W. KEVIN HUGHES, CHAIRMAN, MARYLAND PUBLIC SERVICE COMMISSION, ET AL. v. TALEN ENERGY MARKETING, LLC, FKA PPL ENERGYPLUS, LLC, ET AL.
No. 14-614
SUPREME COURT OF THE UNITED STATES
April 19, 2016
578 U. S. ____ (2016)
GINSBURG, J.
OCTOBER TERM, 2015. Together with No. 14-623, CPV Maryland, LLC v. Talen Energy Marketing, LLC, fka PPL EnergyPlus, LLC, et al., also on certiorari to the same court.
Syllabus
NOTE: Where it is feasible, a syllabus (headnote) will be released, as is being done in connection with this case, at the time the opinion is issued. The syllabus constitutes no part of the opinion of the Court but has been prepared by the Reporter of Decisions for the convenience of the reader. See United States v. Detroit Timber & Lumber Co., 200 U. S. 321, 337.
SUPREME COURT OF THE UNITED STATES
Syllabus
HUGHES, CHAIRMAN, MARYLAND PUBLIC SERVICE COMMISION, ET AL. v. TALEN ENERGY MARKETING, LLC, FKA PPL ENERGYPLUS, LLC, ET AL.
CERTIORARI TO THE UNITED STATES COURT OF APPEALS FOR THE FOURTH CIRCUIT
No. 14-614. Argued February 24, 2016-Decided April 19, 2016*
The Federal Power Act (FPA) vests in the Federal Energy Regulatory Commission (FERC) exclusive jurisdiction over wholesale sales of electricity in the interstate market, but “leaves to the States alone, the regulation of [retail electricity sales].” FERC v. Electric Power Supply Assn., 577 U. S. ___. In Maryland and other States that have deregulated their energy markets, “load serving entities” (LSEs) purchase electricity at wholesale from independent power generators for delivery to retail consumers. Interstate wholesale transactions in deregulated markets typically occur through (1) bilateral contracting, where LSEs agree to purchase a certain amount of electricity from generators at a certain rate over a certain period of time; and (2) competitive wholesale auctions administered by Regional Transmission Organizations (RTOs) and Independent System Operators (ISOs), nonprofit entities that manage certain segments of the electricity grid.
PJM Interconnection (PJM), an RTO overseeing a multistate grid, operates a capacity auction. The capacity auction is designed to identify need for new generation and to accommodate long-term bilateral contracts for capacity. PJM predicts demand three years into the future and assigns a share of that demand to each participating LSE. Owners of capacity to produce electricity in three years’ time then bid
Concerned that the PJM capacity auction was failing to encourage development of sufficient new in-state generation, Maryland enacted its own regulatory program. Maryland selected, through a proposal process, petitioner CPV Maryland, LLC (CPV), to construct a new power plant and required LSEs to enter into a 20-year pricing contract (called a contract for differences) with CPV at a rate CPV specified in its proposal. Under the terms of the contract, CPV sells its capacity to PJM through the auction, but-through mandated payments from or to LSEs-receives the contract price rather than the clearing price for these sales to PJM. In a suit filed by incumbent generators (respondents here) against members of the Maryland Public Service Commission-CPV intervened as a defendant-the District Court issued a declaratory judgment holding that Maryland‘s program improperly sets the rate CPV receives for interstate wholesale capacity sales to PJM. The Fourth Circuit affirmed.
Held: Maryland‘s program is preempted because it disregards the interstate wholesale rate FERC requires. A state law is preempted where “Congress has legislated comprehensively to occupy an entire field of regulation,” Northwest Central Pipeline Corp. v. State Corporation Comm‘n of Kan., 489 U. S. 493, 509, as well as ““where, under the circumstances of [a] particular case, [the challenged state law] stands as an obstacle to the accomplishment and execution of the full purposes and objectives of Congress,” Crosby v. National Foreign Trade Council, 530 U. S. 363, 373. Exercising its exclusive authority over interstate wholesale sales, see
That Maryland was attempting to encourage construction of new in-state generation does not save its program. States may regulate within their assigned domain even when their laws incidentally affect areas within FERC‘s domain. But they may not seek to achieve
Maryland‘s program is rejected only because it disregards an interstate wholesale rate required by FERC. Neither Maryland nor other States are foreclosed from encouraging production of new or clean generation through measures that do not condition payment of funds on capacity clearing the auction. Pp. 11-15.
