154 N.Y.S. 1027 | N.Y. App. Div. | 1915
This action is brought by the Ithaca Trust Company, as executor of the estate of William E. Marion, deceased, to recover damages alleged to have been sustained by the next of kin through the death of testator by reason of the alleged negligence of the defendant. The defendant, a domestic corporation, was the contractor for the construction of a high school building at Ithaca. Plaintiff’s testator was a carpenter employed by the defendant in the construction of such building. On the 16th day of July, 1913, while plaintiff’s testator, hereinafter referred to as the. plaintiff, was engaged upon the work, he fell through the open space between the steel I beams on the first floor above the ground floor and landed in the basement upon his head, some twenty-one feet below, sustaining injuries which resulted in his death. The negligence pleaded and relied upon consists in the alleged violation of some of the provisions of the Labor Law. The complaint, comprising some thirty-eight folios, somewhat in disregard of the requirements of section 481 of the Code of Civil Procedure that there shall be “a' plain and concise statement of the facts constituting each cause of action without unnecessary repetition, ” makes various allegations of negligence, and then reiterates them, and finally alleges that “the failure as herein alleged on the part of said defendant to complete and construct the ground floor of said building, the failure on its part to plank over the first floor, and leaving the same open as above described, and the failure on the part of the defendant to erect a scaffold below the said ‘ I ’ beam, from which said Marion fell, were defects and acts of negligence, and the existence of which were all well known to said defendant and its superintendent at the time of and prior to said accident. ” What legitimate purpose such a pleading can serve is difficult to understand.
The learned trial court in this case charged the jury that no negligence could be predicated upon .the alleged failure to provide a proper scaffolding, and likewise that there was no negligence on the part of the defendant in keeping the opening in the first floor, and then charged that the “ negligence in this case must rest, if at all, in their failure to close up the floor below; the ground floor, through which this decedent fell,
The evidence showed that the work on this building had progressed to a point where the steel I beams had all been placed upon the first floor above the ground floor, and the plaintiff, a carpenter, was engaged in the work of making temporary slings to hold the concrete which was to be filled in between these I beams. There was evidence in the case that his foreman had instructed him to place boards across the superstructure for the purpose of performing the work, and that such material was near at hand for this purpose, but in the view we take of the law, this is not very important. In performing the work the plaintiff sat upon the top of one of these I beams, which was about four and one-half inches wide at the flange, and while leaning down to place the concrete sling blocking which was being done, plaintiff plunged forward and fell headforemost to the basement, twenty-one feet below. The distance to the ground floor was about thirteen feet, and the theory of defendant’s negligence which finally went to the jury was that by reason of there having been a hole left in the ground floor the distance of the fall was increased by nine feet, and that this was the proximate cause of the plaintiff’s injuries, from which the death resulted. The learned trial court, in a memorandum upon a motion for a new trial, concedes that this is speculative, but contents himself with the suggestion that other speculative verdicts have been sustained, and denies the motion. That an experienced carpenter was in any maimer affected by the fact that it was nine feet further to a solid foundation seems too absurd for serious consideration. He was at work under con
Assuming, however, that the jury might properly speculate upon this “ problem of probabilities, ” did the defendant, under the provisions of section 20 of the Labor Law (Consol. Laws, chap. 31 [Laws of 1909, chap. 36], as amd.), owe the plaintiff any duty to have this ground floor entirely completed; did it owe the duty of closing up all of the ground floor space ? The statute makes no such requirement. The language of the act, as amended by chapter 492 of the Laws of 1913, is that “All contractors and owners, when constructing buildings in cities, where the plans and specifications require the floors to be arched between the beams thereof, or where the floors or filling in between the floors are of fire-proof material or brickwork, shall complete the flooring or filling in as the building progresses. * * * If the floor beams are Of iron or steel, the contractors for the iron or steel work of buildings in course of construction or the owners of such buildings shall thoroughly plank over the entire tier of iron or steel beams and extending not less than six feet beyond such beams on which the structural iron or steel work is being erected, except such spaces as may be reasonably required for the proper construction of such, iron
The statute does not require that each floor shall be completed so that there shall be no openings in it. It merely requires that the contractor or owner 1 c shall complete the flooring or filling in as the building progresses,” which means only that the floors and filling in shall be constructed in accordance with the plans and specifications, leaving such “ spaces as may be reasonably required for the proper construction of such iron or steel work, and for the raising or lowering of materials to be used in the construction of such building, or such spaces as may be designated by the plans and specifications for stairways and elevator shafts.” There is no allegation in the pleadings, no evidence in the record, that the open space in the ground floor was not reasonably necessary for the raising or lowering of materials to be used in the construction of the building. The allegation is to the effect that the “said uncovered floor space on the ground floor extended from the east wall to the west wall of said building and was about ten or fifteen feet wide and the center line of said open space ran parallel with the south wall of said building, and about twenty-five or thirty feet distant therefrom. ” It is alleged that defendant ‘ ‘ had also constructed a portion of said ground floor, which was built of fireproof material, as required by the plans and specifications,” and the statute merely requires that they shall “complete the flooring or filling in as the building progresses.” If a portion of the ground floor, built of fireproof material, had been filled in as required by the plans and specifications, with the exception of “about thirty-five hundred (3500) square feet of said ground floor,” constituting an oblong space across the building, the presumption would be that this open space was left for some of the excepted purposes of the statute, and if this was not' the case it was the duty of the pleader to negative this presumption. Clearly there is no absolute duty on the part of an owner or con
The judgment and order appealed from should be reversed, and a new trial granted, with costs to the appellant to abide the event.
All concurred, Smith, P. J., on the first ground stated in the opinion, except Kellogg, J., who dissented.
Judgment and order reversed, and new trial granted, with costs to appellant to abide event.