ILLINOIS COMMERCE COMMISSION, et al., Petitioners, v. FEDERAL ENERGY REGULATORY COMMISSION, et al., Respondents.
Nos. 08-1306, 08-1780, 08-2071, 08-2124, 08-2239
United States Court of Appeals, Seventh Circuit
August 6, 2009
Rehearing and Rehearing En Banc Denied Oct. 20, 2009
576 F.3d 470
Before CUDAHY, POSNER, and TINDER, Circuit Judges.
Steven J. Ross (argued), Steptoe & Johnson, Washington, DC, for Intervening Petitioner American Electric Power Service Corporation.
Jennifer S. Ammerkhail, Carol J. Banta (argued), Federal Energy Regulatory Commission, Washington, DC, for Respondent Federal Energy Regulatory Commission.
Glen Ortman, Stinson Morrison Hecker, Washington, DC, for Intervening Respondent Old Dominion Electric Cooperative.
Gary J. Newell, Thompson Coburn, Washington, DC, for Intervening Respondent American Municipal Power-Ohio Inc.
Robert A. Weishaar, Jr., McNees Wallace & Nurick LLC, Washington, DC, for Intervening Respondents PJM Industrial Customer Coalition, Coalition of Midwest Transmission Customers.
Jodi Rosen Wine, Elizabeth Ward Whittle, Nixon Peabody LLP, Chicago, IL, for Intervening Respondent Strategic Energy LLC.
Miles H. Mitchell, Office of the People‘s Counsel, Washington, DC, for Intervening Respondent Public Service Commission of Maryland.
Donald A. Kaplan, John L. Longstreth, K&L Gates LLP, Washington, DC, for Intervening Respondent PPL Electric Utilities Corp.
Catherine E. Stetson (argued), Hogan & Hartson LLP, Washington, DC, for Intervening Respondent Virginia Electric and Power Co.
Tamara L. Linde, PSEG Services Corp., Newark, NJ, for Intervening Respondents PSEG Companies and PSEG Energy Resources and Trade.
Peter K. Matt, Bruder, Gentile & Marcoux, L.L.P., Washington, DC, for Intervening Respondent Pepco Holdings, Inc.
David M. Connelly, Dominion Resources Services, Inc., Washington, DC, for Intervening Respondent Public Service Electric & Gas Co.
Michael R. Engelman, Dickstein Shapiro, Kenneth M. Simon, Dickstein Shapiro, Washington, DC, for Intervening Respondent New York Power Authority.
Kenneth G. Jaffe, Alston & Bird, Washington, DC, for Intervening Respondent FirstEnergy Service Co.
Barry S. Spector, Wright & Talisman, Washington, DC, for Intervening Respondent PJM Interconnection.
Rachel Jeanne Lehr, Trenton, NJ, for Intervening Respondent New Jersey Board of Public Utilities.
Gary E. Guy, Baltimore Gas ad Electric Co., Baltimore, MD, for Intervening Respondent Baltimore Gas and Electric Co.
A. Karen Hill, Exelon Corporation, Washington, DC, for Intervening Respondent Exelon Corporation.
David E. Goroff, Bruder, Gentile & Marcoux, L.L.P., Washington, DC, for Intervening Respondent Atlantic City Electric Co.
Denise C. Goulet, Miller, Balis & O‘Neil, P.C., Washington, DC, for Intervening Respondent North Carolina Electric Membership Corp.
Steven A. Weiler, Leonard, Street & Deinard, Washington, DC, Randall Verne Griffin, Dayton Power and Light Co., Dayton, OH, for Petitioner Dayton Power and Light Co.
Margaret E. Comes, Office of the Attorney General, Newark, NJ, New Jersey Bd. of Public Utilities, for Intervening Respondent New Jersey Bd. of Public Utilities.
Duane W. Luckey, Office of the Attorney General, Columbus, OH, for Petitioner Public Utilities Commission of Ohio.
POSNER, Circuit Judge.
