7 S.D. 38 | S.D. | 1895
This case is now before us on a rehearing. The original opinion is reported in 4 S. D. 358. In granting a rehearing, we were largely influenced by the importance of the questions involved, not alone to the immediate parties, but to a large number of other landowners in the township whose boundary lines were in similar controversy, and whose rights would be affected by the decision of this case. We have very carefully re-read the evidence claimed by either side to throw light upon the disputed question of fact, and are brought to the same conclusion announced in our former opinion. It would be profitless labor to go over the ground again.
There were, however, several errors assigned by appellant, based upon rulings of the^trial court in allowing or refusing evidence, which seem not to have been expressly noticed in the opinion, and which will be briefly considered. Thomas Olson was a witness for plaintiff. He was a landowner within the territory within which the disputed lines were located. His evidence on his direct examination tended to place the corners and lines as claimed by the plaintiff. On cross examination he was asked how much land the location of the corners and lines where his testimony tended to place them would give him in his quarter section. The court overruled an objection to this question.* We think the
J. A. Bannister, a witness for plaintiff, was asked: “Do you know according to what monuments or mounds the old settlers located their lands?” An-objection this question was sustained, and the ruling is assigned as error. We are inclined to think that affirmative evidence, of which the question might have been anticipatory, would have been competent, and we should have been better satisfied if the trial court had allowed the witness to answer; but the question was only preliminary, and a responsive answer to it would alone have been of no benefit to the plaintiff; hence he suffered nothing by not getting it. To show available error, the plaintiff should have gone further, and offered to prove the substantive fact to which this question of knowledge on the part of the witness was only introductory or preliminary. To show that this ruling did not constitute material and available error, we have only to suppose that we reverse this case on that ground, and upon a retrial the witness is asked the same question, and his answer is, “No, I do not.” In Houghton v. Clarke, 80 Cal. 417, 22 Pac. 288, the rule in such case is stated to be: “If a question does not itself indicate whether the answer would be material or not, and there is no offer to prove the facts sought to be elicited, it is not a material error to exclude the question.”
It is next assigned as error that the court refused “to allow witness Lars Larson to answer the following question”: “Has this old road now traveled been worked by the residents along that road?” This is probably a mistake as to the name of the witness, at least, as no witness of that name appears to have been sworn in the case. Neither does such question of ruling appear in connection with the testimony of Christian Larson, the only witness with that surname. Considering the character of the question, and the length of the record presenting the evidence in the case, we think we are justified in passing this assignment.
It is contended, however, that as this resurvey was made at the instance of, and under contract with, the township board of supervisors, and that as this court held in Van Antwerp v. Dell Rapids Tp., 59 N. W. 209, that such board had no power to institute such resurvey or to make such contract, it must follow that what was so done by the surveyor at the instance of this township board was nugatory, and afforded no protection to the defendant township or its officers, in opening or working a highway on the line of this resurvey. This contention cannot be maintained. The ultimate and controlling ■ question in this case is, where in fact is this township line? Upon this line the statute locates the highway, and if the evidence satisfies the court that it is really where these defendants were assuming it to be and where in consequence they were proceeding to open and work a highway, it is entirely immaterial, as affecting the question here in dispute, that the surveyor who made the resurvey, and who reached the same conclusion as to the location of the line as the court did, was working under an authorized contract. In the Yan Antwerp Case referred to, we held simply that the township board of supervisors had no authority to bind the township by a contract for such resurvey, and that an action to recover for such services could not be maintained upon it. We do not think the decision in that case