Lead Opinion
The William E. Trigg Company, a manufacturing corporation organized under the laws of this State, and engaged in the construction, building and equipment of ships, boats and vessels, on June 1, 1901, executed a deed of trust to the Commercial Trust Company of Philadelphia, as trustee, covering its plant and including all its machinery, fixtures and tools, together with all corporate rights, privileges and franchises, and on June 11, 1902, another deed of trust to the Eichmond Trust and Safe Deposit Company to secure large issues of its bonds. It contracted also large debts to its employees and for supplies and material; and, having become greatly embarrassed, S. H. Hawes & Co., in December, 1902, filed their bill, setting forth its default in the payment of interest upon the bonds secured by the deeds of trust, averring its heavy indebtedness to banks and individuals upon promissory notes and open accounts, its total insolvency, and praying for the appointment of a receiver to take charge of its assets and to finish certain uncompleted contracts theretofore entered into by it.
Under this bill such proceedings were had that a receiver was appointed, and the cause was referred to a commissioner to state an account showing the property of the company and its value, the debts due by it, the liens and their priorities. Bank v. Trigg Co., 106 Va. 327, 56 S. E. 158.
The question now to be disposed of grows out of the following iacts: The Trigg Company, appellee, on the 20th of April, 1900, contracted with the United States government for the construction of revenue cutters Uos. 7 and 8, known as the Tus•carora and the Mohawk. Certain payments were to be made as the work progressed, but not less than twenty-five per cent, of the contract price was to be reserved by the government until the completion and final acceptance of the vessels. The payments so reserved are known in the record as the “Eeserved
The Trigg Company applied to the First National Bank of Richmond, Va., for loans to enable it to execute this contract, and received $25,000 on April 26, 1900, filing its contract with the bank, but making at that time no written assignment. On May 11, 1900, the board of directors of the company passed a resolution authorizing the execution of a power of attorney to the bank to collect all payments under its contracts with the government for the construction of the revenue cutters. This power of attorney was duly executed on that day, and was sent by mail to the secretary of the treasury on May 12, 1900.
Other loans from the bank were negotiated by the Trigg Company upon the faith of the contracts with the United States government for the construction of the two cutters; so that the debt due to the bank was in the end represented by three notes, one of April 29, 1900, for $5,070, subject to a credit of $3,034 as of the 30th day of September, 1902; a note of October 16, 1900, for $25,000, and a second note of October 16, 1900, for a like amount.
The Tuscarora was completed, accepted and paid for by the government, and makes no figure in this case. The Mohawk was completed after the appointment of the receiver; and on May 16, 1904, the sum of $26,705.35 was paid by the government into court to the credit of this cause in full settlement of the amount due to the Trigg Company for the construction of that vessel.
In obedience to the decree of the chancery court the commissioner returned his report, from which it appears that many liens for supplies, material and labor were perfected and filed against the Mohawk. None of them are of an earlier date than December, 1902, while the First National Bank of Richmond claims under assignments none of which are later than October, 1900.
“First. Because said commissioner finds that the assignment by said W. R. Trigg Company to said bank of its, the said Trigg Company’s, claim against the United States, arising out of its contract to build for said United States the revenue cutter “Mohawk,” and the power of attorney to said bank to collect the reserve held to await the completion of said cutter, are void under section 3477, Revised Statutes of the United States; and even if not so void, the general claim of said bank, as well as said assignment and power of attorney are subordinate to all liens duly acquired for labor and supplies furnished the said W. R. Trigg Company under the terms of the Virginia statute, Code of Virginia, section 2485.
“Second. Because the findings of said commissioner sustain the constitutionality of the labor and supply lien law of Virginia, whereas said law is in conflict with section 1 of Article Fourteen of the Constitution of the United States, and with the Constitution of Virginia.
“Third. Because said commissioner finds that the said W. R. Trigg Company is a ‘manufacturing company’ within the meaning and operation of said Virginia labor and supply lien statute, whereas he should have found that said statute did not apply to such a company.”
The second and third exceptions are disposed of by the opinion of this court in Bank v. Trigg Co., supra, where the constitutionality of section 2485 was maintained; the Trigg Company was held to be a manufacturing company, within the meaning of that section; and the liens for labor and supplies were sustained; but the decree appealed from, in that case, reserved for future consideration “all questions as to the validity or priority of any claim or lien of any party to the cause, so far as such claim or lien exists in relation to any property of the defendant corporation other than the real estate conveyed in said two mortgages and the rights appurtenant thereto, and the
The precise question, therefore, now to be decided is as to ■the priority of right between the First National Bank, claiming under the assignments above referred to, and the subsequent liens for labor and supplies.
As we have observed, the validity of the liens was established in Bank v. Trigg Co., supra, and must prevail, unless the bank, ■claiming under the assignments, shall he found to have the ■older and the better right.
We are of opinion that the transaction between the bank and the Trigg Company by which the contracts with the United ■States government were filed with the hank and a power of attorney was executed by the Trigg Company, authorizing the bank to collect all payments under its contracts with the government for the construction of the revenue cutters, on the faith •of which the bank made loans to the Trigg Company, constituted, under the laws of this State, valid assignments or hypothecations of those contracts. Didier v. Patterson, 93 Va. 534, 25 S. E. 661; Building Association v. Coleman, 94 Va. 433, 26 S. E. 843; Hicks v. Roanoke Brick Co., 94 Va. 741, 27 S. E. 596; Switzer v. Noffsinger, 82 Va. 518; Mack Mfg. Co. v. Smoot, 102 Va. 724, 47 S. E. 859.
“Words which show an intention of transferring or appropriating a chose in action to or for the use of another, if based upon a valuable consideration, will, in contemplation óf a court •of equity, operate as an assignment.” Tatum v. Ballard, 94 Va. 370, 26 S. E. 871.
We think it plain, therefore, that the dealing between the “bank and the Trigg Company constituted an assignment, valid under Virginia law, and if the right of the bank is to he de
“All transfers and assignments made of any claim upon the-United States, or of any part or share thereof, or interest therein, whether absolute or conditional, and whatever may be the consideration therefor, and all powers of attorney, orders,, or other authorities for receiving payment of any such claim, or of any part or share thereof, shall be absolutely null and void,, unless they are freely made and executed in the presence of at least two attesting witnesses after the allowance of such a claim, the ascertainment of the amount due, and the issuing of a warrant for the payment thereof. Such transfer, assignments, and powers of attorney, must recite the warrant for payment, and must be acknowledged by the person making them, before an officer having authority to take acknowledgments of deeds, and shall be certified by the officer; and it must appear by the certificate that the officer, at the time of the-acknowledgment, read and fully explain the transfer, assignment, or warrant of attorney to the person acknowledging the same.”
