, or distribution of water used in irrigation.’ It further provides that in administering the Act the Secretary of the Interior ‘shall proceed in conformity with such laws. . . . ’ The California court held that this provision required the application of California law, and finding the provisions of the contracts contrary thereto, it refused confirmation.” (
The United States Supreme Court then held that this court’s construction of section 8 of the Reclamation Act was erroneous. ‘‘As we read §8, it merely requires the United States to comply with state law when, in the construction and operation of a reclamation project, it becomes necessary for it to acquire water rights or vested interests therein. But the acquisition of water rights must not be confused with the operations of federal projects. As the Court said in
Nebraska
v.
Wyoming, supra,
[
This construction of section 8 of the Reclamation Act, that statute being a federal law, is, of course, binding on this court. Under that interpretation the Supreme Court of the United States has held that section 8 cannot be used to invalidate the contracts by interpreting into them the state law.
It follows, of course, that, as a result of the United States Supreme Court’s construction of section 8 of the Reclamation Act, the holding of this court on the prior appeals that the 160-acre limitation was in violation of the “trust” duties imposed upon the public owners of water rights by state law, was erroneous. This is true because this court thus defined the basic “duty” that it then thought was being violated: "The duty of both of the contracting parties in the performance of their obligations to the landowners in the district is set forth in section 22250 of the Water Code. It is there provided that water distributed by districts shall be ‘apportioned ratably to each landowner upon the basis of the ratio which the last assessment against his land for district purposes bears to the whole sum assessed in the district’ except as provided otherwise in the code. No pertinent exceptions appear.” (
But, as a result of the high court’s ruling with regard to section 8, pertinent exceptions to section 22250
do
appear, namely, Water Code, sections 23197 and 23200. Section 23197 reads in part: “In a contract made pursuant to Section 23196
“ (a) Delivery and distribution of water for the land in the district under the relevant acts of Congress and the rules and regulations thereunder.
“(b) . . (emphasis added).
Section 23200 reads: “All water, the right to the use of which is acquired by a district under any contract with the United States shall be distributed and apportioned by the district in accordance with the applicable acts of Congress, the rules and regulations of the Secretary of the Interior thereunder, and the provisions of the contract, ...”
This court had reasoned that sections 23197 and 23200 were not alternatives to section 22250 because the federal law referred to therein was necessarily controlled by section 8 of the Reclamation Act. Since section 8 made state law applicable, these sections were not “exceptions” to section 22250. However, now that the United States Supreme Court has ruled that this court’s interpretation of section 8 was erroneous, it necessarily follows that sections 23197 and 23200
do
become alternatives to section 22250 with regard to the manner in which water may be distributed under state law. Delivery, distribution and apportionment of water under the authority of these sections may be in accordance with the relevant and applicable acts of Congress, the rules and regulations of the Secretary of the Interior thereunder, and the provisions of the contracts. Since the rule as announced by this court was that “ [T]hc United States cannot administer the corpus of that trust except in the manner defined by the terms of the trust, namely, the applicable water law of this state” (
Thus, even if the holding of this court in its prior opinion in reference to the trust theory were sound, and even if such holding constituted the law of the case, which it does not, it would have no application to the present proceeding. This court in its prior opinion correctly held that the State Legislature may provide rules and regulations for the administration of the trust. This has been done in sections 23197 and 23200. This court stated: “They [as trustees, the state and its agencies] must administer it [the trust] consistently with
In its prior opinion this court held the 160-aere provisions of the contracts unreasonable (
The Supreme Court of the United States also held that the federal law imposing the 160-acre limitation is “reasonable” on its face: “In any event, the provisions under attack are entirely reasonable and do not deprive appellees [“large landowners” within the districts] of any rights to property or water. It is beyond dispute that excess land will be benefited by delivery of water to neighboring and nearby nonexcess land. ... We therefore find no substance in the contention that ‘possible severance’ of the excess acreage will result in damage constituting a taking of property without just compensation. We deem it unnecessary to discuss other claims in this area, but repeat in connection therewith that if the United States takes any compensable water or property right the courts are open for redress.
