DECISION AND ORDER
In 2004, plaintiffs Habitat Education Center, David Zaber, Ricardo Jomarron, Don Waller, and the Environmental Law and Policy Center brought this action pursuant to the Administrative Procedure Act (“APA”), 5 U.S.C. § 706, against the United States Forest Service and other federal officials and entities. 1 Plaintiffs challenged the Forest Service’s approval of the McCaslin timber project in the Chequamegon-Nicolet National Forest (“CNNF”). Plaintiffs alleged that the Forest Service violated the National Environmental Policy Act (“NEPA”), 42 U.S.C. § 4321 et seq., and the National Forest Management Act (“NFMA”), 16 U.S.C. §§ 1600-1687.
In March 2005, I found that the Forest Service violated NEPA by failing to prepare an adequate environmental impact statement (“EIS”) and enjoined the project until the Forest Service complied with NEPA.
See Habitat Educ. Ctr., Inc. v. Bosworth (“Habitat I”),
Following the preparation of the SEIS and new ROD, the Forest Service filed a motion to lift the injunction in this case. However, because the motion to lift the injunction did not attempt to show that the SEIS complied with NEPA, I denied the motion without prejudice. The parties *1012 have since filed cross-motions for summary judgment addressing the adequacy of the SEIS, and I consider below whether the Forest Service has complied with NEPA and whether the injunction should be lifted.
I.BACKGROUND
I have extensively discussed the history of the CNNF and the background to plaintiffs’ claims in other opinions.
See Habitat Educ. Ctr. v. U.S. Forest Serv. (“Habitat V”),
II.STANDING
The Forest Service argues that plaintiffs did not have standing to seek the original injunction in this case and that, even if they did, they do not currently have standing to oppose the Forest Service’s motion to lift the injunction. To show that they have standing to seek injunctive relief, plaintiffs must demonstrate that they are under threat of suffering an injury-in-fact that is concrete and particularized; the threat must be actual and imminent, not conjectural or hypothetical; it must be fairly traceable to the challenged action of the defendant; and it must be likely that a favorable judicial decision will prevent or redress the injury.
See, e.g., Summers v. Earth Island Inst.,
-U.S.-,
Before I enjoined the McCaslin project, plaintiffs submitted affidavits showing that the individual plaintiffs and the members of the organizational plaintiffs regularly visited the CNNF and the McCaslin project area, and that the McCaslin project would harm their professional and recreational interests in the area. (Exs. 1 & 2, Docket Entry # 31.) Further, plaintiffs recently filed supplemental affidavits indicating that they continue to visit the CNNF and the project area and that the present iteration of the McCaslin project would harm their professional and recreational interests in the area. (Exs. 2-4, Docket Entry # 186.) These affidavits satisfactorily demonstrate that plaintiffs have personal stakes in this lawsuit sufficient to warrant their invocation of federal court jurisdiction.
Summers,
III.DISCUSSION
A. Standard of Review
When an agency’s decision is challenged under the APA based on the agency’s failure to comply with NEPA, the standard of judicial review is a narrow one.
Highway J Citizens Group v. Mineta,
*1013
In the present case, plaintiffs argue that the Forest Service did not comply with the procedures required by NEPA because it did not prepare a satisfactory EIS before approving the McCaslin project. NEPA requires that federal agencies prepare an EIS for all “major Federal actions significantly affecting the quality of the human environment.” 42 U.S.C. § 4332(2)(C). An EIS is “a detailed analysis and study conducted to determine if, or the extent to which, a particular agency action will impact the environment.”
Highivay J,
In making its pragmatic judgment, a court must be careful not to “ ‘flyspeck’ an agency’s environmental analysis, looking for any deficiency, no matter how minor.”
Nat’l Audubon Soc’y,
With this standard in mind, I turn to plaintiffs’ arguments.
