16 F.2d 893 | 5th Cir. | 1927
Plaintiff in error, a Texas municipal corporation, hereafter referred to as plaintiff, brought suit in the district court of Hidalgo county, Tex., against the Western Metal Manufacturing Company, hereafter referred to as the Metal Company, an Arizona corporation, and H. L. Draper, a citizen of Texas.
Briefly stated, the petition alleged that plaintiff was operating an irrigating system in Hidalgo county, Tex., and in October, 1923,
Asserting that the suit was wholly against . it, and showed no cause of action against its agent, the Metal Company secured the removal of the suit to the District Court of the United States for the Southern District of Texas. Draper did not attempt to remove the suit' as to him, but filed an answer, denying the allegation^ of the petition as to false representations, and denying that the petition disclosed a cause of action as against him. Thereafter'the Metal Company filed.an answer in the, .United ’ States District Court admitting the sale of the material, denying it had agreed’ to furnish a superintendent to ‘supervisé the construction of the siphon, and setting up a ’written, contract for the sale of the material in the following words and figures : • ■
Western Metal Manufacturing Company. Date 10 — 8—1923. Salesman's Order No. 130. Sold to Hidalgo Co. Water Imp, Dist. No. 4, address Edinburg. Ship‘tó same station, McAllen; county, Hidalgo. Routing — St. L». B. & M. Freight charges, collect. Mail B/!/, to y?. L. Rockwell; address, Edinburg. Article '' Each Total Total Price Amount. 908' 78" No. 12 Ga. Armeo pipe C R & S18' Sections
$12,630 28
50 78" Band couplers 11.90 595 00
1 Armeo 78" to 108" x 10' long 300 00
$13,525 28
Order-No.'1908.
Seller hot responsible for delays arising from causes beyond , its Reasonable control, Title to all property’ shalPfemain in seller until purchase price'is paid in full and right of possession shall be in seller at all, times during default in payment. Unless otherwise specified prices are f. o. b. cars at Houston, Texas. W. L. Rockwell, Purchaser. Entered as order 'No. 1908.
H. D. Draper, . Salesman.
This answer also set up that at the request of the-plaintiff this defendant had furnished a man at its own expense for three days to advise with and instruct the workmen of the plaintiff as to how to join, the pipes together with the band couplers; hut, as the plaintiff had not’ completed the construction of a trench and foundation upon ’ which to rest the pipes when completed, the man sent by the Metal Company left to await the completion of the foundation and trench; that in the meantime an overflow occurred, . which washed away much of the material on - the grounds, and indented some of the pipes, and undid those which ,had already been coupled and joined; that the siphon had been constructed upon a quicksand base, and that, when the water was pumped through the .same, the foundation began to give way, which caused the siphon to become uneven and the various connections of the pipe to ■ break.
Plaintiff moved to remand the ease to the state court and this was denied. The ease was then tried to a jury, and in the course of the trial the District Judge took away from the jury any consideration of the question as to whether the Metal Company had agreed to furnish a superintendent for the installation of the siphon.
Plaintiff excepted to. the portion of the charge dealing with this question, which is as follows:
“In addition to the matter of the representation as .to the fitness of the pipe, the plaintiff has alleged, and has undertaken to prove, that the’‘defendant: agreed to superintend and direct the construction of the pipe line. ‘ . ’ ' ’
“I charge yOfi, in view of the written memorandum, that such evidence is a variance from that memorandum, and that there is no proper legal basis in this cáse for the plaintiff to claim that they had any agreement with the defendant to construct and lay that pipe line, and that you will not consider whether or not such an agreement was made, because such an agreement would contradict the very face of the memorandum of agreement, which recited that for a certain consideration they would sell so much pipe, and would he in effect imparting into their agreement an agreement for construction which the evidence does not justify.” ■'
Error is assigned to the refusal to remand •the' case to the state court.and to the giving of the portion of the charge above set out.
It may be conceded that when an agent is’ guilty of malfeasance or misfeasance, or makes' false or fraudulent representations of an existing fact in order to induce the making of a Contract, he may -be held liable together with his principal for damages caused by hia
This, if true, was clearly a promise by an agent for a known principal, and if there was any breach of contract in this regard it certainly gave no cause of aetion against the agent. The District Court was right in refusing to remand the case to the state court. Wecker v. Nat. Enam. Co., 204 U. S. 176, 27 S. Ct. 184, 51 L. Ed. 430, 9 Ann. Cas. 757.
The evidence does not appear in the record, and we are not advised what it tends to show as to the promises made by the Metal Company through its agent to furnish a superintendent. The allegations of the petition in this respeet were denied by the answer, and the Metal Company relied upon the written contract. That contract is silent as to any promises to superintend the installation of the material, and is complete in itself. It is clear from the petition that the promises plaintiff alleges it relied upon were made by the agent prior to the enterng into of the written contract. In such ease, parol evidence that would tend to alter or vary the contract was not admissible, and it was not error to charge the jury as above shown. Inner Shoe Tire Co. v. Treadway (C. C. A.) 286 F. 838; Kaplan v. Am. Cotton Oil Co. (C. C. A.) 12 F.(2d) 969; Du Bois v. Rooney, 82 Tex. 173, 17 S. W. 528; Fish Bros. Wagon Co. v. Adams (Tex. Civ. App.) 146 S. W. 704.
We find no error in the record.
Affirmed.