“As to the claim of discrimination in the 160-acre limitation, we believe that it overlooks the purpose for which the project was designed. The project was designed to benefit people, not land. It is a reasonable classification to limit, the amount of project water available to each individual in orderthat benefits may be distributed in accordance with the greatest good to the greatest number of individuals. The limitation insures that this enormous expenditure will not go in disproportionate share to a few individuals with large land holdings. Moreover, it prevents the use of the federal reclamation service for speculative purposes. In short, the excess acreage provision acts as a ceiling, imposed equally upon all participants, on the federal subsidy that is being bestowed.” ( 357 U.S. 296 .)
The Objectors contend that this court should now rule as a matter of state law that irrigation districts have no legal capacity to enter into the contracts in question with the federal government. It is urged that such districts are instrumentalities of the state and as such may not enter into contracts that would be in violation of its fiduciary duty imposed by California law. Whatever the merits of this argument may have been as long as this court believed that section 8 of the Reclamation Act excluded the application of federal law in determining the rights of the parties, since the Supreme Court has ruled that section 8, properly interpreted, does not exclude the application of section 5, the basic premise of the argument necessarily falls.
As has already been pointed out, the irrigation districts are not violating any fiduciary duty by entering into contracts with the federal government containing the 160-acre limitation. The prior opinions of this court were predicated on the theory that irrigation districts, by entering into such a contract as is here involved, would be violating their fiduciary duty as to the manner in which they can deliver and distribute water under section 22250 of the Water Code. But because of the interpretation placed upon section 8 of the Reclamation Act by the United States Supreme Court it now must be held that section 22250 does not provide the only means of delivery and distribution of water under state law, that is, one of the conditions of the trust now is that under sections 23197 and 23200 such districts may deliver and distribute water in conformity with federal law.
Thus the argument that this court should declare that irrigation districts are not authorized under state law to enter into the contracts with the federal government is entirely without merit. The state Legislature has vested specific authority in the irrigation districts to do this very thing. Section 23195 of the Water Code provides: “Districts may cooperate and contract with the United States under the
The United States Supreme Court time and again pointed out that the Central Valley Project was a federal project. That court also pointed out that the project involved major federal subsidies. This being so the projects are subject to reasonable federal regulation, including the 160-acre limitation.
The following statements of the United States Supreme Court are here pertinent:
“There can be. no doubt of the Federal Government’s general authority to establish and execute the Central Valley and Santa Barbara County projects. As we said in United States v. Gerlach Live Stock Co., supra [339 U.S. 725 (70 S.Ct. 955 ,94 L.Ed. 1231 ,20 A.L.R.2d 633 )], at 739, the Congress ‘elected to treat it [the Central Valley Project] as a reclamation project.’ We upheld its power to pursue the project as ‘clear’ and ‘ample,’ an exercise of the general power ‘to promote the general welfare through large-scale projects for reclamation, irrigation, or other internal improvement.’ Id., [339 U.S.] at 738. ... In developing these projects the United States is expending federal funds and acquiring federal property for a valid public and national purpose, the promotion of agriculture. This power flows not only from the General Welfare Clause of Art. I, § 8, of the Constitution, but also from Art. IV, § 3, relating to the management and disposal of federal property. As this Court said in United States v. San Francisco,310 U.S. 16 , 19-30 [60 S.Ct. 749 ,84 L.Ed. 1050 ] (1940), this ‘power over the public land thus entrusted to Congress is without limitations. “And it is not for the courts to say how that trust shall be administered. That is for Congress to determine.’’’ [Citations.] ” (357 U.S. at 294 [emphasis added].)
With regard to the power of Congress to regulate the use of federal funds, the court used language worth repeating: “Also beyond challenge is the power of the Federal Government to impose reasonable conditions on the use of federal funds, federal property, and federal privileges. [Citing
With regard to the gift nature of the projects, the court stated: “The Central Valley Project is multi-purpose in nature. That portion of the project expense attributable to navigation, flood control, salinity prevention, recreation and fish and wildlife preservation is nonreimbursable [by the State to the Federal Government]. The remainder of the total expense, and the only part that is reimbursable, is divided between two main sources. The first is hydroelectric power which estimates indicate will be chargeable with over 50 percent of the reimbursable expense, plus interest on the part representing electric plants in service. The other is irrigation, which pays the rest without interest charge. In short,
the project is a subsidy, the cost of which will never be recovered in full.