After consideration of this statute and numerous decisions of the Supreme Court of the United States, which he discusses in his very instructive report, the commissioner in chancery was of opinion that the assignment to the bank was void, and his findings was sustained by the decree of the chancery court.
It is admitted that the assignment relied upon by the bank is not in accordance with the terms of section 3477. The contention of the bank is, that the act was passed, as its preamble-states, to prevent frauds upon the treasury of the United States, and that by a proper construction it avoids all transfers and' assignments of claims upon the United States at the option and election of the government of the United States; but that, in this case, the government having seen fit to deposit the amount due upon its contract with the receiver of the court, and having received 'a full acquittance of all claims and demands growing
The language of that section, if construed literally, would annul all transfers and assignments; but the supreme court has held in numerous cases that such was not its effect. It does not apply to transfers of title by operation of law, as, for example, the passing of claims to heirs, devisees or assignees in bankruptcy (Erwin v. U. S., 97 U. S. 392, 24 L. Ed. 1065), but only to voluntary assignments of demands against the government; nor does it include a voluntary assignment made by an insolvent of all his effects for the benefit of his creditors (Goodman v. Niblack, 102 U. S. 556, 27 L. Ed. 229) ; and in the latter case the court said, that a careful examination of the entire statute leaves no doubt that its sole purpose was to protect the government and not the parties to the assignment.
In Bailey v. United States, 109 U. S. 432, 27 L. Ed. 988, 3 Sup. Ct. 272, Mr. Justice Harlan said, that the statute in question is not to be interpreted according to the literal acceptation of the words used; and further on in the opinion says, that “A mere power of attorney given before the warrant is issued—so long at least as it is unexecuted—may undoubtedly be treated by the claimant as absolutely null and void in any contest between him and his-attorney in fact. And it may be so regarded by the officers of the government whose duty it is to adjust the claim and issue a warrant for its account. But if those officers choose to make payment to the person whom the claimant, by formal power of attorney, has accredited to them
In Price v. Forrest, 173 U. S. 410, 43 L. Ed. 749, 19 Sup. Ct. 434, the facts were as follows: Price, a fiscal agent of the United States, advanced $75,000 to his successor for public uses. This money not being returned, Price asserted claim against the government. In 1857 Eorrest got judgment against Price, and in 1874 Forrest’s widow brought suit to enforce this judgment. In 1891 Congress passed an act for the relief of Price, and in 1892 $76,204.08 was awarded him. A portion of this money was actually paid, and Forrest’s widow then obtained a decree requiring Price to deliver government drafts for the balance to a receiver. In consequence of this suit, the government officials held back enough to satisfy the judgment of Forrest against Price pending the litigation in the State courts. The State court held that it had jurisdiction under the laws of the State, and as between the parties before it', to put into the hands of its receiver any chose in action of whatever nature belonging to Price and of which he had possession or control. Upon these facts, Mr. Justice Harlan, delivering the opinion, said: “While the present case differs from any former case in its facts, we think that the principle announced in Erwin v. United States, and Goodman v. Niblack justified the conclusion reached by the State court. That court held that it had jurisdiction under the laws of the State, and as between the parties before it, to put into the hands of its receiver any chose in action of whatever nature belonging to Price and of which he had possession or control. The receiver did not obtain from Price in his lifetime an assignment of his claim against the United States. But having full jurisdiction over him the court adjudged that as between Price and the plaintiffs who sued him, the claim should not be disposed of by him to the injury of his creditors, but should be placed in the hands of •the receiver subject to such disposition as the court might de
“As this court has said, the object of Congress by 3477 was to protect the government, and not the claimant, and to prevent frauds upon the treasury. There was no purpose to aid those-who had claims for money against the United States in disregarding the just demands of their creditors. We perceive nothing in the words or object of the statute that prevents any court of competent jurisdiction as to subject matter and parties from making such orders as may be necessary or appropriate-to prevent one who has a claim for money against the government from withdrawing the proceeds of such claim from the-reach of his creditors; provided, such orders do not interfere-with the examination and allowance or rejection of such claim by the proper officers of the government, nor in any wise obstruct any action such officers may legally take under the statutes relating to the payment of claims against the United' States.
“It only remains to say touching this part of the case, that if section 3477 does not embrace the passing or transfer of claims to heirs, devisees, or assignees in bankruptcy, as held in Erwin v. United States, nor a voluntary assignment by a debtor of his effects for the benefit of his creditors, as held in Goodman v. Niblack, it is difficult to see how an order of a ju
It will be observed that in Price v. Forrest the fund came under the control of the State court by force of its decree appointing a receiver and requiring the debtor, Price, to whom the claim from the United States Government was due, to make an assignment to the receiver; and yet that was held not to be within the mischief sought to be remedied by section 3477, that such an order would not interfere with the examination and allowance or rejection of such claim by the proper officers of the government, or in any wise obstruct any action such officers might legally take under the statutes relating to the payment of claims against the United States; a fortiori is the case not within the mischief sought to be remedied by section 3477 when the government, of its own accord, comes forward and by its voluntary act places within the custody of the State court the fund in controversy, receives a full acquittance of its obligations under the contract, and leaves the fund to be disposed of in accordance with the rights of the parties as ascertained by the courts of the State.
The case of York v. Conde, 147 N. Y. 486, 42 N. E. 193, is strikingly analogous in many of its features to the case under consideration. Wither by & Gaffney were contractors with the United States for building barracks at Saekett’s Harbor. York & Starkweather furnished to the contractors lumber and material to the amount of $3,000, to be used in the construction. During the progress of the work and before its completion in March, 1890, Witherby & Gaffney made a written assignment to York & Starkweather of $3,000 of the money due and to become due to them from the government to be applied on their indebtedness to the assignees for materials so furnished, and authorized the disbursing agent of the government, through
“In our opinion, a just construction of the statute does not invalidate the transfer of Witherby & Gaffney to the plaintiffs, nor will the objects of the statute be defeated by the construction that such a transfer, made in the legitimate and usual course of business, in good faith, to secure an honest debt, while it may be disregarded by the government, is good as between the parties so far as to enable the transferee, after the government has paid over the money to the claimant, to enforce as against him or those who take with notice, the interest or lien given by the assignment. The fact that the government may refuse to recognize any transfer or assignment, in connection with the general principle of law which avoids all agreements contrary to public policy, will be a sufficient discouragement to illegitimate transactions, or, at all events, it is all the law can justly interpose, having due regard to the exigencies of business and the protection of innocent parties. The Supreme Court of Massachusetts, in Jernegan v. Osborn (155 Mass. 207, 29 N. E.
