104 Me. 233 | Me. | 1908
This is an action on the case brought by the Inhabitants of the town of Milford against the defendant corporation to recover the value of the town hall and certain sidewalks and hose, which were the property of the municipality and were destroyed by fire in April 1905. It is alleged that this loss was caused by the negligence of the defendant in failing to perform its contract to supply through its pipes water of sufficient current, pressure and volume to extinguish fires within the range of its hydrants.
A general demurrer to the declaration was filed by the defendant ; and it was stipulated by the parties that the Cause should be heard by the Law Court on the amended declaration, demurrer and joinder, that if the- demurrer was overruled the defendant should have the right to plead anew, and if sustained, the plaintiff should be nonsuited.
The two counts especially relied upon by the plaintiffs are the second count in the original declaration and the "amended count.” The second count is as follows :
"Also for that there was on the 23rd day of July, A. D. 1891 a corporation called the Penobscot Water & Power Company, organized under the laws of Maine, among other things for the purpose of supplying towns and communities with water for domestic use and the extinguishment of fires, and said corporation then and there entered into a contract with the plaintiffs whereby for the sum of $800 per year it agreed, among other things, to supply the plaintiff with sixteen post hydrants, and water for the same before the first day of August, 1892 ; it also agreed that said hydrants would
The "amended count” is as follows :
"In a plea of the case, for that on the 28th day of April, A. D. 1905 the said inhabitants of Milford were the owners of a certain public building. called a Town Hall, of the value of five thousand dollars, and certain planks and timbers constituting a sidewalk of the value of two hundred and fifty dollars, and certain fire hose of the value of two hundred and fifty dollars; and the plaintiffs aver that on said 28th day of April 1905 the defendant had engaged and was bound and obliged to furnish through its mains, conduits, pipes and hydrants, the same being laid and placed in the streets of said plaintiffs’ town, water of sufficient current pressure and volume to extinguish fire within range of said hydrants, and especially and particularly fires originating in or communicated to plaintiffs said building and property, in consideration of the sum of eight hundred dollars per annum paid to it by said plaintiffs; Now the plaintiffs say that on said 28th day of April a.fire started in a board pile at a considerable distance, to wit, a quarter of a mile, from plaintiffs said building and property, which said fire might easily have been extinguished and put out had there been any pressure and volume of water in said mains and hydrants, but the defendant unmindful of the duty and obligations in this behalf wrongfully, carelessly and negligently suffered and allowed said mains, pipes and hydrants to be destitute of any current of water of sufficient pressure,*238 force and volume to be of any value or 'utility in extinguishing said fire or any fire, so that the plaintiffs were unable by the use of the greatest diligence and the strongest efforts to quench the fire in said • pile of boards, although they were in the use of due care in this behalf; and the plaintiffs aver that said fire in said board pile was communicated to the said buildings and property of plaintiffs by sparks, firebrands or cinders, so that the same were utterly burned and consumed, although hydrants were at hand and in close proximity to said buildings and property, and competent and capable men were at hand with suitable hose and appliances ready to extinguish the fires started by said cinders and firebrands upon plaintiffs said building and property and were prevented from doing so solely by the lack and want of water in said hydrants which it was the duty and obligation of said defendant to furnish. And the plaintiffs aver that the sole cause of the said loss and damage was the wrongful neglect of duty of said defendant, to the damage of said plaintiffs (as they say) the sum of six thousand dollars.”
In support of the demurrer the following statement of the defendant’s claims was presented as the basis of the argument in its behalf, viz:
"1. The Company does not agree to extinguish fires or to insure property against loss by fire. Its agreement is simply to furnish a water system and supply it with water. It is impossible to say that failure to furnish water was the proximate cause of the loss, and consequently no action can be maintained to recover for the loss of property by fire; the cause of the loss is too remote and the damages too uncertain to allow of a recovery.
"2. Damages must be such as were in contemplation at the time the contract was made. It cannot be claimed that it was the intention of the company to make good loss by fire for the small compensation which it received for installing its plant.
"3. In making a contract with a water company for the protection of property against fire, the town.acts for the general public good. The town as a property owner derives the same benefit that every other property owner does. The contract does not protect any particular property, but is for the benefit of all.
*239 "4. If an action can be maintained it must be an action of assumpsit. There is no statute or common law duty imposed upon the defendant to furnish water to the municipality. The duty imposed grows out of the contract itself. Recovery, if any there be, must be by virtue of the contract, and not on account of any legal duty independent of the contract.”