... In the light of these facts we believe that the language of the Court in
Wickard
v.
Filburn,
As already pointed out, as a result of the United States Supreme Court opinion, the legal issues involved are few and relatively simple. In spite of the Objectors’ contentions to the contrary it is crystal clear that certain issues argued by them are not involved.
In the first place there is not involved in these cases any basic conflict between federal policy and law on one hand, and state policy and law on the other. For many years the two governments have peacefully and wholeheartedly cooperated in the planning and construction of this huge project. In the very truest sense of the terms it is and has been a cooperative project. Certainly there is no conflict between the legislative branches of the two governments. All legislation necessary for the project has been passed by the legislatures of the two governments. The federal Congress by the passage of section 5 of the Reclamation Act, has determined, lawfully,
The executive branches of the two governments are also in complete agreement. Not only have they cooperated for many years in the construction of this huge project but in this very case the State of California is a party, and the attorney general, speaking for the state and particularly its executive department, is actively seeking approval of the contracts. The United States, through its legal officers, appears as an amicus curiae urging affirmance of the contracts. The Objectors represent but a small minority of the landowners in the districts involved. As already pointed out, the contracts here involved were all approved by the overwhelming votes of the electors.
It is now also crystal clear that the title of the state or. of the United States to the unappropriated waters of this state is not involved in these cases. The basic error of the prior opinion of this court was in holding that all such waters are held by the state subject to an express trust, and that the federal government, under section 8 of the Reclamation Act, however it gets title to such waters, also holds them subject to the terms of that express trust. But, as already pointed out, the United States Supreme Court held that this basic premise was erroneous. It expressly held that the United States may acquire, by condemnation if necessary, whatever water rights it may need to operate the project, and that after such acquisition such rights are not subject to state control. Thus, whether or not the United States now has complete title to the waters here involved, is totally immaterial to the issues ■involved on these appeals. The only issue before us is whether these contracts should be confirmed. Obviously, the federal government lawfully may contract to sell water that it does not own, as long as it has the legal power to secure title. The United States Supreme Court has declared as a matter of federal law that the United States possesses such power. That holding is binding upon this court. Whether the federal government acquires its water rights by purchase, by direct or inverse condemnation, by appropriation or by any other means is not material to a determination of the question as to whether the contracts are valid or should be confirmed. Whatever title the federal government may need
Much is said in the briefs about the claimed unfairness of the 160-acre provision. As already pointed out, the United States Supreme Court has held it not to be unfair, that no impairment of due process is involved and that equal protection has not been denied.
For the foregoing reasons it must be held that there is no merit to the Objectors' arguments that irrigation districts do not have capacity to enter into the type of contract here involved. As already pointed out, no trust duties are violated by doing so and the state statutes specifically authorize the districts to enter into such contracts. There is no merit in the lack of capacity argument.
In interpreting the contracts here under consideration, this court in its former opinion found that certain features other than the 160-acre provision were objectionable. These provisions dealt with the terms and amount of repayment by the districts to the federal government, the manner in which the federal government was to reconvey certain facilities to the districts after they had been paid for by the districts, and the obligation of the federal government to continue to supply water after termination of the 40-year period of repayment.