We have before us challenges to a decision by the Federal Energy Regulatory Commission concerning the reasonableness of rates for the transmission of electricity over facilities owned by utilities that belong to a Regional Transmission Organization (that is, a power pool) called PJM Interconnection. PJM Interconnection, L.L.C., 119 F.E.R.C. ¶ 61,063, 2007 WL 1748619 (2007), rehearing denied, 122 F.E.R.C. ¶ 61,082 (2008); see
Two issues are presented. The first, raised by American Electric Power Service Corporation and the Public Utilities Commission of Ohio (participation by state commissions in rate proceedings before FERC is authorized by
Had FERC decided that American Electric would not be permitted to charge a price that covered the cost of building a new transmission facility or upgrading an existing one, its decision would have affected the allocation of resources and not just of money. It would have deterred the building of new facilities that benefited customers outside American Electric‘s ser
American Electric points out that some of its existing facilities are not fully depreciated. But it can continue to depreciate them over their remaining useful life in order to create an accounting reserve or obtain a tax benefit. And when it builds a new facility it will be allowed, as we said, to recover the full costs of that facility in its prices.
The company may be trying to extract a monopoly price for the use of its facilities. It stands between western sellers of electricity and their eastern customers and would like to extract a toll for giving the former passage to the latter, a toll that has no relation to its costs of rendering that service. It charged its customers for the costs of building its existing facilities and recovered those costs fully and now wants to recover them all over again from another group of consumers. And it‘s not as if American Electric were being required to provide transmission to the east at zero price. It is permitted to charge for the service—just not to include in the charge its sunk costs.
The second issue relates to the financing of new transmission facilities. Here the Ohio commission joins its Illinois counterpart, representing the interests of the midwestern utilities in PJM‘s region, in objecting to PJM‘s proposed method, approved by FERC, for pricing new transmission facilities that have a capacity of 500 kilovolts or more. Heretofore all new facilities in PJM‘s region have been financed by contributions from the region‘s electrical utilities calculated on the basis of the benefits that each utility receives from the facilities. This will continue to be the rule for facilities with capacities of less than 500 kV. But for the higher-voltage facilities FERC has decided that all the utilities in PJM‘s region should contribute pro rata; that is, their rates should be raised by a uniform amount sufficient to defray the facilities’ costs.
FERC‘s stated reasons are that some of PJM‘s members entered into similar pro rata sharing agreements with each other more than forty years ago and would like to follow that precedent, that figuring out who benefits from a new transmission facility and by how much is very difficult and so generates litigation, and that everyone benefits from high-capacity transmission facilities because they increase the reliability of the entire network. Despite the stakes in the dispute—the new policy might, for example, force Commonwealth Edison to contribute hundreds of millions of dollars to an above-500 kV eastern project called “Project Mountaineer,” when it would not have had to pay a dime under the benefits-based system applicable to lower-voltage transmission facilities—no data are referred to in FERC‘s two opinions (the original opinion and the opinion on rehearing). No lawsuits are mentioned. No specifics concerning difficulties in assessing benefits are offered. No particulars are presented concerning the contri
The objections to the Commission‘s ruling pivot on an asymmetry between the eastern and western portions of PJM‘s region. In the west the electrical generating plants usually are close to the customers—Chicago for example is ringed by power plants. As a result, relatively low-voltage transmission facilities—mainly 345 kV—are preferred. In the east, where the power plants generally are farther away from the customers, 500 kV and even higher-voltage transmission facilities are preferred, because high voltage is more efficient than low for transmitting electricity over long distances. So far as appears, few if any such facilities will be built in the objectors’ service areas, that is, in the Midwest, within the foreseeable future. FERC seems not to care whether any will ever be built, because the reasons it gave for approving PJM‘s new pricing method are independent of where the facilities are located.
The first two reasons the Commission gave can be dispatched briefly. The fact that some of the same members of PJM who agreed to share the costs of such facilities with each other many years ago would like contributions from midwestern utilities carries no weight. The eastern utilities that created PJM refer to themselves revealingly as the “classic” PJM utilities, and the fact that these utilities thought it appropriate to share costs in 1967 says nothing about the advantages and disadvantages of such an arrangement in the larger, modern PJM network.
The Commission said that it would be inclined to defer to “regional consensus,” but acknowledged there was none; the midwestern utilities are members of PJM but did not agree to the eastern utilities’ cost-sharing proposal. As we shall see, the fact that one group of utilities desires to be subsidized by another is no reason in itself for giving them their way.