753 F. 3d 467, affirmed.
GINSBURG, J., delivered the opinion of the Court, in which ROBERTS, C. J., and KENNEDY, BREYER, ALITO, SOTOMAYOR, and KAGAN, JJ., joined. SOTOMAYOR, J., filed a concurring opinion. THOMAS, J., filed an opinion concurring in part and concurring in the judgment.
Opinion of the Court
NOTICE: This opinion is subject to formal revision before publication in the preliminary print of the United States Reports. Readers are requested to notify the Reporter of Decisions, Supreme Court of the United States, Washington, D. C. 20543, of any typographical or other formal errors, in order that corrections may be made before the preliminary print goes to press.
SUPREME COURT OF THE UNITED STATES
Nos. 14-614 and 14-623
W. KEVIN HUGHES, CHAIRMAN, MARYLAND PUBLIC SERVICE COMMISSION, ET AL., PETITIONERS
14-614 v. TALEN ENERGY MARKETING, LLC, FKA PPL ENERGYPLUS, LLC, ET AL.
CPV MARYLAND, LLC, PETITIONER
14-623 v. TALEN ENERGY MARKETING, LLC, FKA PPL ENERGYPLUS, LLC, ET AL.
ON WRITS OF CERTIORARI TO THE UNITED STATES COURT OF APPEALS FOR THE FOURTH CIRCUIT
[April 19, 2016]
JUSTICE GINSBURG delivered the opinion of the Court.
The Federal Power Act (FPA), 41 Stat. 1063, as amended,
I
A
Under the FPA, FERC has exclusive authority to regulate “the sale of electric energy at wholesale in interstate commerce.”
“Since the FPA‘s passage, electricity has increasingly become a competitive interstate business, and FERC‘s role
Interstate wholesale transactions in deregulated markets typically occur through two mechanisms. The first is bilateral contracting: LSEs sign agreements with generators to purchase a certain amount of electricity at a certain rate over a certain period of time. After the parties have agreed to contract terms, FERC may review the rate for reasonableness. See Morgan Stanley Capital Group Inc. v. Public Util. Dist. No. 1 of Snohomish Cty., 554 U. S. 527, 546-548 (2008) (Because rates set through good-faith arm‘s-length negotiation are presumed reasonable, “FERC may abrogate a valid contract only if it harms the public interest.“). Second, RTOs and ISOs administer a number of competitive wholesale auctions: for example, a “same-day auction” for immediate delivery of electricity to LSEs facing a sudden spike in demand; a “next-day auction” to satisfy LSEs’ anticipated near-term demand; and a “capacity auction” to ensure the availability of an adequate supply of power at some point far in the future.
These cases involve the capacity auction administered by PJM Interconnection (PJM), an RTO that oversees the
The auction is designed to accommodate long-term bilateral contracts for capacity. If an LSE has acquired a
FERC extensively regulates the structure of the PJM capacity auction to ensure that it efficiently balances supply and demand, producing a just and reasonable clearing price. See EPSA, 577 U. S., at ___ (slip op., at 5) (the clearing price is “the price an efficient market would produce“). Two FERC rules are particularly relevant to
B
Around 2009, Maryland electricity regulators became concerned that the PJM capacity auction was failing to encourage development of sufficient new in-state generation. Because Maryland sits in a particularly congested part of the PJM grid, importing electricity from other parts of the grid into the State is often difficult. To address this perceived supply shortfall, Maryland regulators proposed that FERC extend the duration of the NEPA from three years to ten. FERC rejected the proposal. PJM, 126 FERC ¶62,563 (2009). “[G]iving new suppliers longer payments and assurances unavailable to existing suppliers,” FERC reasoned, would improperly favor new generation over existing generation, throwing the auction‘s market-based price-setting mechanism out of balance. Ibid. See also PJM, 128 FERC ¶61,789 (2009) (order on petition for rehearing) (“Both new entry and retention of existing efficient capacity are necessary to ensure reliability and both should receive the same price so that the price signals are not skewed in favor of new
Shortly after FERC rejected Maryland‘s NEPA proposal, the Maryland Public Service Commission promulgated the Generation Order at issue here. Under the order, Maryland solicited proposals from various companies for construction of a new gas-fired power plant at a particular location, and accepted the proposal of petitioner CPV Maryland, LLC (CPV). Maryland then required LSEs to enter into a 20-year pricing contract (the parties refer to this contract as a “contract for differences“) with CPV at a rate CPV specified in its accepted proposal.4 Unlike a traditional bilateral contract for capacity, the contract for differences does not transfer ownership of capacity from CPV to the LSEs. Instead, CPV sells its capacity on the PJM market, but Maryland‘s program guarantees CPV the contract price rather than the auction clearing price.