B. Analysis of Cumulative Impacts
Plaintiffs’ fist two arguments are addressed to the discussion of cumulative impacts in the SEIS. Regulations promulgated by the Council on Environmental Quality (“CEQ”) 3 require that an EIS include a discussion of environmental impacts, including impacts that are direct, indirect and cumulative. 40 C.F.R. § 1508.25. “Cumulative impact” is:
the impact on the environment which results from the incremental impact of the action when added to other past, present and reasonably foreseeable future actions regardless of what agency (Federal or non-Federal) or person undertakes such other actions. Cumulative impacts can result from individually minor but collectively significant actions taking place over a period of time.
40 C.F.R. § 1508.7. A proper cumulative impacts analysis will assess the proposed action in light of other activity that has affected or will affect the same environmental resources. The goal is to highlight any environmental degradation that may occur if the minor effects of multiple actions accumulate over time. For example, although a single forest project might have minimal environmental consequences, combining that project with those that preceded it and others that are anticipated might reveal a more serious overall impact. Placing the project into a broader context that includes these recent and anticipated projects helps prevent “the tyranny of small decisions.” Council on Environmental Quality, Considering Cumulative Effects Under the National Environmental Policy Act 1 (Jan.1997), available at http:// ceq.hss.doe.gov/nepa/ccenepa/ccenepa.htm (last viewed Jan. 5, 2010) (hereinafter “CEQ Guidance”).
With respect to the Forest Service’s cumulative-impacts analysis, plaintiffs allege *1015 the following deficiencies: (1) the Forest Service arbitrarily limited the geographic scope of the analysis to the Nicolet side of the CNNF; and (2) the Forest Service failed to discuss certain reasonably foreseeable projects that were proposed after the SEIS was drafted. I address these contentions below.
1. Selection of geographic area to be analyzed for cumulative impacts.
One of the first steps in any cumulative effects analysis is to identify the geographic boundaries within which cumulative effects will be measured. Identifying such boundaries “is a task assigned to the special competency of the appropriate agencies.”
Kleppe,
In the present case, the affected resources are the sensitive species within the CNNF — American Pine Marten, Northern Goshawk, and Red-shouldered Hawk. The SEIS discusses the cumulative impacts of past, present and reasonably foreseeable forest projects on the viability of these three species. SEIS at 27-36. 4 For each species, the Forest Service limited its discussion of cumulative impacts to those affecting the population of sensitive species located on Nicolet side of the forest. 5 Plaintiffs argue that because American Pine Marten, Northern Goshawk, and Red-shouldered Hawk are located on both the Chequamegon and Nicolet sides of the CNNF, the Forest Service should have considered cumulative impacts to these species on a forest-wide basis, and that therefore the analysis in the SEIS is deficient.
I conclude that the Forest Service drew reasonable geographic boundaries. The discussion in the SEIS begins by noting that, for each species, the default geographic boundary is normally the entire CNNF. SEIS at 27-36. The Forest Service then explains that it limited its detailed cumulative-effects analysis to the Nicolet side of the CNNF because the Nicolet and Chequamegon populations of each species do not interact and are inde *1016 pendent of each other. Because the populations do not interact, the destruction of habitat on the Nicolet side of the CNNF would not threaten the viability of populations on the Chequamegon side, and vice versa. Similarly, the preservation of habitat on the Nicolet side would not benefit the populations on the Chequamegon side, and vice versa. Thus, a project conducted on the Nicolet side of the CNNF will have no impact on the viability of Chequamegon populations, and a project conducted on the Chequamegon side will have no impact on the viability of Nicolet populations.
Plaintiffs argue that even though the Nicolet and Chequamegon populations of the relevant species are independent of each other, the Forest Service must still assess the impact of the McCaslin project on the forest-wide population of each species. But as just discussed, the Forest Service did assess the project’s impact on the forest-wide population of each species. It first concluded that the McCaslin project will have no impact on Chequamegon populations and that any projects occurring on the Chequamegon side of the forest will have no impact on Nicolet populations. It then studied in detail the cumulative impact of the McCaslin project on the only resources that will be impacted by the project— the Nicolet population of each species. Because the McCaslin project will have no impact on Chequamegon populations and Chequamegon projects will have no impact on Nicolet populations, informed decisionmaking and informed public participation did not require an extensive discussion of Chequamegon projects or Chequamegon populations. 6
Plaintiffs also take issue with the Forest Service’s conclusion that the Nicolet and Chequamegon populations do not interact. However, the degree of interaction between the two populations is a technical issue that implicates the agency’s expertise, and I must defer to the Forest Service’s conclusion so long as it is not arbitrary and capricious.
