TRANSFER ORDER
Before the Panel:
Responding plaintiffs in the Northern District of New York, District of Oregon, and District of Nevada actions responded in support of the motion, as did plaintiff in the Eastern District of Missouri potential tag-along action. The Northern District of New York and Eastern District of Missouri plaintiffs suggest the Eastern District of Louisiana as an alternative choice for transferee district, while the District of Nevada and District of Oregon plaintiffs suggest the District of Nevada. Common defendant Pella Corporation (Pella), however, strongly opposes centralization. If the Panel orders centralization over its objections, then Pella favors selection of the Eastern District of Louisiana as transferee district.
The six actions share factual issues arising from common allegations that Pella’s Architect Series and/or Designer Series aluminum clad windows are defective in that they permit water to enter behind the windows, resulting in premature wood rot and deterioration and causing damage to both the windows and other property, such as drywall, window frames, and floor coverings. More specifically, plaintiffs allege that the windows all suffer from a defect in the design of the sill extrusion and sill nailing fin attachment as well as a defect in the design of allowing a gap between the jamb gasket and the sill gasket.
In opposing centralization, Pella vigorously argues that the actions involve quite different window products, that the windows have multiple different designs and compositions and are manufactured in different plants with different processes and equipment, that each plaintiffs home sustained different damages, and that the windows have very low failure rates, as measured by number of warranty claims received by Pella. The moving Singh plaintiff, on the other hand, points to a report from an engineer who inspected certain Architect Series and Designer Series windows in putative class members’ homes in three states, and who asserts, in an affidavit, that he found the windows suffered from three common defects permitting water leakage. In our view, these arguments go more to the merits of plaintiffs’ claims themselves, than to Section 1407’s requirement that the subject actions involve a common question of fact. On the record before us, we cannot properly assess, for example, whether the fact that an Architect Series window is a casement window rather than a double hung or transom window makes a difference with respect to the common defect alleged. See
We conclude that the Section 1407 requirement of common factual questions is satisfied because the subject actions all plainly allege that the subject windows— whether Architect Series or Designer Series, casement, double hung, single hung, or transom, etc. — are defective in the same ways. Indeed, we note that Pella’s arguments echo, to a significant extent, those that we rejected in our April 2012 decision centralizing MDL No. 2333, In re: MI Windows and Doors, Inc. Products Liability Litigation. See In re: MI Windows & Doors, Inc., Prods. Liab. Litig.,
Pella also argues that all but one of the six constituent actions are brought on behalf of non-overlapping statewide classes, and that thus there is minimal risk of conflicting class certification rulings. Both the Singh action and two of the potential tag-along actions, however, are brought on behalf of putative nationwide classes. Moreover, as we previously have observed, “[m]any MDLs ... encompass non-overlapping classes.” In re: North Sea Brent Crude Oil Futures Litig.,
On the basis of the papers filed and the hearing session held, we find that these actions involve common questions of fact, and that centralization under Section 1407 in the District of South Carolina will serve the convenience of the parties and witnesses and promote the just and efficient conduct of this litigation. As mentioned above, all actions share factual issues arising from common allegations that Pella’s Architect Series and/or Designer Series aluminum clad windows are defective in that they permit water to enter behind the windows, resulting in premature wood rot and deterioration and causing damage to both the windows and other property. Centralization will eliminate duplicative discovery, prevent inconsistent pretrial rulings (in particular with respect to class certification and Daubert issues), and conserve the resources of the parties, their counsel and the judiciary.
After weighing all factors, we have selected the District of South Carolina as transferee district for this litigation. Although no constituent action currently is pending in that district, that is no impediment to its selection as transferee district. See, e.g., In re: Nutramax Cosamin Mktg.
IT IS THEREFORE ORDERED that pursuant to 28 U.S.C. § 1407, the actions listed on Schedule A and pending outside the District of South Carolina are transferred to the District of South Carolina and, with the consent of that court, assigned to the Honorable David C. Norton for coordinated or consolidated pretrial proceedings.
SCHEDULE A
MDL No. 2514 — IN RE: PELLA CORPORATION ARCHITECT AND DESIGNER SERIES WINDOWS MARKETING, SALES PRACTICES AND PRODUCTS LIABILITY LITIGATION
Northern District of Illinois
Gurvinder Pal Singh v. Pella Corporation, C.A. No. 1:13-08226
Eastern District of Louisiana
Christy Andrews, et al. v. Pella Corporation, et al., C.A. No. 2:13-00344
District of Nevada
Mirta Biel-Walters, et al. v. Pella Corporation, C.A. No. 3:13-00553
Northern District of New York
John Romig, Jr. v. Pella Corporation, et al., C.A. No. 5:13-00849
District of Oregon
Pete Arnold v. Pella Corporation, C.A. No. 6:13-01752
Eastern District of Pennsylvania
Philip Adler, et al. v. Pella Corporation, C.A. No. 2:13-06333
Notes
Judge Paul J. Barbadoro and Judge Lewis A. Kaplan took no part in the decision of this matter.
. The Panel has been informed of four related federal actions, pending in the Northern District of Alabama, the District of Minnesota, the Eastern District of Missouri, and the Western District of Washington. Those actions and any other related federal actions are potential tag-along actions. See Panel Rules 1.1(h), 7.1 and 7.2.
. See also In re: Biomet M2a Magnum Hip Implant Prods. Liab. Litig.,