772 N.E.2d 138 | Ohio Ct. App. | 2002
[EDITORS' NOTE: THIS PAGE CONTAINS HEADNOTES. HEADNOTES ARE NOT AN OFFICIAL PRODUCT OF THE COURT, THEREFORE THEY ARE NOT DISPLAYED.] *55
{¶ 2} The case was referred to a magistrate. A trial was held before the magistrate and on March 21, 2001, the magistrate issued a decision. The decision noted that the Hansels' Ohio Consumer Sales Practices Act claim had been voluntarily dismissed prior to trial. The magistrate then addressed the issues relating to the Hansels' claims regarding the construction of the concrete driveway. The magistrate found, in essence, that there were problems with the driveway but that Creative Concrete had substantially complied with the terms of the contract. The magistrate then determined that the Hansels' damages were $1,206.
{¶ 3} The Hansels filed objections to the magistrate's decision, and Creative Concrete filed a memorandum contra. On March 30, 2001, Creative Concrete filed a motion for attorney fees pursuant to R.C.
{¶ 4} On May 14, 2001, the trial court rendered a decision denying Creative Concrete's motion for attorney fees under R.C.
{¶ 5} The Hansels (hereinafter "appellants") have appealed to this court, assigning the following errors for our consideration:
{¶ 6} 1. The trial court erred in its computation of damages due the Appellants.
{¶ 7} 2. The Magistrate's finding of substantial compliance is against the manifest weight of the evidence. *56
{¶ 8} Creative Concrete (hereinafter "appellee") has filed a cross-appeal, assigning the following as error:
{¶ 9} The Trial Court Erred In Denying Defendant-appellee's Motion For Attorney's Fees.
{¶ 10} As they are interrelated, appellants' first and second assignments of error will be addressed together. Appellants contend the trial court erred in adopting the magistrate's finding that appellee had substantially complied with the terms of the contract and in accepting the magistrate's computation of damages. As indicated above, the magistrate found that although the concrete driveway did contain defects, substantial compliance existed. The magistrate stated that the issue then became the proper measure of damages. The magistrate concluded that the Hansels would be adequately compensated by damages based on repair of the driveway as opposed to a complete replacement of the driveway. Using a formula based on the average thickness of the completed driveway (4 inches) compared to what was actually contracted for (4.5 inches), the magistrate arrived at a damages figure of $1,206 (the contract price was $10,855.10).
{¶ 11} Appellants assert that the evidence showed there were many problems with the driveway in addition to the thickness problem, that the driveway had completely failed, that substantial compliance had not occurred and that, therefore, complete replacement was the proper remedy. We note first that the magistrate intermingled the concepts of substantial compliance and the proper method of measuring damages in breach of contract cases. However, substantial compliance is not actually a damages issue. Rather, it goes to whether or not breach has occurred. Indeed, as this court stated in Kersh v. Montgomery Developmental Ctr. (1987),
{¶ 12} Stated another way, a party does not breach a contract when such party has substantially performed the terms of the contract, and mere nominal, trifling or technical departures are not sufficient to constitute breach. Burlington Resources Oil Gas Co. v. Cox (1999),
{¶ 13} In general, substantial compliance will support a recovery of the contract price less allowance for defects in performance or damages for failure to strictly comply with the contract. Spitzer v. Forrester (Oct. 19, 1981), Montgomery App. No. 7087, unreported, citing Creith Lumber, Inc. v. Cummins (1955),
{¶ 14} The issues in the case at bar involve whether the trial court erred in adopting the magistrate's finding of substantial performance and calculation of damages. Judgments supported by some competent, credible evidence going to all the essential elements of the case will not be reversed by a reviewing court as being against the manifest weight of the evidence. C.E. Morris Co. v. Foley Construction Co. (1978),
{¶ 15} Appellants contracted with appellee for the construction of a concrete driveway at their residence. While it was appellants' residence, appellants parked heavy work trucks used in their business on the driveway. The contract called for, among other things, that the concrete be 4.5 inches thick and that wire mesh be used. The work was completed, and appellants gave appellee a check for the remaining balance. The check bounced, and this caused friction between the parties. However, appellants soon thereafter paid the full contract price of $10,855.10. Appellants became dissatisfied with the concrete driveway. Appellants believed the concrete was not as thick as called for in the contract. Hence, appellants filed the present suit.
{¶ 16} The evidence showed that there were defects with the driveway such as cracking, scaling and pitting and that such was largely due to appellee's failure to act in a workmanlike manner in finishing the driveway with the proper techniques. In addition, there were problems such as misplacement of the wire mesh and an uneven subbase. Further, core samples taken showed a range of thickness of the concrete of 3.4 to 4.6 inches, with an average thickness of 4 inches. The contract called for a thickness of 4.5 inches. Despite these *58 problems, the evidence does support the magistrate's conclusion that appellee had substantially performed under the contract in that the driveway had not failed in it essential purpose.