See, e.g., Marsh,
Plaintiffs also argue that even if the Nicolet and Chequamegon populations do not interact, the Nicolet populations of goshawk and marten do extend into the Ottawa National Forest in Michigan’s upper peninsula, and that therefore the geographic scope should have been extended to include the Ottawa National Forest. With respect to goshawk, the biological evaluation attached to the McCaslin SEIS indicates that goshawk that nest on the Nicolet side of the CNNF may forage in the Ottawa National Forest. SEIS, Appx. B, at 33. Plaintiffs argue that the Forest *1017 Service should have accounted for any projects in Ottawa that might impact the Ottawa foraging territory used by the Nicolet goshawk population. However, the Forest Service did take the Ottawa foraging territory into consideration. It noted that no timber projects have occurred in the Ottawa foraging territory in over fifteen years, and that therefore there are no Ottawa projects to include in the cumulative-impacts analysis. Id.
With respect to marten, plaintiffs point out that in July 2006 a researcher from Michigan State University stated that “[tjhere appears to be some gene flow between the Nicolet Forest population and martens in the Upper Peninsula.” R. 002236. However, as far as the record reveals, this is simply one researcher’s tentative opinion. Further, the opinion was not presented until ten days after the biological evaluation for the McCaslin project was finalized and well after the draft SEIS was issued, and thus the Forest Service was not required to address it unless it resulted in a seriously different picture of the environmental landscape. See infra, p. 16. The record does not reveal that this opinion resulted in such a change.
Accordingly, I conclude that the Forest Service’s choice of geographic scope for its cumulative-impacts analysis was not arbitrary and capricious.
2. Failure to supplement SEIS to account for certain reasonably foreseeable projects.
As indicated, the CEQ regulations require that an EIS include a discussion of the environmental impact of a project when added to “other past, present and
reasonably foreseeable future
actions.” 40 C.F.R. § 1508.7 (emphasis added). At the time the SEIS for McCaslin was completed, the regulations did not define “reasonably foreseeable future actions.”
7
However, courts have applied the “rule of reason” discussed above to the question of whether an agency should have discussed a particular future action in its EIS.
See City of Oxford, Ga. v. Fed. Aviation Admin.,
Plaintiffs argue that the Forest Service failed to consider two reasonably foreseeable projects when it analyzed and approved the McCaslin project — Fishel and Grub Hoe. Both projects are scheduled to occur on the Nicolet side of the CNNF in the near future. The Forest Service did not discuss either of these projects in the McCaslin SEIS. The Forest Service contends that it was not required to discuss them because it did not have meaningful information about their environmental effects until after the draft SEIS for McCaslin was completed.
In my past decisions involving the CNNF, I addressed similar arguments by the parties.
See Habitat V,
In the present case, I conclude that the Forest Service was not required to discuss Grub Hoe in the McCaslin SEIS because the record contains no evidence suggesting that the Forest Service had any meaningful information about Grub Hoe at the time it finalized the SEIS. Indeed, the project was not formally proposed until more than a year and a half after the final McCaslin SEIS was issued.
The Fishel project is a closer call. That project was formally proposed on March 9, 2006, four months before the final SEIS for McCaslin was issued. In the proposal, the Forest Service identified the project’s boundaries, stated the project’s objectives, and identified the precise action it proposed to take. See R. 000063-70. The proposal even estimated the number of acres that would be affected by the project and the volume of timber that would be made available for sale. R. 000069. Thus, by September 2006, when the McCaslin project was approved, the Fishel project was a reasonably foreseeable future action that could have been meaningfully discussed. However, the Forest Service argues that it was not required to discuss Fishel in the McCaslin SEIS because the draft SEIS for McCaslin was issued in January 2006, two months before the Fishel project was formally proposed.