This court interpreted the relationship between the United States and the districts to be that of debtor and creditor, (
The objection by this court that the specific amount to be repaid the federal government was not set forth in the
Objection by this court that the contract contained no provision for the passage of title at the end of the 40-year contract period was answered in the following manner by the United States Supreme Court: “ [Ojbjeetion was made to the absence of any provision to the effect that the districts would obtain title to the distribution systems when their obligations therefor had been totally discharged. . . . [W] e see no defect in the failure to guarantee passage of title to the local distributing systems at the end of 40 years when it is contemplated that the obligation therefor shall have been discharged. As we have pointed out, even the terms regarding the distribution systems involve a substantial federal subsidy because no interest is charged over the 40-year period during which the principal amount is repaid. In reality, the districts will
never
repay the total cost of these systems. Moreover, it is likely that for some time beyond the 40-year period of these contracts the districts will remain indebted to the Federal Government for their share of the cost of the water supply facilities. Under such circumstances the retention of title to the distribution systems, at least until the stated obligations of the districts are discharged, seems entirely consistent with what the state court thought
was
a ‘debtor-creditor ' relationship. In view of these considerations, we think it altogether reasonable for the Federal Government and the districts and agency involved to defer the question of title passage to another day.” (
In response to these arguments the United States Supreme Court stated: “We also find the other contract provisions reasonable and necessary. As we have pointed out heretofore the Act of July 2, 1956,
supra,
[70 Stat. 483, 43 U.S.C.A. §485h-l] answered most of the objections lodged against these requirements. That Act required the Secretary, in all § 9(d) and § 9(e) contracts executed after its passage, (1) to include a renewal provision, (2) to provide that during the term of the contract or any renewal thereof the contracting parties shall have ‘first right ... to a stated share or quantity of the project’s water supply,’ and (3) to determine as soon as feasible the total repayment obligation of the contracting parties, crediting against that obligation so much
In regard to the concern expressed by this court that water users of this state might suffer loss of their water rights at the end of the 40-year terms at the discretion of the federal government, the Supreme Court stated: ‘‘Any suggestion that the Congress might be arbitrary in the final accounting, or trample upon any of the rights of appellees, is highly improbable. It does not seem untoward for the recipients of a huge federal bounty to have to depend in small measure on the continued beneficence of their donor. It would be a physical impossibility to withdraw the facilities. As for the possibility of discrimination in the administraton of those facilities, it seems far-fetched to foresee the Federal Government ‘ turning its back upon a people who had been benefited by it’ and allowing their lands to revert to desert. The prospect is too improbable to figure in our decision.” (
Thus, the United States Supreme Court, as a matter of federal law, found that all the provisions of the contract deemed objectionable by the California Supreme Court were valid and reasonable. The high court also noted what appears to be a misconstruction upon the part of this court with regard to the distinction between section 9(d) and section 9(e) contracts: ‘ ‘ The repayment provisions as to the ‘ distribution systems’ require liquidation of the maximum stated expenditure of the United States by installments spread over 40 years, without interest, in accordance with § 9(d) of the Reclamation Project Act of 1939. As to the ‘water supply facilities, ’ such as the dams and reservoirs, the contracts employ the more liberal provisions of § 9(e) of that Act. Repayment, without interest, is to be included in the charge for water sold to the districts and the agency by the United States. The contract term runs for 40 years and, using the language of § 9(e), the water rate is calculated so as to return
The construction the United States Supreme Court placed upon the provisions of the contracts is, of course, binding upon this court. This is so because, as the Supreme Court pointed out, the United States was a party to the contracts and therefore federal law controls their construction: “As to the rights and duties of the United States under the contracts, these are matters of federal law on which this Court has the final word,
Clearfield Trust Co.
v.
United States,
Was the Approval of Electors to the Contracts Ineffective Because of Claimed Defects in the Notices of the Elections at Which Such Contracts Were Approved?
The Objectors have claimed at all stages of these proceedings, and the trial court has found in both of the cases now being considered that the elections at which the contracts were approved were invalid because of defects in the notices of those elections. On the prior appeals these contentions were not considered because the contracts were held to be invalid for other reasons. Now that these contracts have been held valid, it becomes necessary to pass upon these contentions.
The first contention of the Objectors with regard to the election notices is that the notices failed to contain any figure as to the amount of money to be expended by the Ivanhoe and Madera Districts with regard to the construction component “payable within or after the term of the contract as to the water delivery works to bring water to the project delivery point.” It is urged that such a figure is required in the notice of election by reason of section 23223 of the Water Code. That section reads as follows: “Notice of the election shall contain in addition to the information required in the case of ordinary bond elections a statement of the maximum amount of money to be payable to the United States for construction purposes and cost of water supply and acquisition of property, exclusive of penalties and interest, and a general statement of the property, if any, to be conveyed by the district pursuant to the contract.”