If CPV‘s capacity clears the PJM capacity auction and the clearing price falls below the price guaranteed in the contract for differences, Maryland LSEs pay CPV the difference between the contract price and the clearing price. The LSEs then pass the costs of these required payments along to Maryland consumers in the form of higher retail prices. If CPV‘s capacity clears the auction and the clearing price exceeds the price guaranteed in the contract for differences, CPV pays the LSEs the difference between the contract price and the clearing price, and the LSEs then pass the savings along to consumers in the form of lower retail prices. Because CPV sells its capacity exclusively in the PJM auction market, CPV receives no payment from Maryland LSEs or PJM if its capacity fails to clear the auction. But CPV is guaranteed a certain rate if its capacity does clear, so the contract‘s terms encourage
Prior to enactment of the Maryland program, PJM had exempted new state-supported generation from the MOPR, allowing such generation to bid capacity into the
In addition to seeking the elimination of the state-supported generation exemption, incumbent generators—respondents here—brought suit in the District of Maryland against members of the Maryland Public Service Commission in their official capacities. The incumbent generators sought a declaratory judgment that Maryland‘s program violates the Supremacy Clause by setting a wholesale rate for electricity and by interfering with FERC‘s capacity-auction policies.6 CPV intervened as a
The Fourth Circuit affirmed. Relying on this Court‘s decision in Mississippi Power & Light Co. v. Mississippi ex rel. Moore, 487 U. S. 354, 370 (1988), the Fourth Circuit observed that state laws are preempted when they “den[y] full effect to the rates set by FERC, even though [they do] not seek to tamper with the actual terms of an interstate transaction.” PPL EnergyPlus, LLC v. Nazarian, 753 F. 3d 467, 476 (2014). Maryland‘s program, the Fourth Circuit reasoned, “functionally sets the rate that CPV receives for its sales in the PJM auction,” “a FERC-approved market mechanism.” Id., at 476-477. “[B]y adopting terms and prices set by Maryland, not those sanctioned by FERC,” the Fourth Circuit concluded, Maryland‘s program “strikes at the heart of the agency‘s statutory power.” Id., at 478.8 The Fourth Circuit cautioned that it “need not express an opinion on other state efforts to encourage new generation, such as direct subsidies or
The Fourth Circuit then held that Maryland‘s program impermissibly conflicts with FERC policies. Maryland‘s program, the Fourth Circuit determined, “has the potential to seriously distort the PJM auction‘s price signals,” undermining the incentive structure FERC has approved for construction of new generation. Ibid. Moreover, the Fourth Circuit explained, Maryland‘s program “conflicts with NEPA” by providing a 20-year price guarantee to a new entrant—even though FERC refused Maryland‘s request to extend the duration of the NEPA past three years. Id., at 479.
We granted certiorari, 577 U.S. ___ (2015), and now affirm.
II
The Supremacy Clause makes the laws of the United States “the supreme Law of the Land; . . . any Thing in the Constitution or Laws of any State to the Contrary notwithstanding.”