The second reason the Commission gave for approving PJM‘s pricing scheme—the difficulty of measuring benefits and the resulting likelihood of litigation over them—fails because of the absence of any indication that the difficulty exceeds that of measuring the benefits to particular utilities of a smaller-capacity transmission line. Like the D.C. Circuit in Sithe/Independence Power Partners, L.P. v. FERC, 285 F.3d 1, 5 (D.C.Cir.2002) (citation omitted), we acknowledge “that feasibility concerns play a role in approving rates, indicating that FERC is not bound to reject any rate mechanism that tracks the cost-causation principle less than perfectly.” But we also agree that “the Commission‘s cursory response simply will not do. At no point did the Commission explain how these considerations [that the tariffs and refund mechanism produced ‘efficient price signals,’ and that petitioner‘s requested refunds would somehow disrupt that price signaling, would be ‘infeasible,’ and a matter of ‘unending controversy‘] applied. Why, we wonder, would a different method of refunds, based more closely on cost-causation principles, jeopardize desirable price signaling or be infeasible?” Id.
No doubt the more a transmission facility costs, and therefore the greater the stakes in a dispute between potential con
That leaves for consideration the benefits that the midwestern utilities might derive from the greater reliability that the larger-capacity transmission facilities might confer on the network as a whole. The reason for building such facilities is to satisfy the demand of eastern consumers for electricity, but the more transmission capacity there is, the less likely are blackouts or brownouts caused by surges of demand for electricity on hot summer days or by accidents that shut down a part of the electrical grid. Because the transmission lines in PJM‘s service region are interconnected, a failure in one part of the region can affect the supply of electricity in other parts of the network. So utilities and their customers in the western part of the region could benefit from higher-voltage transmission lines in the east, but nothing in FERC‘s opinions in this case enables even the roughest of ballpark estimates of those benefits.
At argument FERC‘s counsel reluctantly conceded that if Commonwealth Edison would derive only $1 million in expected benefits from Project Mountaineer, for which it is being asked to chip in (by its estimate) $480 million, the disparity between benefit and cost would be unreasonable. The concession was prudent. Algonquin Gas Transmission Co. v. FERC, 948 F.2d 1305, 1313 (D.C.Cir.1991); Pacific Gas & Electric Co. v. FERC, 373 F.3d 1315, 1320-21 (D.C.Cir.2004). As FERC itself explained in Transcontinental Gas Pipe Line Corp., 112 F.E.R.C. ¶ 61,170, 61,924-61,925, 2005 WL 1848553 (2005), “a claim of generalized system benefits is not enough to justify requiring the existing shippers to subsidize the uncontested increase in electric costs caused by the Cherokee project.... The rehearing applicants suggest that the use of the Cherokee shippers’ transportation quantities in deriving the fuel retention percentages and their payment of such charges reduce the fuel costs borne by the existing shippers. However, they point to no evidence in the record that seeks to quantify this benefit, or even shows that such a benefit has occurred.... The Commission concludes that all these alleged benefits are simply too speculative and unsupported to be taken into account.”
FERC is not authorized to approve a pricing scheme that requires a group of utilities to pay for facilities from which its members derive no benefits, or benefits that are trivial in relation to the costs sought to be shifted to its members. “[A]ll approved rates [must] reflect to some degree the costs actually caused by the customer who must pay them.” KN Energy, Inc. v. FERC, 968 F.2d 1295, 1300 (D.C.Cir.1992); Transmission Access Policy Study Group v. FERC, 225 F.3d 667, 708 (D.C.Cir.2000); Pacific Gas & Elec. Co. v. FERC, 373 F.3d 1315, 1320-21 (D.C.Cir.2004). Not surprisingly, we evaluate compliance with this unremarkable principle by comparing the costs assessed against a party to the burdens imposed or benefits drawn by that party. Midwest ISO Transmission Owners v. FERC, 373 F.3d 1361, 1368 (D.C.Cir.2004); see also Alcoa Inc. v. FERC, 564 F.3d 1342, 1346-47 (D.C.Cir.2009); Sithe/Independence Power Partners, L.P. v. FERC, supra, 285 F.3d at 4-5;
No doubt there will be some benefit to the midwestern utilities just because the network is a network, and there have been outages in the Midwest. But enough of a benefit to justify the costs that FERC wants shifted to those utilities? Nothing in the Commission‘s opinions enables an answer to that question. Although the Commission did say that a 500 kV transmission line has twice the capacity of a 345 kV line, it added that “the reliability of 500 kV and above circuits in terms of momentary and sustained interruptions is 70 percent more reliable than 138 kV circuits and 60 percent more reliable than 230 kV circuits on a per mile basis,” PJM Interconnection, L.L.C., supra, 119 F.E.R.C. ¶ 61,063, p. 23; 122 F.E.R.C. ¶ 61,082, p. 16 (emphasis added)—but did not compare the reliability of a 500 kV line to that of a 345 kV line, even though network reliability is the benefit that the Commission thinks the midwestern utilities will obtain from new 500 kV lines in the East.
