90 P. 1056 | Cal. | 1907
These are actions for the foreclosure of mechanics' liens, which were consolidated for the purposes of trial. George F. Howe was the original contractor, and brought his action against defendant Hulda Schmidt, the owner of the property, to foreclose his lien for an alleged balance due upon a contract entered into by him and said Schmidt for the erection of a building upon her land. In this action defendant Wright, a subcontractor, and defendants Dodd, H. Raphael Co., California Hardware Co., and the Montgomery Mullin Lumber Company, materialmen, set up their claims and sought foreclosure of their liens, while in the second action the three last-named defendants sought the same relief as plaintiffs. The trial court adjudged all of the liens to be void, and gave judgment for the owner and against all the claimants, including the original contractor. This is an appeal from an order denying a motion for a new trial made by the defendants Wright, Dodd, H. Raphael Co., California Hardware Co., and the Montgomery Mullin Lumber Co.
The principal question presented by appellants is as to the validity of the contract between Howe and Mrs. Schmidt, *438
which the trial court admitted in evidence over the objection of appellants. By the terms of the contract, Howe was to construct the building "conformable to the drawings and specifications made by Edward Kendall and signed by the parties and hereunto annexed." The contract, produced from the recorder's office and offered and received in evidence, consisted of three items or parts fastened together in the following order: 1. The formal contract, signed on the last page thereof by both contractor and owner; 2. The specifications, signed only by the owner; and 3. The drawings or plans, the last or bottom sheet of which was signed by the contractor and owner. There was nothing to indicate that the contract, when offered in evidence, was not in the same condition as at the time of its execution. The contention is that the reference in the contract being to drawings and specifications "signed by the parties" as well as annexed, the failure of one of the parties to place his signature somewhere upon the specifications made it impossible to identify the specifications intended except by the aid of oral evidence, and rendered the contract void. We see no good reason, however, for holding that this reference to the "drawings and specifications . . . signed by the parties and hereunto annexed" is not fully satisfied by pages of specifications and sheets of drawings fastened together and annexed to the contract, and signed on the last page thereof by the parties. So fastened together and annexed to the contract, the drawings and specifications in fact constituted one document, fully identified as to the signatures of the parties in the manner required by the contract by the signatures on the last page. This being the situation, it is unnecessary to determine what would have been the effect had the drawings and specifications been simply "annexed," without any compliance with the requirement as to signing, and the cases cited by appellants in support of their claim are inapplicable.Worden v. Hammond,
There was an attempt made on the trial to show that the drawings and specifications had not been annexed to the contract at the time of the execution thereof, but the evidence upon this point was conflicting, and the trial court found in effect, as we read the findings, that at the time the signatures were affixed to the agreement and the last page of the plans or drawings, the various papers had been attached together, and were then in the same condition as when produced at the trial. This portion of the finding is not attacked.
The trial court, in the same connection, found that the specifications proper "were not signed by the said Howe by an oversight on his part." Complaint is made that the evidence is insufficient to justify this particular finding. If we concede this finding to be at all material, we are satisfied that it finds sufficient support in the evidence. *440
No good reason is urged by counsel for holding the contract void. It must be held that the trial court did not err in admitting it in evidence, or in finding it to be a valid contract between the owner and the contractor, fully measuring up to the requirements of the Mechanics' Lien Law.
So far as appellants H.R. Dodd and the California Hardware Co. are concerned, no other point is made in the brief that is available on motion for new trial. No finding of fact affecting the claim of either is attacked, and no error in law occurring at the trial which could have operated to their prejudice, other than the ruling admitting the contract in evidence, is suggested. Nor is there any intimation of any respect in which the decision is "against law." There being no appeal from the judgment, we cannot here consider any question as to the sufficiency of the findings to support the judgment against these defendants.
The case of the appellants Montgomery Mullin Lumber Co. and the H. Raphael Co. is in the same condition as that of appellants Dodd and the California Hardware Co., except in one respect. As to the Montgomery Mullin Lumber Company, there is a finding to the effect that the claimant, in furnishing some of the lumber to the contractor for the construction of the building, furnished No. 2 lumber instead of No. 1 lumber, knowing that No. 1 lumber was required by the terms of the building contract between Howe and Schmidt, and as to the H. Raphael Co., there was a finding that the claimant knew that certain doors furnished by it to the contractor were not in compliance with the terms of the said building contract as to size. These findings are attacked as being unsupported by the evidence. There was no evidence that either of these claimants had any actual knowledge in this behalf, their only knowledge as to the requirements of the contract being such constructive knowledge as the contract filed for record imputed to them, and we take the findings as meaning no more than that the claimant knew that the materials did not comply with the requirements of the filed contract in the respects stated. There is no intimation in these findings that either of the claimants did not fully comply with the direction of the contractor as to size and quality of the materials furnished. These findings are clearly as to matters that were not embraced within the issues made by the pleadings, *441
and, so far as the record shows, there was no evidence introduced by any party on the trial in regard thereto. On an appeal from the judgment, they, therefore, could not be considered in support of the judgment. (Rudel v. County of Los Angeles,
As to the appellant Wright, who was the subcontractor for the plumbing, gasfitting, and sewering, and who, according to the allegations of his own pleading, had agreed to do the same according to the plans and specifications contained in the contract between Mrs. Schmidt and Howe, the findings of fact attacked by the brief are findings XII, XVII, and a portion of VIII. Finding XII, which does not appear to be within the issues made by the pleadings, was that said Wright, as subcontractor for the plumbing work, "knew at the time he constructed the same that he was not complying with the contract between said parties, or supplying said vents and brackets. Finding XVII was not assailed in the statement on motion for new trial by specification of insufficiency. The same is true as to the portion of finding VIII complained of, which is that "the plumbing provided in said contract was improperly done, as follows, — no vents were placed either in the closets or the kitchen, and the N.P. brackets for the wash basins were omitted altogether." It is manifest that finding XII, the only one of these findings assailed by specification of insufficiency, was entirely immaterial, and could not affect the rights of the claimant. That the plumbing contract was not complied with by him must be taken as conclusively established here by the unassailed portion of finding VIII already set forth. Whatever effect this failure to comply should legally have had on his claim of lien, a matter we are precluded from considering on this appeal, that effect could not be changed in the slightest degree by the further finding that he knew he was not complying with his contract. As in the case of the other claimants, if the judgment given upon these findings was erroneous, the *443 error is one that cannot be reviewed on motion for new trial.
The order denying a new trial must be affirmed, and it is so ordered.
Shaw, J., and Sloss, J., concurred.