{¶ 17} Appellants' expert did testify that there was significant damage after only one to two years and that the driveway's life expectancy would be substantially less than the normal 15 to 20-year life expectancy. (Tr. 119, 131.) However, he further testified that the concrete itself was satisfactory. Id. at 121. In addition, he stated that the cracks could be sealed and that the scaling, "pop outs" and cracking would not improve unless repair methods were utilized. Id. at 121, 126.
{¶ 18} Appellee's expert, an engineer, testified that all cracks and scaling can be repaired and that replacement was unnecessary. Id. at 287-288, 291. Appellants' expert stated that he was not hired to opine about the repair possibilities; rather, his company was hired to evaluate the condition of the driveway. Id. at 155. However, he testified that there were three choices as to this driveway: (1) leave it like it is, and it would continue to deteriorate; (2) remove and replace it; or (3) utilize an approved repair method. Id. at 134. When asked when the driveway should be replaced or repaired, appellants' expert stated:
{¶ 19} Well, it is like this, the damage is going to continue to get worse with each successive exposure to freezing and thawing cycles. The scaling is going to get worse. The cracks that are there are pretty much at their extent except for where the areas are not supported by subbase. There will be more cracks forming there. The damage is going to get worse over a period of time.
{¶ 20} When should it be replaced? Whenever the owner gets tired of looking at it. That is my opinion. Id. at 168-169.
{¶ 21} When asked by the magistrate how much of a reduction in the typical life span had occurred with the driveway, appellants' expert stated:
{¶ 22} It is going to be difficult to talk about it in those terms. I don't think it can be quantified. It is more of a subjective, not just appearance, but performance. It has already failed. It has already reached its life-span. It has already started to deteriorate, showing braking and scaling. It is not meeting its intentions of being a nice-looking finished product. It has scaling on the surface, It has cracking. It has already met its life expectancy. Those things shouldn't be observed for 15 or 20 years. Is it serviceable? Sure. But to what degree? You know, any concrete is serviceable for any number of reasons, but it is to what degree you want to accept the conditions of it. So that question can be answered as far as how many years reduction has occurred. I would say already it reached its limit. It has already shown failure.
{¶ 23} On the other hand, it can be used like it is if somebody wanted to accept the defects that are there, but the only thing, there is no subbase *59 underneath there in some spots, so it is going to continue to deteriorate, and eventually it will probably look a lot worse than what it does right now. Id. at 180.
{¶ 24} The above evidence allowed the magistrate to conclude that while appellants did not receive exactly what they bargained for, the driveway still met its essential purpose. There was no testimony that the driveway was unusable or would become so in the near future. Pictures admitted at trial showed some surface defects, but the driveway was clearly useable. All experts testified that cracks can never be prevented.
{¶ 25} Hence, appellee substantially performed under the contract and was entitled to be paid for such performance less an allowance for the defects in such performance or damages for failure to strictly comply with the contract. Appellants assert that they should be awarded damages of $23,860 — over twice the contract price — which is the amount necessary to completely replace the driveway. However, not only is this award improper due to appellee's substantial performance under the contract, such award is not supported by the evidence going to the damages element itself.
{¶ 26} Ordinarily, the cost of repairs is the proper measure of damages for construction defects. Barton v. Ellis (1986),
{¶ 27} It was appellants' burden to prove damages. See Akro-Plastics v. Drake Industries (1996),
{¶ 28} As discussed above, the defects in the driveway included more than just the lack of the thickness agreed upon under the contract; however, there was little if no evidence of any actual damage arising from this shortfall. Accordingly, we question the appropriateness of computing damages based on the thickness of the driveway. However, we understand that the magistrate had no *60 evidence regarding damages other than replacement cost. Appellee has not filed a cross-appeal taking issue with the magistrate's award of damages to appellant. Hence, this court will not interfere with the amount awarded.
{¶ 29} For all of the reasons set forth above, this court finds that the trial court did not err in adopting the magistrate's decision which found appellee had substantially performed under the contract and that appellant was entitled to $1,206 for damages. Accordingly, appellants' first and second assignments of error are overruled.
{¶ 30} Turning to appellee's cross-appeal, appellee contends the trial court erred in denying its motion for attorney fees under R.C.
{¶ 31} R.C.
{¶ 32} (F) The court may award to the prevailing party a reasonable attorney's fee * * *, if either of the following apply:
{¶ 33} (1) The consumer complaining of the act or practice that violated this chapter has brought or maintained an action that is groundless, and the consumer filed or maintained the action in bad faith[.] [Emphasis added.]
{¶ 34} A prevailing party does not exist when a claim is voluntarily dismissed. See Sturm v. Sturm (1992),
{¶ 35} For this reason, the trial court did not err in denying appellee's motion for attorney fees under R.C.
{¶ 36} In summary, appellants' assignments of error and appellee's cross-assignment of error are overruled. The judgment of the Franklin County Court of Common Pleas is affirmed.
Judgment affirmed.
BRYANT and LAZARUS, JJ., concur.