We agree with the Fourth Circuit‘s judgment that Maryland‘s program sets an interstate wholesale rate, contravening the FPA‘s division of authority between state and federal regulators. As earlier recounted, see supra, at 2, the FPA allocates to FERC exclusive jurisdiction over “rates and charges . . . received . . . for or in connection with” interstate wholesale sales.
That Maryland was attempting to encourage construction of new in-state generation does not save its program. States, of course, may regulate within the domain Congress assigned to them even when their laws incidentally
The problem we have identified with Maryland‘s program mirrors the problems we identified in Mississippi Power & Light and Nantahala Power & Light Co. v. Thornburg, 476 U. S. 953 (1986). In each of those cases, a State determined that FERC had failed to ensure the reasonableness of a wholesale rate, and the State therefore prevented a utility from recovering—through retail rates—the full cost of wholesale purchases. See Mississippi Power & Light, 487 U. S., at 360-364; Nantahala,
The contract for differences, Maryland and CPV respond, is indistinguishable from traditional bilateral contracts for capacity, which FERC has long accommodated in the auction. See supra, at 4-5, and n. 3. But the contract at issue here differs from traditional bilateral contracts in this significant respect: The contract for differences does not transfer ownership of capacity from one party to another outside the auction. Instead, the contract for differences operates within the auction; it mandates that LSEs and CPV exchange money based on the cost of CPV‘s capacity sales to PJM. Notably, because the contract for differences does not contemplate the sale of capacity outside the auction, Maryland and CPV took the position, until the Fourth Circuit issued its decision, that the rate in the contract for differences is not subject to FERC‘s reasonableness review. See
Our holding is limited: We reject Maryland‘s program only because it disregards an interstate wholesale rate required by FERC. We therefore need not and do not address the permissibility of various other measures States might employ to encourage development of new or clean generation, including tax incentives, land grants, direct subsidies, construction of state-owned generation facilities, or re-regulation of the energy sector. Nothing in this opinion should be read to foreclose Maryland and other States from encouraging production of new or clean generation through measures “untethered to a generator‘s wholesale market participation.” Brief for Respondents 40. So long as a State does not condition payment of funds on capacity clearing the auction, the State‘s program would not suffer from the fatal defect that renders Maryland‘s program unacceptable.13
*
For the reasons stated, the judgment of the Court of Appeals for the Fourth Circuit is
Affirmed.
SOTOMAYOR, J., concurring
SUPREME COURT OF THE UNITED STATES
Nos. 14-614 and 14-623
W. KEVIN HUGHES, CHAIRMAN, MARYLAND PUBLIC SERVICE COMMISSION, ET AL., PETITIONERS
14-614 v. TALEN ENERGY MARKETING, LLC, FKA PPL ENERGYPLUS, LLC, ET AL.
CPV MARYLAND, LLC, PETITIONER
14-623 v. TALEN ENERGY MARKETING, LLC, FKA PPL ENERGYPLUS, LLC, ET AL.
ON WRITS OF CERTIORARI TO THE UNITED STATES COURT OF APPEALS FOR THE FOURTH CIRCUIT
[April 19, 2016]
JUSTICE SOTOMAYOR, concurring.
I write separately to clarify my understanding of the pre-emption principles that should guide this Court‘s analysis of the Federal Power Act and that underpin its conclusion in these cases.
The process through which consumers obtain energy stretches across state and federal regulatory domains. The Federal Power Act authorizes the States to regulate energy production.
In this context, therefore, our general exhortation not to rely on a talismanic pre-emption vocabulary applies with special force. See Hines v. Davidowitz, 312 U. S. 52, 67 (1941) (“This Court . . . has made use of the following expressions: conflicting; contrary to; occupying the field; repugnance; difference; irreconcilability; inconsistency; violation; curtailment; and interference. But none of these expressions provides an infallible constitutional test or an exclusive constitutional yardstick” (footnote omitted)).