In the Ivanhoe case the trial court found: 11 That said election notice does not contain a statement of the maximum amount of construction costs to be paid to the United States, ... as to the portion of the construction costs of the major works of the Central Valley Project used or useful in connection with delivery of water to the plaintiff District and for which the landowners within said District and said District will be called upon to make repayment.”
In the Madera case the notice of election contained the following: “That the rates of payment to be made by the District shall be fixed by the contracting officer of the Department of the Interior, not to exceed $3.50 per acre foot for Class 1 water, and $1.50 per acre foot for Class 2 water, payable each year in advance of the delivery of water for such year.
‘‘That the United States agrees to expend toward the construction of a distribution system, from such funds as may bemade available by appropriation, a sum not in excess of $8,320,000.00, or so much thereof as the contracting officer of the Department of the Interior deems expedient or necessary for the construction of the distribution system to each unit of irrigable land, ...”
The Madera contract provided: “The contracting officer will, on or before February 15 of each calendar year, by a written notice, announce to the District the rates of payment to be made by the District for all water to be delivered to it pursuant to this contract during the ensuing year, but in no event shall the rates so announced be in excess of three dollars and fifty cents ($3.50) per acre-foot for Class 1 water and one dollar and fifty cents ($1.50) per acre-foot for Class 2 water.”
“To the extent that funds may now or hereafter be available by appropriation the United States will expend toward construction of a general distribution and lateral system, surface drainage works, and other related distribution and surface drainage works, all collectively comprising and herein styled the 'distribution system, ’ a sum not in excess of eight million three hundred and twenty thousand dollars ($8,320,000), or so much thereof as the contracting officer deems expedient or necessary for the completion of the distribution system.” “The District will repay to the United States the actual cost, but in no event in excess of eight million three hundred and twenty thousand dollars ($8,320,000), incurred by the United States in providing the distribution system. The obligation defined in this subarticle shall be referred to hereinafter as the 'construction obligation. ’ ”
The trial court in the Madera case found that “said election notice does not state the maximum amount of the construction costs relative to the major works of the Central "Valley Project, nor does said notice state the maximum amount to be paid by the District upon said construction costs (apart from said local distribution system as described in Part B of said contract).”
The Objectors attempt to sustain the trial court’s findings in both eases on the ground that the provision in section 23223 that “the maximum amount of money to be payable to the United States for construction purposes and cost of water supply and acquisition of property” was not complied with in the notice provision.
The trial court and the Objectors misconstrue the requirements of section 23223. The Objectors argue and the trial court necessarily concluded that the words “money . . .
The provision in section 23223 requiring “money . . . for construction purposes” to be included in the notice of election necessarily means only that the notice of election contain the amount to be paid by the district to the federal government for the construction of the
local
distribution systems. The electors have no direct interest in the money to be expended for the construction by the federal government of the central water supply facilities, once the maximum rates to be paid for the water to be supplied by the federal government from those facilities is fixed. This is true because of the fact that the cost of the central water supply facilities will not be reimbursed solely by payments made by irrigation districts for water supplied from such facilities. As the Supreme Court of the United States pointed out: ‘ ‘ The Central Valley Project is multi-purpose in nature. That portion of the project expense attributable to navigation, flood control, salinity prevention, recreation and fish and wildlife preservation is non-reimbursable. The remainder of the total expense, and the only part that is reimbursable, is divided between two main sources. The first is hydroelectric power which estimates indicate will be chargeable with over 50 percent of the reimbursable expense, plus interest on the part representing electric plants in service. The other is irrigation, which pays the rest without interest charge. . . . [I] rrigation interests are bearing but a small fraction of the
The cost to the federal government of constructing the central facilities will of course be somewhat of a factor in the determination of the proper rate to be paid by the districts for the supply of water. But, insofar as this is true, the recitation of the “cost of water supply,” i.e., the rates to be paid by the district, adequately reflects the districts’ share in the expense of constructing the central water supply facilities. A statement of the amount of money to be paid for the construction of the central water supply facilities would thus be a mere repetition of the statement of the “cost of water supply,” and as such is unnecessary under section 23223.