The Case of York v. Conde was carried to the Supreme Court of the United States, and the appeal was subsequently dismissed as not presenting a Federal question, (168 U. S. 642, 42 L. Ed. 611, 18 Sup. Ct. 234). The Chief Justice, referring to the opinion of the State court, said: “Many decisions of this court in respect of section 3477 were then considered, and the conclusion reached that the section had been so construed as to permit transfers made in the legitimate course of business, in good faith, to secure an honest debt, while they might be disregarded by the government, .to be sustained as between the parties so far as to enable the transferees, after the government had paid over the money to its contractors, to enforce them against the latter, or those taking with notice. The court held, in effect, that such was the transaction in the case at bar, and that the transfer to York & Starkweather was simply to secure them for material actually uséd by the contractors in performing their contract with the government, and amounted to nothing more than the giving of security, and not to the assignment of a claim to be enforced against the government. The United States had, in due course, paid over the money to the contractors, and between them there was no dispute; nor had the United States any concern in the question as to which of the rival claimants was entitled to the fund, the proper distribution of which depended on the equities between them.”
We are of opinion that the assignment under consideration was valid between the parties and is not avoided by section 3477 of the Revised Statutes of the United States.
That assignment being valid, we are of opinion that the rights of the bank under it, which accrued not later than October, 1900, are superior to the liens for labor and supplies, none of which were obtained before December, 1902.
This branch of the case is, we think, covered by the decision of this court in Millhiser, &c., Co. v. Gallego Mills Co., 101 Va.
A contrary rule would drive out of business every enterprise which was not backed by sufficient capital to meet all the demands of its current expenses as they accrued. It would make it-impossible for men having a small capital successfully to engage in and conduct their business. It is essential to the existence of every mercantile, manufacturing or business enterprise to borrow money from time to time, and to do so they must be able to hypothecate as security such resources as may be under their control; and to enable them to negotiate loans to the best advantage, or to do so at all, the law must protect
The money received by the Trigg Company from the bank was necessary to the conduct of its business, and when received was paid out for material, supplies and labor with which to prosecute its business; and we are of opinion that from every point of view the claim of the bank is meritorious and ought to prevail; that its exception to the report of the commissioner should have been sustained; and that, in this respect, the decree appealed from is erroneous and should be reversed.
A history of the insolvency proceedings against the William R. Trigg Company, a corporation engaged in the building-and equipment of ships, boats and vessels at Richmond, Va., conducted in the above styled cause and leading up to the adjudications of the Chancery Court of the city of Richmond, from which this appeal is taken, has been fully stated in the cases of Trigg Co. v. Bucyrus Co., et als., 104 Va. 79, 51 S. E. 174, and Bank v. Trigg Co., 106 Va. 327, 56 S. E. 158, and need not be here repeated. In this connection, however, it is to be noted that in those cases, as held by the decree now under review, the William R. Trigg Company was held to be a manufacturing corporation, within the meaning of the Virginia labor and supply lien statute in force when the company was chartered and when it became insolvent; and that said statute was not void as being contrary to the Constitution of the State of Virginia or to the Constitution of the Hnited States. These questions are, therefore, res adjudicata in this cause.
Following the adjudication of this court in Bank v. Trigg Co., supra, the court below ruled upon certain exceptions taken by parties in interest to the report (No. 4) of Master Commissioner E. C. Massie of the property of the Trigg Company, its value, etc., an account of the debts due by the company, the
Of the twenty-seven assignments of error in the petition for the appeal the last relates to a controversy between the First Rational Bank of Richmond, Va., and the supply lien creditors of the Trigg Company, which controversy has been determined by this court in an opinion by Keith, P., just handed down, and will, therefore, not he further considered in this opinion.
Taking up in logical sequence the remaining questions presented we come first to the controversy between the United States Government and the appellants with respect to the rights of these contestants in the property and funds under the control of the court, growing out of certain contracts under which the Trigg Company undertook to construct, and was engaged in constructing, when its property and affairs were placed in the hands and control of the receiver of the court in this cause, three vessels for the United States Government, viz., a dredge for the War Department, called the “Benyuard,” a revenue cutter for the Treasury Department, called the “Mohawk,” and a cruiser for the Ravy Department, called the “Galveston,” each being constructed under a written contract setting forth the terms and conditions upon which the work was to he done, and indicating the rights of the parties, respectively.
The price to he paid for the dredge “Benyuard” was $275,-375, in ten equal payments, to which was added $2,180 for an electric plant to be installed thereon, the contract stipulating for title to the dredge in the government as its construction progressed, and as payments therefor should from time to time he made; and with respect to the other two vessels (“Mohawk” and “Galveston”) the contract price named for the “Mohawk” was $217,000, and for the “Galveston” $1,027,000, to he paid in twenty equal installments as the work progressed, etc.; the contract in each case stipulating that the government should have a lien on the vessel and upon the materials “on
At the time the receiver was appointed, the government had paid a large amount on account of each of these vessels— for the “Benyuard,” $142,550.00, for the “Mohawk,” $149,-437, and for the “Galveston,” $698,514.45—and there was on hand a considerable amount of material that had been accumulated and set apart to be used in the construction of the vessels. The vessels, as well as this material, were taken possession of by the receiver, as parts of the assets of the Trigg Company, although claimed by the agents of the United States Government as the property of the government, and accordingly a stipulation in regard to each of the vessels and the material assembled for their construction was filed in this cause by the Attorney of the United States for the Eastern District of Virginia, in conformity with the provisions of the statute contained in sections 3753 and 3754 of the Revised Statutes of the United States; whereupon the said vessels were, under decrees of the court, delivered to the agents of the United States Government.
The question decided by the lower court and presented on this appeal is, whether title to these several vessels was in the government or the Trigg Company, and, if in the latter, have its creditors who have sued out and caused to be recorded, in accordance with the labor and supply lien statute of the State, claims for supplies furnished the Trigg Company of date subsequent to the contracts between the United States Government and the Trigg Company above referred to, priority of right to satisfaction over the rights of the government in the said vessels 1
The labor and supply lien statute, section 2485 of the Code of 1887, as amended by the act found in Acts 1891-2, p. 362, so far as concerns the controversy before us, declares: “All persons furnishing supplies to a mining or manufacturing company, necessary to the operation of the same, shall have a prior
At the time that the validity of the supply liens of the creditors of the Trigg Company was determined by a former decree in this cause, which was afterwards sustained by this court in Bank v. Trigg Co., supra, the property of the Trigg Company to which the liens attached had not been ascertained, but was reserved for future determination, and accordingly Master Commissioner E. C. Massie, to whom-the cause had been referred, filed a report, wherein he reported that the several vessels in dispute, except the “Benyuard,” were liable to the claims of the several creditors of the Trigg Company which had been duly filed under the statute; that with respect to the “Benyuard,” if any title passed to the United States Government therein, such title was subject to the said liens, and said liens could be enforced because the United States had not acquired such possession of .the “Benyuard” as protects it from the process of the court; and that with respect to the “Mohawk” and the “Galveston” the supply li'ens were superior to the lien reserved in the contract in favor of the United States.