Rather desperately FERC‘s lawyer, and the lawyer for the eastern utilities that intervened in support of its ruling, reminded us at argument that the Commission has a great deal of experience with issues of reliability and network needs, and they asked us therefore (in effect) to take the soundness of its decision on faith. But we cannot do that because we are not authorized to uphold a regulatory decision that is not supported by substantial evidence on the record as a whole, or to supply reasons for the decision that did not occur to the regulators. E.g.,
We do not suggest that the Commission has to calculate benefits to the last penny, or for that matter to the last million or ten million or perhaps hundred million dollars. Midwest ISO Transmission Owners v. FERC, supra, 373 F.3d at 1369 (“we have never required a ratemaking agency to allocate costs with exacting precision“); Sithe/Independence Power Partners, L.P. v. FERC, supra, 285 F.3d at 5. If it cannot quantify the benefits to the midwestern utilities from new 500 kV lines in the East, even though it does so for 345 kV lines, but it has an articulable and plausible reason to believe that the benefits are at least roughly commensurate with those utilities’ share of total electricity sales in PJM‘s region, then fine; the Commission can approve PJM‘s proposed pricing scheme on that basis. For that matter it can presume that new transmission lines benefit the entire network by reducing the likelihood or severity of outages. E.g., Western Massachusetts Elec. Co. v. FERC, 165 F.3d 922, 927 (D.C.Cir.1999). But it cannot use the presumption to avoid the duty of “comparing the costs assessed against a party to the burdens imposed or benefits drawn by that party.” Midwest ISO Transmission Owners v. FERC, supra, 373 F.3d at 1368. Nor did it in the Western Massachusetts case.
In Midwest ISO, where the objecting utilities contended that they were being asked to pay far more than their share of the benefits—which they said was a measly 5 percent—the court found that they were misrepresenting the record.
To summarize, the petitions for review that concern the pricing of existing transmission facilities are denied, but the petitions concerning the pricing of new facilities that have a capacity of 500 kilovolts or more are granted.
CUDAHY, Circuit Judge, concurring in part and dissenting in part.
I concur fully in the majority‘s approval of FERC‘s rate design for existing facilities’ transmission costs. I write separately to express my concerns over the majority‘s disapproval of the proposed rate design for new transmission lines operating at voltages at or in excess of 500,000 volts.
The United States is now engaged in an urgent project to upgrade its electric transmission grid, which for years has been generally regarded as inadequate,1 and may become more deficient with the addition of major new anticipated loads.2 The existing transmission system originally served vertically integrated utilities that built their own generation relatively close to their customers. The system was not designed for long-distance power transfers between different parts of the country. The inadequacy of the present network and the urgency of the need for its improvement has only been exacerbated by the additional burdens imposed by deregulation (or restructuring), which “unbundled” generation and transmission and created a need to bring power from distant generators.3 Additional challenges have been posed by the demand for power from renewable generation sources (such as wind farms) that are often located in places remote from centers of electric consumption.4
Long-distance transmission, which inherently presents challenges to reliability, is accomplished most efficiently by the highest levels of voltage—500 kV and above. According to FERC, “500 kV and above circuits [are] 70 percent more reliable than 138 kV circuits and 60 percent more than 230 kV circuits on a per mile basis.” PJM Interconnection LLC, 122 FERC ¶ 61,082, 2008 WL 276596, at
It is significant that FERC‘s conclusion that the costs of extra-high voltage transmission facilities should be shared is consistent with the proposals of fifteen of PJM‘s seventeen members. In the course of this proceeding, various parties proposed voltages lower than 500 kV as the threshold above which proportional cost-sharing should apply. Although PJM‘s members were unable to agree on a specific voltage cutoff, they were broadly in agreement that the rate structure should be designed to share the costs of facilities providing general systemic benefits. There was thus an effort by many parties to broaden the area of rate-simplification by enlarging the set of new transmission facilities to be governed by cost-sharing, not to narrow or eliminate it. I think these efforts illustrate the value of simplification and the difficulties in the design of a transmission rate structure that attempts rigidly and in all circumstances to trace benefits to specific utilities.