The second contention of invalidity in the election notices relates to the findings of the trial court and the argument of Objectors that the maximum amounts for construction as stated in both the Madera and Ivanhoe election notices were false and fraudulent.
In the Ivanhoe, case the trial court found “that the notice of election specifically represented to the voters within said District that a distribution system to each unit of not exceeding 160 acres of land within a total of 10,000 acres of land within said district would be constructed under said contract by the United States at a cost of not to exceed $1,589,807.00, ivhich said cost was to be repaid in 40 equal annual installments without interest. That in truth and fact said notice of election and said proposition as noticed in said notice of election was false and fraudulent and a misrepresentation of the terms and provisions of said contract. . . .”
The above quoted portions of the Ivanhoe notice of election and contract directly controvert the trial court’s finding that the notice misrepresented the terms of the contract. The contract stated that a distribution system would be built by the federal government for a maximum of $1,589,807, and the notice of election precisely summarized such provisions.
The argument of Objectors appears to be based on the fact that during the course of the trial below in Ivanhoe the United States and the District renegotiated their contract with the result that the total maximum amount for construction costs was increased from $1,589,807 to $2,276,000. In some way, this is supposed to have constituted a fraud upon the electors.
' The circumstances surrounding this change in amount correctly are set forth in the appellant’s oral argument oh
The mere fact that the contract was thus amended is used by the Objectors to support their contention that the contracting parties were in bad faith from the beginning, and never intended the figure in the notice of election to be binding. This contention lacks any merit. Obviously, the contracting parties, whether they be private persons or governmental agencies, by mutual consent have the power and the right to renegotiate and modify the terms of their existing contracts (Civ. Code, § 1698), provided that, if they are governmental agencies, they comply with all the conditions precedent to the validity of their contracts with each other. The amendatory contract here involved did so comply since it had been “authorized at an election. ’ ’ The mere renegotiation and modification of the contract, in the absence of further facts, cannot possibly support the finding of fraud.
Also in support of its conclusion that fraud existed, the trial court found: “The United States now claims that the United States is under no obligation under said contract herein sought to be validated . . . and claims that the United States in the construction of said distribution system . . . may add to and charge in excess of said $1,589,807.00 by such amount and to such extent as the Secretary of Interior may from time to time determine, . . . That said Secretary has now indicated that the additional costs considered by the Secretary to be the costs of such distribution system is, and will be, at least $686,193.00.”
This alleged finding was improper. The United States was not a party to the proceedings below, and any of its “claims” were not properly before the court. The duty of the trial court was to determine whether or not the contract was valid and entitled to confirmation. It was not to determine what the various parties claimed were their rights and duties under the contract. Such claims could be settled only by adjudication between the parties themselves.' Thus the claims
Apparently this finding was based upon the amendatory contract which Ivanhoe attempted to get before the trial court. If the court simply meant that the United States “claims” that it may renegotiate with the water districts and enter into new contracts subject always to the approval of the voters of the district, the conclusion reached by the trial court was correct. However, such a “claim” under no circumstances could be construed to render the provisions of an original contract “false and fraudulent.”
The findings of invalidity based on falsity and fraud in the election notices in the Madera case are equally unsupported. A reading of the above quoted portions of the notice of election and the contracts in the Madera ease demonstrates that the notice of election accurately summarized the contract" provisions relating to the maximum cost of construction for the distribution system.
The Objectors’ argument that the maximum amounts in the election notice were false and fraudulent is based on grounds similar to those raised in the Ivanhoe ease. The Objectors cite the testimony of certain directors of the Madera district for the proposition that “after the election the board of directors of the Madera District passed a resolution to satisfy the Bureau of Reclamation that the district would pay the increase over the $8,320,000 whatever it might be.” The cited testimony does not establish that the Madera Board of Directors passed such a resolution at the behest of the Bureau of Reclamation. The witness did testify that there had been discussions with the Bureau of Reclamation with regard to a possible increase in the maximum construction cost, but that any such resolution or proposition would “have to go back to the people.”