Upon the hearing of the cause upon Commissioner Massie’s report, and the exceptions thereto, the court sustained the exceptions, so far as they related to the title to the vessels, holding that title thereto was in the government and not in the Trigg Company, and that the supply creditors were entitled to no lien thereon.
The first question presented is whether, under the rules of law applicable to the contract between the Trigg Company and the United States Government, the dredge “Benyuard,” at the
It is apparent upon the face of the record that when this contract was entered into between the Trigg Company and the United States Government, providing for the building and equipment of the dredge “Benyuard,” the Trigg Company was. dependent upon the compensation it was to receive for the dredge as it progressed towards completion, and also upon its credit, in purchasing the needed materials and paying the labor to be employed in its construction and completion.
Its general provisions to be borne in mind are: All materials furnished and the work done by the Trigg Company were to be subject to rigid inspection by an inspector appointed on the part of the government, his decision to be final as to quality and quantity. If the Trigg Company should fail to begin or prosecute the work in accordance -with the specifications (made part of the contract) the contract might be annulled by the government. In that case all payments were to cease, and all money or reserved percentage to be retained until the final completion and acceptance of the dredge, which was to be completed at the cost of the Trigg Company, the government to have the right to recover anything paid for such completion in excess of the original contract price of the Trigg Company, including all extra costs of inspection; and might proceed under section 3709 of the Revised Statutes of the United States to provide for the completion of the dredge by open purchase or contract, unless the time (sixteen months) for such completion should be extended, the Trigg Company, by express provision, to be responsible for and pay all liabilities incurred in the prosecution of the work for labor and material until final acceptance of and payment for the dredge.
It was further provided (section 9) that no prior inspection, payment or act was to be construed as a waiver of the right of the government to reject any defective work or material.
Eeverting to the material specifications to be read in connected with the contract, section 199 declared that: “The purpose and spirit of these specifications are that the contractor (The Trigg Co.) is to provide and deliver a standard dredge hull and first class machinery, complete in every respect”; and section 206 provided for the full responsibility on the part of the contractor for the safety of its employees, plant and materials, and “for any damage or injury done by or to them from any source or cause.” Section 209 provided for sea trials of the dredge at the expense of the contractor, and that any defects that might appear were to be remedied by the contractor, and that trials might be repeated until the dredge should be found satisfactory in all respects.
The provisions of section 211, relating to ownership, are as follows: “All parts paid for under the system of partial payments above specified shall become thereby the sole property of the United States, but this provision shall not be interpreted as relieving the contractor from the sole responsibility for
Section 212 provided for insurance against fire and marine risks, at the contractor’s cost and in behalf of the United States, to at least the amount of each partial payment. Here we have, in this last-quoted section the usual stipulation in contracts of insurance that loss, if any, was to be payable to the parties concerned, as their interest might appear; and in this ease the government was not cencerned in .the contemplated insurance beyond security for the partial payments it had made to the contractor on a contemplated purchase of the dredge if it was finally accepted on test that it had been completed and equipped in accordance with the terms of the contract—nothing more or less than a contemplated acquisition of title to a dredge for the use of the War Department of the government in the event that the government at a future day elected to' take over the dredge as a purchaser, the ownership thereof remaining in the builder (Trigg Co.) until this final decision was made. Meantime, between the date of the contract and the contemplated final decision of the government as to whether or not it would become the owner of the dredge, it was only to be constructed from start to finish with materials to be acquired and paid for by the builder. The government sought to provide security for the partial payments of purchase money, as made from time to time, by its contract with the builder, while those furnishing materials needed in the construction and equipment of the dredge had the security provided for them by the statute in such case made and provided, viz., that they should have a prior lien upon the personal property of the builder to the extent of the money due them for such supplies, etc.
It having been held by this court, as we have observed, that the Trigg Company was a manufacturing company, and that its contracts were, therefore, subject to the provisions of our
In United States v. Quincey, 4 Wall. 535, 18 L. Ed. 403, the opinion says: “It is also settled that the laws which subsist at the time and place of the making of a contract, and where it is to be performed, enter into and form a part of it, as if they were expressly referred to or incorporated into its terms. This principle embraces alike those which affect its validity, construction, discharge and enforcement.”
In the later case of Walker v. Whitehead, 16 Wall. 214, 21 L. Ed. 351, the above statement was repeated, and the opinion said: “These propositions may be considered consequent axioms in our jurisprudence.”
Again, in United States v. Bostwick, 94 U. S. 66, 24 L. Ed. 65, the opinion by Waite, O. J., said: “The United States, when they contract with their citizens, are controlled by the same laws that govern the citizen in that behalf. All obligations which would be implied against citizens under the same circumstances will be implied against them.”
The foregoing principles were fully recognized by the government as well as the Trigg Co. when the contract before us was entered into, and for the very purpose of avoiding the rights secured to labor and supply lien creditors by our labor and supply lien statute a stipulation was inserted in the contract, that the “William E. Trigg Co.- should be responsible for and pay all liabilities incurred in the prosecution of the work for labor and materials.” In fact, the learned counsel for the government seems to concede the soundness of the above doctrine, and further that the doctrine laid down in Briggs v. A Light Boat, 7 Allen (Mass.) 297, applies to this case, .viz.: “If it
This is not a case in our opinion, as is earnestly pressed upon us in the argument on behalf of the government, involving the doctrine relating to “sovereignty.” Nor do the principles pronounced in Milhiser v. Gallego Mills Co., 101 Va. 579, 44 S. E. 760, apply to the case, as we shall see later in this opinion.
The right to reject the dredge, or to annul the contract under which it was to be built, is wholly inconsistent with the idea that title passed.' Let'us suppose that the final tests stipulated for had been applied to the dredge and proved unsatisfactory, and the government, as it had clearly the right to do, refused to take over the ownership thereof, electing to look to the provisions of the contract providing indemnity against loss on account of the partial payments that it had made to the Trigg Company, would not the dredge then have been liable to liens for supplies furnished the latter, as provided by our statute? Clearly so, and we are unable to find anything in the contract or in the authorities applicable to its construction which postponed the attaching of liens in favor of supply creditors till the government finally determined not to become the owner of the dredge.
As in the case of Clarkson v. Stevens, 106 U. S. 56, 27 L. Ed. 139, 1 Sup. Ct. 200, the leading intent of the contract is, that the vessel in all respects was to be at the risk of the builder until, upon completion, the United States should accept it, upon final examination and certificate, as conforming in every particular with the requirements of the contract. It would seem to us unreasonable to construe this contract as a purchase and taking over the ownership of the dredge “Benyuard” by the government, for at that date neither the dredge nor any part thereof was in existence, and the provisions of the contract only intended to provide that as the same progressed in construction and was paid for it should be regarded as a colla
The dredge formed no part of the plant of the Trigg Company, and the statute expressly makes the supply lien “prior” to any other lien, etc., on that class of property, created by hypothecation or otherwise. It is very true that this “prior lien” given by the statute to persons furnishing supplies to a manufacturing company is expressly confined to “property of such company,” and cannot, therefore, be extended to property which was at the time thfe supplies were furnished “the sole property of the United States”; but in our view as to the rights of the respective parties to this controversy the dredge in question was not the property of the United States, but the property of the Trigg Company and subject to the lien of supply creditors and to the claims of other creditors of the Trigg Company.