I understand today‘s opinion to reflect these principles. Using the purpose of the Federal Power Act as the “ultimate touchstone” of its pre-emption inquiry, Altria Group, Inc. v. Good, 555 U. S. 70, 76 (2008), rather than resting on generic pre-emption frameworks unrelated to the Federal Power Act, the Court holds that Maryland has impermissibly impeded the performance of one of FERC‘s core regulatory duties. Ensuring “just and reasonable” wholesale rates is a central purpose of the Act. See
Endorsing those conclusions, I join the Court‘s opinion in full.
Opinion of THOMAS, J.
SUPREME COURT OF THE UNITED STATES
Nos. 14-614 and 14-623
W. KEVIN HUGHES, CHAIRMAN, MARYLAND PUBLIC SERVICE COMMISSION, ET AL., PETITIONERS
14-614 v. TALEN ENERGY MARKETING, LLC, FKA PPL ENERGYPLUS, LLC, ET AL.
CPV MARYLAND, LLC, PETITIONER
14-623 v. TALEN ENERGY MARKETING, LLC, FKA PPL ENERGYPLUS, LLC, ET AL.
ON WRITS OF CERTIORARI TO THE UNITED STATES COURT OF APPEALS FOR THE FOURTH CIRCUIT
[April 19, 2016]
JUSTICE THOMAS, concurring in part and concurring in the judgment.
The Court concludes that Maryland‘s regulatory program invades the Federal Energy Regulatory Commission‘s (FERC) exclusive jurisdiction over interstate wholesale sales of electric energy. Ante, at 12. I agree that the statutory text and framework compel that conclusion, and that Maryland‘s program therefore cannot stand. Because the statute provides a sufficient basis for resolving these cases, I would not also rest today‘s holding on principles of implied pre-emption. See, e.g., ante, at 11-12. For that reason, I join the Court‘s opinion only to the extent that it rests on the text and structure of the Federal Power Act (FPA), 41 Stat. 1063, as amended,
The FPA divides federal and state jurisdiction over the regulation of electricity sales. As relevant here, the FPA
To resolve these cases, it is enough to conclude that Maryland‘s program invades FERC‘s exclusive jurisdiction. Maryland has partially displaced the FERC-endorsed market mechanism for determining wholesale capacity rates. Under Maryland‘s program, CPV Maryland, LLC, is entitled to receive, for its wholesale sales into the capacity auction, something other than what FERC has decided that generators should receive. That is a regulation of wholesale sales: By “fiddling with the effective . . . price” that CPV receives for its wholesale sales, Maryland has “regulate[d]” wholesale sales “no less than does direct ratesetting.” FERC v. Electric Power Supply Assn., 577 U. S. ___, ___ (2016) (Scalia, J., dissenting) (slip op., at 6) (emphasis deleted) (addressing analogous situation involving retail sales). Maryland‘s program therefore intrudes on the exclusive federal jurisdiction over wholesale electricity rates.
Although the Court applies the FPA‘s framework in reaching that conclusion, see ante, at 12, it also relies on principles of implied pre-emption, see, e.g., ante, at 11-12. Because we can resolve these cases based on the statute alone, I would affirm based solely on the FPA. Accordingly, I concur in the judgment and I join the Court‘s opinion to the extent that it holds that Maryland‘s program invades FERC‘s exclusive jurisdiction.
Notes
Now assume instead that the clearing price in a given year is $40/unit, which exceeds the $30/unit contract price, and that CPV‘s capacity clears the auction. CPV receives payments from PJM of $40/unit, or $400,000. CPV then must pay Maryland LSEs the difference between the contract price and the clearing price—in this case, $10/unit, or $100,000. The rate CPV receives from the capacity auction is therefore the contract price—$30/unit—the same price CPV received in the above example. Maryland LSEs then must purchase from PJM, at the clearing price of $40/unit, enough capacity to satisfy their share of anticipated demand. Assume that PJM again requires Maryland LSEs to purchase 40,000 units of capacity. Total capacity-auction expenses for Maryland LSEs would therefore include the full cost of capacity purchases from PJM ($1,600,000), minus the payment from CPV ($100,000), or $1,500,000. Absent Maryland‘s program, the LSEs would have had to pay $1,600,000 to PJM without receiving any offsetting payments from CPV.