What was said with relation to the “falsity” of the Ivanhoe election notice is applicable here. The public parties to these contracts have a right to renegotiate and modify the provisions of existing contracts, so long as they comply with conditions precedent to the contracts’ validity, such as submitting the modifications to a vote of the electors within the district. It appears from the cited testimony that during the course of the trial of the Madera case the district and the Bureau of Reclamation were in the process of such renegotiation. This fact does not render the original contract and. proceedings leading thereto invalid. There is no contention
‘ ‘ [W] e talk it over and then pass a Resolution that we will try to see a thing through, just like anything else, it still has to go hack to the people(R.T. 149.)
The trial court also found that “said election notice is ambiguous, indefinite and uncertain, in that it cannot be ascertained therefrom, whether the United States will construct a distribution system of each unit of 160 acres of irrigable land within the District for the sum of $8,320,000.00 or whether the United States will expend the sum of $8,320,000.00 for the construction of a partial distribution system.” A reading of the notice of election illustrates that this is based on a misconstruction of the notice. The notice provides: “ [T]he United States agrees to expend toward the construction of a distribution system, from such funds as may be made available by appropriation, a sum not in excess of $8,320,000.00, or so much thereof as the contracting officer of the Department of the Interior deems expedient or necessary for the construction of the distribution system to each unit of irrigable land, no unit comprising more than 160 acres of land, . . . That the district shall assume the operation and maintenance of the distribution system; that the District will repay to the United States the actual cost, but in no event in excess of $8,320,000.00, incurred by the United States in providing the distribution system; ...” The plain meaning of this language is that the United States will build a distribution system for a maximum cost of $8,320,000. This is precisely in accord with the contract: “To the extent that funds may now or hereafter be available by appropriation the United States will expend toward construction of a general distribution and lateral system, surface drainage works, and other related distribution and surface drainage works, all collectively comprising and herein styled the ‘ distribution system, ’ a sum not in excess of eight million three hundred and twenty thousand dollars ($8,320,000), or so much thereof as the contracting officer deems expedient or necessary for the completion of the distribution system.” It is also stated: “The District will repay to the United States the actual cost, but in no event in excess of eight million three hundred and twenty thousand dollars ($8,320,000), incurred by the United States in providing the distribution system.”
The Objectors raise other arguments, and the trial
"There was represented to said voters by means of said newspaper advertisement and said purported notice of election that the design and construction of said distribution system would provide a system for the delivery of water to each unit of not more that [sic] 160 acres of irrigable land within the District at a cost to the District of not to exceed $8,320,000.00 . . . The United States now claims that the United States is under no obligation under said contract herein sought to be validated to construct a complete distribution system to each unit of 160 acres of irrigable land within the District boundaries for said sum of $8,320,000.00. There has been represented to the Board of Directors of said District that said distribution system would cost in excess of $12,000,000.00 and that the total cost thereof over and above said $12,000,000.00 is unknown.”
What the United States ‘1 claims ” it is obligated to do under the contract has already been held to be irrelevant to a determination of the validity of the instant contract. There can be no doubt that the United States and the districts may renegotiate and modify their existing contracts subject to the approval of the voters within the district. Such renegotiation cannot be the basis of a finding of fraud, or a basis for a finding that what appeared in the existing contracts were false statements. According to the trial court’s findings, the newspaper notices published at the behest of the Madera District’s Board of Directors appear to conform to the information as set forth in the notice of election. In this regard, it has already been shown that the notice of election was an accurate summary of the contract. It follows that the findings of the trial court that the newspaper notices were false and misleading are unsupported.
The notice was undoubtedly defective in this respect. But this, alone, is not sufficient grounds to overturn the election. Prom the tenor of the contract, and from the very nature of the project itself it can be assumed, reasonably, that the voting public knew that lands would have to be conveyed by the district to the federal government in order to consummate the project. Thus, the defect was a minor one and may be disregarded.
It is also a general rule applicable to claimed defects in notices of election that any errors or defects therein will not invalidate an election unless there is some showing that the electors were, in fact, misled by such defects
(People
v.
Prewett,
The Confirmers also urge that because the electors in subsequent elections approved modifications of the contracts they ratified the contracts under consideration. It is urged that this precludes any attack on the election procedure in the first election. This contention cannot now be considered because none of the election proceedings in the elections approving modification of the contracts are now before this court.