If this be not the correct view, it can be readily seen how easily the salutary provisions of our labor and supply lien statute might be frittered away, especially by conveyances to or contracts with the government, and that, too, in face of the well settled doctrine that the extent of the rights of the government, like those of a private citizen, are determined by the rights of its grantor. It cannot be questioned that the supply-lien statute bound the Trigg Company as though it formed a part of the charter of the company, and disabled it from giving a lien upon, or otherwise disposing of, its property liable to the liens provided by the statute which interfered with
The contract in this case, as in Briggs v. Light Boat, supra, only provided for a purchase of the boat or vessel upon its completion according to specifications, and indemnity against loss of the partial payments made thereon to be effective if the party for whom it was to be built, upon the tests stipulated for being applied, should determine not to purchase the vessel, and the ownership thereof in the meantime necessarily remained in the builder. Under such a contract the authorities agree with decided unanimity that the ownership of the boat remains in the builder till taken over by the party for whom built when completed, as provided in the contract.
A contract between the United States Government and a citizen or a corporation for the building of a boat or vessel for the use of the government, or of any department thereof, differs in no essential feature from a contract between two citizens, or between an individual citizen and a corporation. The rules of construction are the same in either case, and the contract is entered into subject to the principles referred to above. To sustain these principles in this case it is not at all necessary that any lien be declared as existing on the property of the United States, but simply upon the property of the Trigg Company which the United States Government took when it acquired the “Benyuard” under the decrees of the court in this cause, with the stipulation to return or pay for the same should it transpire that the government had thus taken property to which it was not entitled.
The case of Stanley v. Schwalby, 147 U. S. 508-515, 37 L. Ed. 259, 13 Sup. Ct. 418, does not apply. The action in that case was to try title to a lot of land in the possession of the
In Southern Pac. Co. v. United States, 28 Court of Claims 77, the opinion says: “When the government enters into a contract, it lays down its constitutional authority, and has only the same rights and is subject to the same obligations as an individual.”
The case of Andrews v. Durant, 11 N. Y. 35, 62 Am. Dec. 55, relied on for the government in this case, does lay down that it is competent for the parties to agree when and upon what conditions the property which is the subject of the contract shall vest in the prospective owner, and that in such a case the question is simply one of construction. The contest in that case was, however, between the creditors of a shipbuilder and his patron for whom the vessel was being built, and in construing the contract the opinion by Judge Denio held that partial payments and superintendence by the patron were not sufficient to make the title vest in him, hut that the title remained in the shipbuilder, and that the unfinished vessel was subject to the el aims of the creditors. See also Williams v. Jackson, 16 Gray (Mass.) 514.
The opinion expressed by Mr. Myers, vice-president and later the receiver of the Trigg Company in his oral testimony in this cause, over the objection of appellants, even if admissible, can have no weight in construing the contract we have under consideration, since the mere opinion of Mr. Myers as to whether a vessel being built by his company, or any part thereof, under the contract became the property of the party for whom it was being built, and at what time or at what stages of its construction, or what parts thereof, forms no part of the contract.
The contention in the court below was that the dredge “Benyuard” and the tugs “Mohawk” and “Galveston” passed to the government because the contract provided for an inspector and
Mechem on Sales, Vol. I, sec. 755, after stating the general rule under contracts for the construction of a vessel for a given price to be that no property passes in the vessel until it be completed and delivered, says, that this general rule is not varied by any or all of the following facts: “That the price is to be paid in installments as the work progresses; that the vessel is to be built under the superintendence of an inspector employed by the purchaser; that this inspector has the power to approve or reject the materials to be used in constructing the vessel; that the vessel is insured for the benefit of the purchaser; that the contract stipulates that the materials, as and when approved, should become the property of and belong to the purchaser. In other words, the passage of title to a chattel to be constructed is a matter of intention of parties to be arrived at from the terms of the contract between them; the rule being that no property passes until completion, and that none of the above mentioned circumstances indicated an intention in the parties to vary this general rule by the contract.” See also 2 Parsons on Contracts, 259, 260, where the authorities are cited and reviewed.
In Briggs v. Light Boat, supra, Briggs furnished lumber for certain light boats being built by one Andrews, under contract, for the United States, the contract being entire, providing for payment in full by the government upon completion and acceptance of the boats, and also providing that the government might furnish an inspector, but was not required to do so, and that the government should have the right to declare the contract forfeited in case the work should not progress or be done satisfactorily. The boats were completed and accepted by the government, and Briggs then claimed a lien for his supplies under the Massachusetts statutes, and the supreme judicial
It is very true also that the authorities agree that the general rule in cases like this is to be applied according as the intention of the parties may be ascertained from the contract; but we are unable to see how it can be said that it was the intention of the parties to the contract construed in this case that the dredge was to become the property of the government as its building progressed and partial payments therefor were made, free from liability to the claims of the supply creditors of the builder, when by' the provisions of the contract, fairly construed, the government deferred its determination as to whether it would become the owner of the dredge until it was completed and the agreed final tests had been applied and proved satisfactory.
“When a contract is made for the purchase of an article hereafter to be delivered and paid for, so long as any act re
Though the government took possession of the dredge, this case, according to the express provision of the Federal statute under which the possession was obtained, is to be decided as if the possession of the Trigg Company had never been interrupted.
The case of United States v. Snyder, 149 U. S. 110, 37 L. Ed. 705, 13 Sup. Ct. 846, in which there was involved a lien for taxation fixed by Federal statute, does not apply here, since there is no Federal statute involved. The right of the government being contractual merely, no element of sovereignty enters into the case. See authorities cited above, and Gilbert v. United States, 1 Court of Claims 28, where it is said: “The rule regarding the effect to he given to a written contract when the United States are a party is the same as between man and man.”