The important question thus raised by the pleadings and contentions of the parties has never before been presented to this court, nor, so far as appears, has the precise question ever been directly involved and expressly determined in any jurisdiction, state or federal, in this country, the only analogous case cited by counsel being distinguishable from this in essential particulars. There is no prevailing American doctrine upon the question and no precedent in this State that can in any way embarrass this court in its efforts to reach a solution of the problem that shall appear to be warranted by the well established and fundamental law of contracts, consonant with the principles of justice and sound reason and in harmony with the considerations of public policy involved in the inquiry.
The plaintiffs are a municipal corporation, and by sect. 76 of chapter 4, R. S., such corporations are empowered to "contract for a supply of water, gas and electric light for municipal uses upon such terms as may be mutually agreed .... and may raise money therefor. ” The plaintiff town of Milford was also specially authorized by chapter 331 of the Private and Special Laws of 1891, "to contract with the Penobscot Water and Power Company for a supply of water for municipal and sanitary purposes and for the extinguishment of fires,” and it appears from the averments in the plaintiffs’ declaration that the defendant corporation acquired all the powers, privileges and franchises and assumed all of the obligations of the Penobscot Water and Power Company.
It is provided by chapter 46 of the Private and Special Laws of 1905 that the defendant corporation "shall have, possess and enjoy all of the powers of a corporation formed under the provisions of chapter 47 of the Revised Statutes” of Maine, and it thus appears to have been invested with full power to make contracts and to sue and be sued.
Here then is a formal written contract entered into by parties competent to make it. It is not in controversy that it was complete, definite and certain ; that it was free from misapprehension, fraud or mistake, and entirely fair and reasonable in all its parts. It was not characterized by any lack of mutuality either in the terms of the contract when made or in the remedies available to both parties. The plaintiffs had fully performed the contract on their part and it contains no clause or phrase that would afford the defendant any reasonable ground for claiming exemption either from the legal obligation or the moral duty of performing on its part a contract so manifestly indispensable to the protection of the plaintiffs’ property and so vitally important to the welfare of the people. With respect to the issue presented in this action for negligence the defendant was required to use ordinary care to maintain the pipes and hydrants and furnish water of the current pressure and volume as stipulated
But the demurrer admits the truth of the plaintiffs’ allegations that the defendant "wrongfully, carelessly and negligently suffered and allowed the mains, pipes and hydrants to be destitute of any current of water of sufficient pressure, force and volume to be of any value or utility in extinguishing said fire or any fire.” And the plaintiffs aver that the "sole cause of the said loss and damage was the wrongful neglect of duty of said defendant.”
But it is suggested in behalf of the defendant that the corporation does not agree to extinguish fires or to insure property against loss by fire; that its agreement is simply to furnish a water system ; that it is impossible to say that failure to furnish water was the proximate cause of the loss, and that damages can only be such as were in contemplation at the time the contract was made.
That the defendant did not agree to extinguish fires or to insure property against fire is unquestioned. The statement is true but the argument is fallacious. The conclusion which is evidently sought to be deduced, that the defendant is not liable for the damages resulting solely from a breach of its contract to furnish water to extinguish fires, does not necessarily follow. A corresponding statement directing attention to the particular thing which the defendant agreed to do or not to do, could with equal propriety be made respecting every cause of indirect damages. This method of reasoning obviously excludes from consideration the distinctive character of consequential damages for the breach of a contract, and hence affords no aid in determining the question of liability. In the leading English case of Hadley v. Baxendale, 9 Exch. 353, so often cited as authority in this country, the plaintiffs gave the
Equally pertinent illustrations are readily found in our own State. In Grindle v. Eastern Express Company, 67 Maine, 317, the plaintiff’s intestate delivered $24.90 to the defendant Express Company, at Castine to be sent to Belfast to pay a premium on his life policy which by its terms would lapse in eight days if the premium was not paid. It was held that for failure to deliver the money according to its undertaking the defendant was liable for the net value of the policy on the day it lapsed, on the ground that both parties must be presumed to have contemplated such damages from a knowledge of the circumstances. But the defendant’s only undertaking was to carry a package of money. See also Frye v.
Further apposite illustrations are found in numerous cases involving facts more closely analogous to those at bar. In Watson v. Needham, 161 Mass. 404, the defendant town, acting through its water commissioners, undertook to furnish the plaintiff with water for use in a boiler to generate steam to heat his greenhouse, but omitted to use proper diligence to discover a leak in the main pipe and the plaintiff failed to receive a sufficient supply of water whereby his plants were damaged by freezing to the extent of $400. Here the defendant had not contracted to heat the plaintiff’s greenhouse or to insure his plants against freezing; it had only contracted to furnish water to make steam. But the court held that subject to the right to shut off the water when necessary to make extensions and repairs, which had been expressly reserved, "the town was bound to use reasonable care and diligence to have ready for delivery a sufficient supply of water for the plaintiff’s use so long as the contract remained in force.” The plaintiff was accordingly allowed to recover the full amount of his damage by freezing.