The Confirmers also contend that none of the Objectors legally may attack the election proceedings because the record does not show that any Objector is a qualified voter within the districts involved. We place no reliance on this contention. The record amply shows that those contracts, if confirmed, will substantially affect the properties of the Objectors. This being so, they should be able to object to the electoral approval of the contracts on proper grounds
(Cf.
For the foregoing reasons we hold that the record does not show any fraud or any defects in the notice of elections sufficient to invalidate the elections in the Ivanhoe and Madera cases. The findings to the contrary are unsupported.
The United States Supreme Court was only asked to review and it did review only those portions of the prior opinions of this court that had held the contracts to be invalid. No review was sought or given to several holdings in the prior opinions to the effect that several provisions of the contracts were valid.
Thus in the Ivanhoe case (
“It is claimed that article 26 of the contract purports to condition the delivery of water to a landowner otherwise entitled to delivery, upon the payment by him of any assessment levied although it has been judicially declared to be a void assessment. It seems unusual that a party should, except under compulsion, contract to pay an assessment declared to be void by a court of competent jurisdiction. But when taken as a reasonable and additional assurance of reimbursements to the United States for expenditures incurred on behalf of the district and to cover operating expenses in furnishing water to the district, it may be deemed a legitimate subject of contract. ’ ’ And at page 647 this court stated : 5
“The trial court in its findings of fact and conclusions of law declared the contract to be invalid on numerous additional grounds not carried into the judgment. Conclusions that the contract is uncertain, lacks mutuality, improperly delegates powers to the Secretary of the Interior, improperly prevents changes in the boundaries of the district, provides unreasonable security measures to the United States and other conclusions not necessary to the judgment are insufficiently supported when considered in connection with the views herein expressed as to the terms under which the parties may properly contract.”
These holdings are applicable to both cases under consideration. They are the law of the ease, are correct and are reaffirmed.
In the Madera case this court made two holdings particularly applicable to the facts of that case. No review of these points were asked of or given by the United States Su
For the foregoing reasons it is apparent that the judgments in the Ivanhoe and Madera cases must be reversed. It is so ordered, with instructions to the trial court to modify its findings of fact and conclusions of law and to enter judgments in the two cases in accordance with the views herein expressed.
Gibson, C. J., Traynor, J., and White, J., concurred.
We concur in the judgments.
While we disagree with many of the statements made in the majority opinion, we see no escape from the main conclusions reached with respect to the validity of the contracts in question, in view of the decision of the United States Supreme Court.
(Ivanhoe Irr. Dist.
v.
McCracken,
Notes
Under the applicable statute if the contract fails of confirmation on one material ground it must fail of confirmation as a whole (Wat. Code, $ 22680).
There were four separate eases dealing with the problems here presented.
(Ivanhoe Irr. Dist.
v.
All Parties,
This point about the election notices was not considered by this court in its prior opinions because the contracts were held to be invalid for other reasons. If the contracts are, as we hold later, valid, then the validity of the election notices must be passed upon.
Of course, the contracts do not affect any water other than project water. Landowners within the districts that have contracted with the federal government retain their rights to existing water supplies, or to any water developed by them not involved in the federal project. In fact the very contracts here involved even recognize that delivery of federal project water will benefit adjoining excess land of the landowner by increasing the underground supply through seepage, and expressly provide that the United States docs not claim “any right, as waste, seepage or return flow to "water being used pursuant to this contract for surface irrigation.”
The United States Supreme Court stated as to these provisions (
It should also be pointed out that there is no reasonable doubt but that the owner of land in excess of 160 acres may receive water for 160 acres (320 if lie is married) without being required to enter a recordable contract for the sale within ten years of his excess holdings. The provi
Thus not only may a large landowner receive water for 160 acres without being required to agree to sell his excess land, but he may supply his excess land with water from sources other than the federal project.
Thus a large landowner may properly realize any increased value to his excess land caused by his own efforts in developing water, and is only denied the unearned increased value caused by using federal project water on his excess holdings.
For comparable rulings in the Madera case, see