However theoretically attractive may be the principle of “beneficiary pays,” an unbending devotion to this rule in every instance can only ignite controversy, sustain arguments and discourage construction while the nation suffers from inadequate and unreliable transmission. Unsurprisingly, it is not possible to realistically determine for each utility and with reference to each major project the likelihood that rate-simplification will reduce litigation, or to calculate the precise value of not having to cover the costs of power failures and of not paying costs associated with congestion, and all this over the next forty to fifty years. Concerns about the real value to individual utilities of the stability and efficiency provided by improvements to the backbone grid are answered by their voluntary participation in the power pool and its collaborative “RTEP” (or regional transmission expansion planning) process. Rate-making based on cost causation is assured by this process, since universal cost-sharing is recommended only when developments are found to benefit the integrated system as a whole.7
Indeed, in Midwest ISO, the panel rejected the objecting utility‘s argument that it could not be made to pay sixty to seventy percent of an investment‘s costs because it would obtain only five percent of the benefits. 373 F.3d at 1370. As the majority notes, the panel found no record support for the utility‘s claim that its benefits would be so low. (Maj. Op. at 477.) However, the panel also held that cost causation principles do not require the costs of a new facility to be apportioned based on the objecting utility‘s actual use of that facility. To the contrary, the “benefits” of system enhancements must be understood more broadly than this. Again, then-Judge Roberts:
even if they are not in some sense using the ISO [roughly a term for a power pool], the MISO Owners still benefit from having an ISO. In this sense, MISO is somewhat like the federal court system. It costs a considerable amount to set up and maintain a court system, and these costs—the costs of having a court system—are borne by the taxpayers, even though the vast majority of them will have no contact with that system (will not use that system) in any given year ... The MISO Owners’ position is tantamount to saying that if
construct hundreds of miles of 500 and 765 kV linkages between eastern and western PJM. The PJM literature, to which Commonwealth Edison could have objected but did not, indicates that Project Mountaineer was a response to the nearly 200% increase in congestion costs from 2004 to 2005. Ventyx, Major Transmission Constraints in PJM, at *3 n. 4 (2007), available at http://www.ventyx.com/pdf/wp07-transmission-constraints.pdf (visited 7/14/09). These increased congestion costs were partly due to the expansion of PJM‘s footprint. Id. As part of its cost allocation process, PJM determined that Project Mountaineer “would bring about substantial congestion relief and reliability improvements increasing Midwest-to-east transfers by 5,000 MW.” Id. at *3.
Id. at 1371. I fear that the majority has lost sight of this basic principle.8
Because the majority‘s decision is based on an unusually narrow conception of cost-causation, its characterizations of FERC‘s and the intervenor‘s arguments as “insouciant” (Maj. Op. at 475) and “desperate” (Maj. Op. at 477) strike me as conspicuously misplaced. FERC responded to ComEd‘s objections by indicating that the proposed projects would improve reliability and reduce congestion. See PJM Interconnection, 2008 WL 276596, at *16. It did not explain how PJM‘s members benefit from a reliable network because no court had hitherto required it to do so. Until now, it went without saying that network reliability benefits the network‘s members. This is not insouciance; “[e]xplanations come to an end somewhere.” Ludwig Wittgenstein, Philosophical Investigations § 1 (G.E.M. Anscombe trans., 1968).
The big picture here is that FERC‘s proposal to spread the cost of very high voltage transmission on a uniform basis seems to me in the interest of efficient, high-capacity transfer capability and of the closely linked improvement of reliability, which affects the system generally.9 Deregulation created a demand for competitive sources of power, often at a distance. Because 500 kV and above lines satisfy these new systemic needs, their separate