17 N.Y.S. 872 | N.Y. Sup. Ct. | 1892
This is an appeal from the order confirming the report of the commissioners, and it is claimed that the proceedings of the commissioners were irregular, and not in accordance with the statute, and that the commissioners did not award just compensation to the appellant. The first point has already been disposed of upon the appeal from the order denying a motion to vacate and set aside the report of the commissioners, and it is only necessary to consider here the point last made. It is claimed that the commissioners did not make an estimate of the loss and damage, if any, over and above the benefit and advantage, or of-the benefit and advantage, if any, over and above the loss and damage, to the appellant, as required by section 970 of the consolidation act. This objection is founded upon the fact that the commissioners made a map or survey called a “damage map,” upon which they laid out the parcel of land 75 feet in width running from Hinety-Eiglith to Hinety-Hinth street, that being the land included within the line of the street, and the portion of the building included therein. This parcel of land they divided into nine small parcels, and for each made a separate award, amounting in all to $29,248.40. They then made a separate award for the building, it being partly situated upon said nine parcels, of $22,000; the award for land and buildings aggregating $49,248.40. They then had a map made, showing the land on both sides of the avenue, which they divided into separate parcels, and assessed each of these parcels separately. The appellant claims that the amount awarded for the separate parcels of land and for the building could not represent the actual damage to the property, which should have been considered as a whole, for the actual damage was the difference in value of the entire property before and after the improvement. It appears from the affidavit of one of the commissioners that they considered the measure of damages, as far as the buildings were concerned, to be the value of the buildings as they stood before, and what would be the value of the remaining portion after the improvement had been consummated. This, it is claimed, was a method which would -necessarily take into consideration any benefit to the remaining lands and structures, and be the net damage to the appellant. This view, although specious, has really no foundation in fact-. There is no presumption that by taking away a portion of a building it can derive any benefit therefrom, and that it will be more valuable as a building after it has been mutilated than it was before. The record shows
The claim is also made that the commissioners erred in not awarding the value of the property as of July, 1890, when their report was finally presented for confirmation, and was confirmed, but that they reported the value as of the time when they made their report. It is undoubtedly true that in proceedings for the opening of streets the valuation to be fixed by the commissioners is as of the time of the termination of the proceedings, and the closest approach which the commissioners can make to a compliance with this rule is to fix the valuation as of the date of their report. It is impossible for the commissioners to ascertain what will be the valuation of the property at the time the report is finally confirmed. That would be the merest speculation, and, as delays in the confirmation of these proceedings ordinarily arise from the obstacles placed in the way of those whose property is taken, no great hardship seems to result. In the case at bar much of the delay arose from the dilatory proceedings upon the part of the appellant. We think, therefore, that the fact that a considerable time elapsed from the time the report was originally made before it was confirmed in no way affects the correctness of the valuation as given by the commissioners. The order appealed from should be affirmed, with costs. All concur.