The contract in Clarkson v. Stevens, 106 U. S. 516, 27 L. Ed. 139, 1 Sup. Ct. 200, provided for an inspecting officer, but expressly declared that he should not pass upon the quality or fitness of the materials or workmanship, but merely as to the cost thereof. It provided that the inspector should receive and receipt for all materials on account of the ISTavy Department, which materials should then be distinctly marked with the' letters, “U. S.,” and should become the property of and belong to the United States. It further provided that Stevens should give a mortgage for the faithful performance of the contract, and final payment for the boat was only to be made after final inspection and acceptance. Upon that state of facts it was held that the United States acquired no title to the boat by its partial payment therefor; that the reservation of final payment and the requirement of a mortgage for the faithful performance of the contract were conclusive circumstances to show
The decision in that case applies with all of its force to the contract we are now considering, for while the contractor (Trigg Co.) was not required to give a mortgage, it was required to give bond with good security in the penalty of $60,-000 for the faithful performance “of all and singular the covenants, conditions and agreements” of the contract, which contained a special provision for the prompt payment in full to all persons supplying labor and materials, and the other essential features are very similar to the provisions of the contract in Clarkson v. Stevens, supra. See also 2 Parsons on Contracts, 259-60, and the authorities there cited.
If there be terms in the contract going to show that the parties intended that certain parts of the vessel should pass to the vendee as the work progressed and was paid for, it would be easy, as the authorities hold, for the parties so to provide in the contract in express terms; but where the contract, as in this case, contains terms and stipulations wholly inconsistent, with any such intention, the general rule of law, that no property in the chattel passes to the vendee till the chattel is completed and delivered, should and must prevail. Authorities above cited, especially Briggs v. A Light Boat; Williams v. Jackson; Elliott v. Edwards, 35 N. J. L. 265; Harvey v. The Schooner "Rosabelle" 20 Wis. 261.
“A person who makes a contract in writing for the building of a ship, to be finished and ready for sea on a day and at a place named in the contract, for a fixed price, part of which he agrees to pay while the work is in progress, in regular weekly payments, without regard to the amount of work accomplished, and the remainder when the ship is ready for sea, acquires no property in the ship before her completion, although an agent employed and paid by him to superintend the construction is, by oral permission of the builders, present every
“That no title passes, ordinarily, during the progress of the work is now clear. This rule prevails in this country, contrary to the later but in conformity with the early English rule, notwithstanding that, by the terms of the contract, the purchaser was to pay and has paid a portion of the price in installments as the work progressed. It also prevails, notwithstanding the fact that the purchaser has furnished a part of the materials, and, by the weight of authority, it prevails though the purchaser not only paid the price in installments as the work progressed, but also, in person or by his agent, superintended the work of construction.” 1 Mechem on Sales, sec. 755.
The title to the dredge remaining in the Trigg Company, it is liable to the demands of its creditors, and first to the supply liens of appellants, which attached before the United States acquired any possession of the dredge “Benyuard,” it follows-that said liens and debts may be enforced against the United States, pursuant not only to the stipulations contained in the agreement filed in this cause and under which the dredge was delivered into the possession of the government, hut pursuant to the settled law applicable to the facts and circumstances of the case.
At the time th-at the receiver for the Trigg Company was appointed in this cause there were seven boats in process of completion at the yards of the Trigg Company, and certain materials had been set apart for use in the construction of each one of them. Of these boats the “Benyuard,” the "“Mohawk,” and the “Galveston,” were being built for the United States government, and the remaining four were being built for corporations. Ho two of the contracts under which these boats were being built were alike. Coming, then, next to the “Mohawk,” we find that this boat was officially known as Eevenue Cutter Ho. 8, and was built under contract with the Secretary of the Treasury of the United States. The contract
“Provided, that the Secretary of the Treasury may, in his discretion, make payments under this contract during the progress of the work not to exceed seventy-five (75 per cent.) of the value of the labor and materials actually furnished and delivered (and not paid for) at the date of any such payment;
“Provided, that a lien shall be, and hereby is, reserved to the United States upon the hull, machinery, fittings, and equipment of said vessel, and the materials on hand for use in her construction, respectively and collectively, for all moneys advanced on account thereof, and that such liens shall commence with the first payment, and shall thereupon attach to the work done and the materials furnished, and shall in like manner attach, from time to time, as the work progresses, and as further payments are made, and shall continue until the completion and acceptance of said vessel.”
At the same time and as a part of this contract a bond was given by the William R. Trigg Company with the Virginia Trust Company as surety, in the penalty of $45,000.00, con
There are but two distinctions between this case and that of the “Benyuard,” viz.: first, that here the contract was madé with the United States Secretary of the Treasury; and, second, the government here only undertook to acquire a lien for payments made as the completion of the vessel progressed. The contract was entered into pursuant to a joint resolution of Congress, passed on May 5, 1894, providing as follows:
“That the Secretary of the Treasury be, and he hereby is, authorized to make partial payments, from time- to time, upon existing contracts and all contracts hereafter made for the com struetion of vessels for the Treasury Department, but not in excess of 75 per cent, of the amount of the value of the work already done; that the contracts hereafter mads shall provide for a lien upon such vessels for all advances so made: Provided, that nothing in this joint resolution shall be construed to hereafter authorize any partial payments, except on contracts stipulating for the same, and then only in accordance with such contract stipulations.”
The difference between an Act of Congress and a joint resolution is, that the former governs all persons under the jurisdiction of the enacting power, while the latter is but a rule for the guidance of the agents and servants of the sovereign. 26 Am. & Eng. Enc. L., 560, and notes.
We fully agree with the view taken by counsel for the appellants, and the master commissioner who reported the liens with their priorities, etc., existing on the Trigg Company’s property when the receiver took possession thereof, that said joint resolution imposed no lien in favor of the United States upon vessels being constructed for it, but simply prescribed a rule as to how contracts should be made by the Secretary of
Here we have a conflict between a contractual lien in favor of the United States Government, and liens given the creditors of the Trigg Company under the laws of Virginia, the liens of these creditors having attached to the property in question before the government acquired possession of it, whatever may be the rights asserted by the government as to a lien thereon; and very clearly the contract for the building of the “Mohawk” was made with reference to the statutory lien in favor of laborers and supply creditors of the Trigg Company, for the government not only undertook to protect itself by reservations of twenty-five per cent, on all payments, but required the Trigg Company to furnish a bond with good security in the penalty of $45,000, conditioned for the proper construction of the vessel according to the contract, etc., and that the Trigg Company “shall promptly make payments to all persons supplying said contractors labor and materials in the prosecution of the work.”
In any view to be taken of this contract and of the joint resolution of Congress, pursuant to which the contract was entered into, the lien stipulated for is contractual only and not a statutory lien. What would have been its effect had it been a statutory lien we need not determine.
If, as the authorities we have cited in this opinion hold, the United States when contracting with a citizen contracts with reference to the laws in force within the jurisdiction where the contract is entered into, the case of United States v. Snyder, 149 U. S. 210, 37 L. Ed. 705, 13 Sup. Ct. 846, relied on so much by the learned attorney for the government, has no application whatever. To sustain the statutory supply liens of appellants upon the “Mohawk” does not “divest, postpone or affect” a title or lien in favor of the United States subsisting by virtue of a valid contract with the government. On the contrary, if the lien of the government, claimed as being superior to the liens of appellants, on the “Mohawk” be so declared, the
That the “Mohawk” in process of building formed no part of the plant of the Trigg Company is not controverted, and instead of the statute (sec. 2485 of the Code, supra,) expressly subordinating a lien for supplies to any previous lien, deed of trust, mortgage, hypothecation, etc., as is contended for the government, it declares it to be “a lien upon all the estate, real and personal,” of a mining or manufacturing company, other than that forming a part of its plant, hut makes the lien inferior only as to any “lien or deed of trust or mortgage, hypothecation, sale or conveyance, made or executed and duly admitted •to record prior to the date at which such supplies are furnished.”