In Stock v. Boston, 149 Mass. 410, a similar contract existed between the parties, and - the plaintiff sustained damage by the freezing of his plants caused by the neglect of the defendant to furnish water according to the contract. It was contended in behalf of the defendant that the damage was too remote, but the court said that the defendant was "liable not only for those injuries j which are caused directly and immediately by his act, but also for such consequential injuries, as according to the common experience of men, are likely to result from his act .... The true inquiry is whether the injury sustained was such as according to common experience and the usual course of events, might reasonably be anticipated.” See also Metallic C. C. Co. v. Fitchburg R. R., 109 Mass. 277; Hand v. Brookline, 126 Mass. 324.
The same doctrine is exemplified in New Orleans & N. E. R. Co. v. Meridian Water Works Co. in the Circuit Court of Appeals, 72 Fed. Rep. 227. This case is precisely analogous to the case at bar, being distinguishable only by the fact that the plaintiff in this
In Knappman Whiting Co. v. Middlesex Water Company, 64 N. J. L. 240 (45 Atl. 692) the Supreme Court of New Jersey on a claim for recoupment set up in an action of contract, rigidly enforced the obligations of the defendant’s contract. In that case the water company in consideration of $600 per year, agreed to furnish the plaintiff company with water "suitable for use in steam boilers and with a pressure sufficient for fire purposes,” but by reason of a leak in the water main and the consequent failure of the company to furnish water according to the contract, the plaintiff’s factory was destroyed by fire causing damage to the extent of $20,000. In an action of contract by the water company to recover the amount due for water supplied, the plaintiff in error presented its claim for recoupment based on the failure of the water company to perform
It will be perceived that in this action of contract the exercise of reasonable care and diligence by the water company was not made the criterion of its liability.
In Skowhegan Water Company v. Skowhegan Village Corporation, 102 Maine, 323, the competency of the parties to make a contract for a constant and ample supply of water "under sufficient pressure for the extinguishment of fires,” and the obligation of the defendant to perform its contract were distinctly recognized. The water company brought suit to recover the rental stipulated in the contract, but the defendant contended that the plaintiff had failed to furnish water of sufficient pressure for the extinguishment of fires, and was therefore not entitled to recover the rental specified. The court sustained a verdict in favor of the defendant, saying in the opinion, "The plaintiff was entitled to recover the fair value of the service, having regard to the contract price and considering how much less the service was worth to the corporation by reason of the plaintiff’s breach of the contract.” .... "The question of
The case of Ukiah City v. Ukiah Water & Imp. Co., 142 Cal. 173, (75 Pac. Rep. 773) is cited by counsel for the defendant as a "case on all fours” with the principal case, and as a direct authority against the plaintiff’s contention. But as already suggested, that case differs materially from this, and is legally distinguishable from it. In that case there was no express contract, written or oral, between the defendant water company and the plaintiff town respecting the quantity of water to be furnished or the manner and means of furnishing it. As stated by the court in the opinion "the same relations existed between the town and the defendant as to the furnishing of water for general fire purposes as ordinarily exist between the private consumer and the water company as to water for domestic purposes.” The water company had not agreed to supply the town with any definite number of hydrants, or specified the number of nozzles for the hydrants, the diameter of. the pipes with which they should be supplied, or the manner in which the hydrants should be placed to afford protection against fire. It had not agreed that its works should be supplied by pumps of any stated capacity, or become bound to furnish through its pipes and hydrants water of "sufficient current, pressure and volume to extinguish fire within the range of such hydrants,” or made any special reference to "fires originating in or communicated to” the property of the municipality. It was principally for want of a contract on the part of the defendant water company to do any specific thing, that judgment was given for the defendant. After enumerating the many cases in different jurisdictions in which it has been held that a water company is not liable to individual owners of property destroyed by fire by reason of its failure to perform its contract to supply the town with sufficient water to extinguish fires, the opinion proceeds to show that Paducah Lumber Co. v. Water Co., 89 Ky. 34, (12 S. W. 445) and Gorrell v. Water Co., 124 N. C. 328,
"Doubtless a water company may so bind itself by contract with a person to furnish him water for the extinguishment of fires as to render itself liable for the value of property of such person destroyed by fire by reason of its failure to furnish him a sufficient supply of water. ... It may be assumed here that it is within the power of a municipality, as a property ówner, to enter into such a contract with a water company for the protection of the property which it owns as a legal individual; but it certainly needs something more than evidence showing an accepted service for general fire purposes to establish such a contract, and the evidence here shows nothing more.”