In my prior decisions, I did not need to distinguish between a draft EIS and a final EIS because both the draft and final EISs for the relevant projects had been issued before meaningful information concerning the reasonably foreseeable future actions was available. The present case presents the question of whether a final EIS must contain a discussion of reasonably foreseeable future projects when meaningful information about the environmental effects of those projects becomes available after the draft EIS is released but before the final EIS is completed.
Pursuant to CEQ regulations, “environmental impact statements shall be prepared in two stages and may be supplemented.” 40 C.F.R. § 1502.9. The regulations state that most of the heavy lifting in terms of environmental analysis should be performed before the draft EIS is completed. Id. § 1502.9(a) (“The draft statement must fulfill and satisfy to the fullest extent possible the requirements established for final statements....”). Once the draft EIS is completed, the agency must solicit comments from the public and other agencies. Id. §§ 1502.9(b) & 1503.1. The agency must then respond to comments in the final EIS. Id. § 1502.9(b). The CEQ regulations also require agencies to “prepare supplements to either draft or final environmental impact statements” if the agency “makes substantial changes in the proposed action that are relevant to environmental concerns,” or “[t]here are significant new circumstances or information relevant to environmental concerns and bearing on the proposed action or its impacts.” Id. § 1502.9(c)(1).
The regulations thus indicate that any reasonably foreseeable projects that can be meaningfully discussed by the time a draft EIS is completed must be discussed in the draft. Further, because the purpose of the final EIS is to respond to comments rather than to complete the environmental analysis (which should have been completed before the draft was released), an agency is not automatically required to discuss projects that become reasonably foreseeable during the interim between the release of the draft EIS and the release of the final EIS. Instead, when new information about a reasonably fore *1019 seeable project becomes available after the draft EIS is released, the question is whether the agency is required to supplement the draft statement to account for the new information.
In my earlier decisions involving the CNNF, I discussed the legal standards that courts apply when determining whether an agency is required to supplement an EIS.
Habitat V,
Nothing in the administrative record indicates that the anticipated environmental effects of the Fishel project will result in a serious change to the environmental landscape presented in the McCaslin SEIS. There is no indication that, for example, the loss of habitat that the Fishel project will cause, when combined with the loss of habitat that the McCaslin project will cause, will result in habitat quantity falling below desired thresholds for species viability. Further, to the extent that the Fishel project will contribute to the cumulative impact of timber projects conducted on the Nicolet side of the forest, the Forest Service will analyze and consider that impact in the Fishel EIS — i.e., before the Fishel project is implemented and the cumulative impact is realized. 8 Thus, the “tyranny of small decisions” will be avoided even if the McCaslin SEIS is not supplemented.
Accordingly, I conclude that the McCaslin SEIS is not invalid due to its failure to discuss the Grub Hoe and Fishel projects.
C. Analysis of Reasonable Alternatives
An EIS must discuss alternatives to a proposed action. 42 U.S.C. § 4332(2)(C)(iii). The CEQ regulations specify that the agency preparing an EIS must “[rjigorously explore and objectively evaluate all reasonable alternatives, and for alternatives which were eliminated from detailed study, briefly discuss the reasons for their having been eliminated.” 40 C.F.R. § 1502.14(a).
In their initial complaint, plaintiffs did not allege that the discussion of reasonable alternatives in the McCaslin EIS was deficient. However, they alleged that the EIS did not contain an adequate discussion of the cumulative impacts of the McCaslin project on American Pine Marten, Northern Goshawk and Red-shouldered Hawk. I found that the cumulative-impacts discussion in the original EIS was deficient because it did not discuss the cumulative impact to each species in adequate detail.
Habitat I,
I begin by noting that, to an extent, the Forest Service has revisited its analysis of reasonable alternatives. In the SEIS, the Forest Service analyzes the expected cumulative impact of each of five alternative proposals — one “no action” alternative and four “action” alternatives' — on each species. SEIS at 27-36. These five alternatives are the same five alternatives that the Forest Service selected for detailed study in the original EIS. Plaintiffs argue that the Forest Service should have started from scratch and reconsidered all possible alternatives in light of the revised cumulative-impacts discussion, rather than limiting the revised analysis to those alternatives selected for detailed study during the original EIS process.