Coming now to the contract for the construction of the cruiser “Galveston,” made December 14, 1899, with the Secretary of the Navy, we find that the contract called for the completion of the cruiser in accordance with the plans and specifications made a part of the contract, and for its delivery at Norfolk within thirty months. The contract, like that for the building of the “Mohawk,” provided for a lien for installment payments made by the government during construction, and stipulated that when the government declared the contract forfeited by reason of the Trigg Company’s failure to go forward with the work and make satisfactory progress, the lien claimed by the government should be as “collateral security for the refund of the installments paid on the contract price for the cruiser.”
We have been unable to find any authority of Congress for the payment of the installments on the “Galveston” or for the taking of a lien therefor, but we do not deem this of any importance. By certain officers of the United States the con
“That said William G. Groesbeek, Emil Theiss and W. H. Moody, Jr., and each of them, their agents, attorneys or employees, and all other persons, be, and they are hereby, enjoined and restrained from in any manner interfering with or taking possession of any property, and especially the cruiser ‘Galveston’ and dredge ‘Benyuard,’ under the control of or in the possession of Lilburn T. Myers, receiver of the court in this cause, under its orders heretofore entered, until the further orders of this court.”
The “Galveston” was also released to the government upon stipulations being filed in this cause by the Hon. L. L. Lewis,Hnited States District Attorney for the Eastern District of Virginia, as provided for in sections 3753 and 3754 of the Eevised Statutes of the Hnited States.
We do not deem it necessary to review the numerous authorities cited in the elaborate discussion by counsel as to the character of lien intended to be provided by the contract upon the ■“Galveston” in favor of the Hnited States, as the provisions ■of the contract plainly indicate that after the declaration of forfeiture the only lien on the cruiser which the government could assert was that of a collateral security for a debt; and the fact that the 13th clause of the contract provided that in a future and uncertain event title to the cruiser might vest in the Hnited States as “collateral security,” in no wise qualified the right of property of the Trigg Company therein. The right of property in the cruiser was to remain in the Trigg Company until completion and delivery to the government, as we view the contract, and if the claim of supply lienors could not attach thereto, as provided in our labor and supply lien statute, it
The point made, that persons furnishing supplies to a shipbuilding company are put upon inquiry as to whether or not the company is engaged in constructing ships for the government and must govern themselves accordingly, does not refute the just claims of supply creditors who have furnished necessary materials or supplies for the operations of the company’s business, a “prior” lien .for which attached under the statute upon the property of the company not forming a part of its plant. If the duty of inquiry existed at all in this or the last case considered above, in the absence of information at the proper place —the office of records—the duty was no more binding either upon the contractor or those furnishing it with necessary supplies than upon the government to take heed of the basic law
In United States v. Canal Bank, Fed. Cas. No. 14, 715, 25 Fed. Cas. 278, the opinion says: “It has long been settled, by the solemn adjudication of the supreme court, that the United States do not possess any general right of priority or privilege over private creditors for the satisfaction of the debts due to them, founded upon any general prerogative belonging to the government in its sovereign capacity; but that all the priority or privilege which the government is at liberty to assert is or must be founded upon some statute passed by Congress in virtue of its constitutional authority. This was expressly so held in United States v. Fisher, 2 Cranch (6 U. S.) 358-396, 2 L. Ed. 304, and the doctrine has ever since been strictly adhered to. U. S. v. Hoose, 3 Cranch (7 U. S.) 73, 2 L. Ed. 370; Prince v. Bartlett, 8 Cranch (12 U. S.) 431, 3 L. Ed. 614; Thelleson v. Smith, 2 Wheat. (15 U. S.) 396, 4 L. Ed. 271; U. S. v. Howland, 4 Wheat. (17 U. S.) 108, 4 L. Ed. 526; Conard v. Atlantic Ins. Co., 1 Pet. 441, 26 U. S. 387, 7 L. Ed. 189. It is not here as it is in England, where the sovereign is entitled, in virtue of his prerogative, to a priority over private creditors for satisfaction of debts due the crown. Com. Dig. ‘Prerogative’ D. 89; Id. ‘Debt,’ G. 8, G. 9.”
See also U. S. v. Bank of N. C., 6 Pet. 34, 8 L. Ed. 308; U. S. v. Amer. Surety Co. (C. C.), 111 Fed. 914; U. S. v. Heaton (C. C. A.), 128 Fed. 414; U. S. v. Detroit L. Ins. Co. (C. C. A.), 131 Fed. 668, 67 C. C. A. 1; U. S. v. Amer. Surety Co. (C. C. A.), 135 Fed. 79; Briggs v. A Light Boat, supra.
In view of the authorities cited, and for the reasons given in the discussion of the cases of the “Benyuard” and the “Mohawk,” as well as this case of the “Galveston,” we are of opin
On June 30, 1902, a contract was entered into by the Trigg Company with the Pennsylvania Railroad Company for the construction of two tugs, spoken of as the “Bristol” and the “Chester.” The first clause of the contract provided, that the contractor (Trigg Co.) should furnish all materials, and build, finish and deliver the tugs in six months at Jersey City, New Jersey; and there follow in the contract stipulations that the railroad company should pay for the work and materials furnished, after inspection, a total sum of $97,750, in ten partial payments as the building of the tugs progressed; that an inspector was to inspect the workmanship and all materials used, with full right to condemn or reject the same, etc.; that (8th clause) when all the work embraced in the contract was completed according to specifications, etc., releases should be furnished the railroad company by the contractor, under seal, from “all the mechanics and material men, all liens, claims and demands for materials furnished and provided and work and labor done,” etc.; that the contractor would safeguard against accident, injuries, etc., to any person or property during construction, and indemnify and save harmless the railroad company therefrom, and from all fines, penalties, etc., incurred for and by reason of the violation of the ordinances of the city of Richmond, statutes of the State of Virginia or of the United States, while the tugs were in process of completion; that insurance against loss or damage by fire, etc., in favor of the railroad company, to an amount equal to that advanced by it in partial payments, should be taken out by the contractor; that satisfactory trial of the tugs, boilers, etc., should be made before' acceptance by the railroad company, and the contractor “to arrange to have the said tugboats pass inspection by the
It is shown in proof that the railroad company paid $60,000 prior to the appointment of the receiver in this cause, on account of the construction of these tugs, but that no releases of liens-were ever asked for or furnished. At the time of the appointment of the receiver the “Bristol” was about 70 per cent, complete, and the “Chester” about 60 per cent., and the tugs were sold in their incomplete state, bought by the railroad company at the price of $38,100, the sale confirmed by decree of the-court, and this money is the substance in dispute in this branch, of the case.