It has been seen that in the written contract as set out in the plaintiff’s declaration in the case at bar, the defendant water company in consideration of $800 per annum, did expressly agree to furnish water for sixteen post hydrants which should have two nozzles each and be supplied with pipes four inches in diameter, and that its works should be supplied with pumps of a capacity of 1,000,000 gallons per day.
The defendant corporation proceeded to construct and operate its plant and entered upon its public service and the performance of its contract. It well knew that the plaintiff town relying upon its express contract with the defendant would omit to make any other arrangements for the supply of water, or provide any other means for the extinguishment of fires. The defendant’s servants did not need to be informed that the elaborate provisions of the contract respecting the supply of water through its hydrants were for the purpose of affording protection against the destruction of property by fire. They well knew the disastrous results likely to flow from any neglect on their part to perform the contract to furnish water of sufficient volume and pressure to extinguish fires. Under such circumstances damages from loss of property by fire are not only the natural consequences of the defendant’s wrongful neglect but "such as may reasonably be supposed to have been in the contemplation of the parties at the time they made the contract as the probable result of the breach of it.” The injuries sustained are manifestly such as, according to common experience and the usual course of events might reasonably be anticipated. Indeed it is impossible to conceive of any class of contracts, or of contracts relating to any subject matter, with respect to which the consequences of a breach are more palpably natural or more readily anticipated.
Under the stipulation in the report, the defendant is entitled to plead anew in the event that the demurrer is overruled. All of the other objections interposed by the defendant to the maintenance of
When therefore the established principles of law are applied to this case as to all others, and the contract between these parties is held to possess the binding force and efficacy of all other analogous contracts, the conclusion is irresistible that upon proof of the facts stated in the declaration the defendant would be liable to the plaintiffs in an appropriate action, for the damages caused by its negligence in failing to perform a duty arising from its contractual relations with the plaintiffs.
2. But the defendant further contends that the plaintiffs have misconceived their remedy and that if any action can be maintained it must be an action of assumpsit and not of tort.
It is the opinion of the court that this contention is not sustainable either upon reason or authority. As observed by the court in Ashley v. Root, 4 Allen, 504: "This is one of a numerous class of cases where a party may elect to sue either in contract or tort. At common law he might sue in assumpsit for breach of contract or in case for breach of duty.” In that action a principal was allowed to recover in an action of tort against his agent for all the damage caused by a breach of duty by the agent including his neglect to pay over on demand money which he had collected as agent. Either case or assumpsit may also be supported for a false warranty in the sale of goods. Mahurin v. Harding, 28 N. H. 128, (8 Foster, 128). In the opinion the court say: "The warranty is none the less a contract because it is the means by which a fraud is accom
In Am. & Eng. Encyc. of Law, (2nd Ed.) Vol. 28, page 625, it is said : "Case will also lie for a violation of the duty which the contractual relations between the parties involve, in many cases where assumpsit is a concurrent remedy. . . . Although assumpsit will also usually lie for a breach of the contract, action on the case for the breach of the common law duty is often the better remedy. ... It will also lie concurrently with assumpsit for a breach of duty arising out of an express or implied contract.” Burnett v. Lynch, 5 Barn. & Cres. 589. (12 E. C. L. 327) is cited in support of the last statement. In that case the defendant had taken an assignment of a lease subject not only to the payment of rent, but to the performance of the covenants, and had thereby made it his duty to pay the rent and perform the covenants. It was held by Abbott, C. J. that either assumpsit or case was maintainable for a breach of that duty, citing Kinlyside v. Thornton, 2 Wm. Bl. 1111. In the opinion of Bailey, J. it is said: "It is unnecessary to go through the cases in which it has been decided, that although there be an express contract, a party is not bound to resort to that contract as the gist of the action, but he may declare on the tort, and say that the party has neglected to pérform his duty. In Dickson v. Clifton, 2 Wils. 319, there can be no doubt that an action of assumpsit might have been maintained against the captain for not receiving and carrying the corn, or for not taking care of the cargo ; but there the plaintiff described the contract in specific terms, and brought case against the defendant for negligence in the performance of his duty. That could only be because the express contract between the parties created a duty, for the breach of which an action of tort might be maintained.” See also Chitty on Plead. (16 Ed.) Vol. 1, page 162, with the observations of Lord Ellenbourgh on Govett v. Radnidge, 3 East, 70, there cited, and Broom’s Legal Maxims, 201-202 and cases cited.
In the case at bar an action on the case is brought to recover damages for the consequential injuries resulting from the negligent manner in which the defendant company performed a duty created
According to the stipulations in the report, the entry must therefore be,
Demurrer overruled.
Defendant to plead anexo.