I conclude that the SEIS contains an adequate discussion of alternatives. Although the Forest Service did not reconsider any alternatives other than those selected for detailed study during the original EIS process, plaintiffs have not shown that the revised cumulative-impacts analysis had any effect on the Forest Service’s rationale for eliminating alternatives from detailed study the first time around. In the original EIS, the Forest Service gave reasons for eliminating seven alternatives from detailed study, and none of those reasons had anything to do with cumulative effects. See McCaslin EIS at 22-23. 9 Thus, although I agree with plaintiffs that the Forest Service would have been required to revisit its elimination of alternatives if the revised cumulative-impacts analysis undermined the reasons for eliminating those alternatives from detailed study, the record does not indicate that any of the original reasons have been undermined.
Plaintiffs also argue that the Forest Service violated NEPA by designating one of the four alternatives (Alternative 5) as its “preferred” alternative during the SEIS process. Plaintiffs contend that the Forest Service should have analyzed the alternatives without expressing a preference for any of them. However, I am aware of no authority prohibiting an agency from informing the public that it thinks one particular alternative best fulfills the project’s purposes. Of course, the agency cannot rig the environmental analysis to make the preferred alternative look more attractive than it is or focus on the preferred alternative to the exclusion of other reasonable alternatives, but the record in the present case does not suggest that the Forest Service rigged the analysis or failed to objectively evaluate the other four alternatives.
Accordingly, I conclude that the SEIS contains an adequate discussion of reasonable alternatives.
IV. CONCLUSION
For the reasons stated, IT IS ORDERED that plaintiffs’ motion for summary judgment is DENIED and that defendants’ motion for summary judgment is GRANTED.
IT IS FURTHER ORDERED that the injunction entered on April 4, 2005 is DISSOLVED.
IT IS FURTHER ORDERED that the Clerk of Court enter judgment accordingly-
Notes
. For simplicity, I will refer to all defendants collectively as the Forest Service.
. Some courts have described this standard as applying a "rule of reason,” under which the court asks "whether an EIS contains a reasonably thorough discussion of the significant aspects of the probable environmental consequences.”
See, e.g., Churchill County,
. NEPA established CEQ as an agency within the Executive Office of the President. It "coordinates federal environmental efforts and works closely with agencies and other White House offices in the development of environmental policies and initiatives.” See http:// www.whitehouse.gov/administration/eop/ceq (click "About CEQ”) (last viewed Jan. 8, 2010).
. The SEIS is located in the administrative record at 000569.
. As explained in my prior opinions, the CNNF consists of two noncontiguous landbases, the Chequamegon and the Nicolet.
See, e.g., Habitat IV,
. Plaintiffs point out that they are concerned about the cumulative impact of timber projects on both the Chequamegon and Nicolet populations, and that therefore informed public participation required a discussion of Chequamegon populations and Chequamegon projects. Again, however, the McCaslin SEIS disclosed that the McCaslin project will have no impact on Chequamegon populations, and that therefore the project will not contribute to the cumulative impact to Chequamegon populations. To the extent that other timber projects will impact Chequamegon populations, plaintiffs can consult the environmental documents prepared for those projects.
. In a regulation effective July 24, 2008, the Forest Service defined “reasonably foreseeable future actions’’ as “[flhose Federal or non-Federal activities not yet undertaken, for which there are existing decisions, funding, or identified proposals.” 36 C.F.R. § 220.3.
. In fact, the final EIS for the Fishel project does account for the environmental effects of the McCaslin project on American Pine Marten, Northern Goshawk and Red-shouldered Hawk. See Fishel Environmental Impact Statement at 67-82, available at http://www. fs. fed.us/r9/cnnFnatres/eis/erfI/fishel/01 - Fishel.FEIS.0222008.pdf (last viewed Jan. 8, 2010).
. The original McCaslin EIS is available on the CD located at R. 000567.