For the reasons stated, and in view of the authorities cited above, we are of opinion that the title to these unfinished tugs-did not, in virtue of the contract for their construction, pass to the railroad company, but remained in the contractor, theTrigg Company, subject to the supply liens matured and reported in this cause, and to the rights of other creditors of the Trigg Company; and that the purchase money received for said tugs is, therefore, liable first to the said liens.
The contract, dated July 17, 1902, between the New York, Philadelphia and Horfolk Railroad Company and the TriggCompany for the construction of a sea-going tug, known as “Hull 23, 'Cape Charles,” contained practically the same stipulations as to materials to be furnished, etc., for the construction of the boat; for inspection and trials, acceptance or rejection by the railroad company; for partial payments of the contract price, $68,250, as the work progressed; for protection to the railroad company against accident, etc., during-construction; for insurance against loss by fire, etc.; and for-
The case presents practically the same facts as those in the case of the Pennsylvania Railroad Company for the construction of the boats “Bristol” and “Chester.” We are of opinion that the said fund of $5,100 realized from the sale of the tug “Cape Charles” is liable for the liens of appellants, matured in this cause, and to the rights of the general creditors of the Trigg Company.
The remaining controversy in the case arises out of a contract entered into by the Trigg Company on November Y, 1901, with the .Standard Oil Company, of New York, “To build and deliver afloat and complete in all respects, and- ready for ser
The hull and machinery of the “Lucas” and the materials assembled for its construction were sold under decree entered November 5, 1903, at public auction, to the Standard Oil Company for $35,000, with the use of the Trigg Company’s ship-yards for its completion, and the purchase money retained under the control of the court to “await the final decision by the court of the various questions as to title and liens raised by the pleadings.”
The Standard Oil Company claims the said sum of $35,000 in virtue of its right to the incompleted vessel, under its contract with the Trigg Company, arguing that the intention of the parties to the contract will control the title to the unfinished vessel, and that the intention to pass the title may be strongly inferred from the supervision of the structure and partial payments at specified stages of the work; admitting, however, that these provisions in the contract are not conclusive of the intention of the parties, and that the weight of authorities in America hold that to ascertain the intention of the parties not only must those provisions be looked to, but the whole contract, together with the surrounding circumstances.
In all of the contracts we have been considering the appellees, including the United States, were contracting with a corporation of the State of Virginia, whose powers were derived from the State, and whose limitations upon its right to sell, mortgage or hypothecate the property of the corporation, to the exclusion of the lien given thereon in favor of those furnishing labor or supplies necessary to the operation of the company’s business, are fixed by statute.
In our view there never was a moment of time, from the ■entering into the several contracts considered in this opinion to the appointment of the receiver in this cause, when the title and possession of the vessel contracted for and all its parts was not in the Trigg Company; and, therefore, there is no escape from the conclusion that these vessels and each of them
As already remarked, the decision in Milhiser v. Gallego Mills Co., supra, lias no controlling influence in the determination of the questions considered and decided in this opinion. This is not a case of a supply lien creditor, upon a claim filed in the clerk’s office against a manufacturing corporation under our labor and supply lien statute, which is sought to be made to reach back and take from a purchaser or the lender of money property that had already become his; nor will the sustaining of the validity and priority of the liens of appellants impair or affect the protection to commercial credit which the law does and ought to safeguard; nor will doubt be thrown upon mercantile usages and the customs of business men.
If, as was said in the case of Fid. Ins. Tr. & S. D. Co. v. Roanoke Iron Co. (C. C.), 81 Red. Rep. 439, relied on by the learned counsel for the Pennsylvania Railroad Co. in one branch of this case, the property ceased to be the property of the manufacturing company before the supplies were furnished, clearly there would be no lien under the statute for supplies; but that was not the case here. In no branch of this case did the contract with the Trigg Company pass title to or the possession of the vessel to the other party to the contract in absolute right, or as a hypothecation to secure advances made to the contractor. The vessel was in every case in an “undeliverable state,” and, therefore, neither the title thereto nor the possession thereof passed from the Trigg Company before the supplies were furnished, as in the case of Fid. Ins. Tr. & S. D. Co. v. Roanoke Iron Co., supra; and from the reason of the thing and from the words of the statute, as said in that case, the lien for supplies furnished by appellants attached to the vessel from the time the supplies were furnished.
In each of these cases-the contract, in so far as it was intended to affect the ■ rights • of the Trigg Company’s supply lien creditors or its general creditors, can only be regarded as
If this be not the correct view of these contracts and as to their effect upon the rights of appellants, then we repeat, that our labor and supply lien statutes are of no force or value in any case where a manufacturing company contracts to build a vessel for any individual citizen, a corporation, or the United States Government. The plain language of the statute is, “and all persons furnishing supplies to a mining or manufacturing company necessary to the operation of the same, shall have a prior lien upon the personal property of such company other than that forming part of its plant to the extent of the money due them for such supplies.” Words more' apt in declaring a prior lien upon a certain class of the property of a mining or manufacturing company in favor of persons furnishing it necessary supplies could not have been employed, and it is not pretended that the vessels upon which appellants’ liens attached formed a part of the Trigg Company’s plant, nor is it denied that the supplies furnished were necessary to the operations of the company.
The learned counsel for appellee, Standard Oil Company, cites the case of Sir James Laine & Sons, Lim., and Barclay & G. H. L. (s. c.), decided November 25, 1901, and reported in the ^February number, 1908, of Appeal Cases, for the proposition that our supply lien statute cannot apply “to an unfinished vessel like the ‘Lucas.’ ” That decision has been carefully examined, and it is found that a similar contention was made in that case to that made here, i. e., that the Scottish Sale of Goods Act could not be held to apply to a ship in- the course of construction; but that view was not sustained; and with respect to that decision we deem it only necessary to say that the opinions delivered therein, as we read them, fully sustain the views we have expressed in this opinion, rather than the contentions of appellees.
Dissenting Opinion
dissenting.
We concur in the conclusion reached by the court, except so far as it holds that the supply lien creditors have a claim upon the vessel known as the “Benyuard” superior to that of the United States Government in and to that vessel.
The contract of the William R. Trigg Company with the government expressly provides that the government shall take title to the “Benyuard” as payment is made thereon; and there is, in our opinion, nothing in the contract to show any other or different intent.
We are, therefore, of opinion that on this point the decree appealed from should be affirmed.
Whittle, J., concurs with Keith, P., and Caldwell, J.
Reversed.