MILTON GUZMAN et al., Appellees, v. C.R. EPPERSON CONSTRUCTION, INC., Appellee (MJE Construction, Inc., et al., Appellants).
No. 89006
Supreme Court of Illinois
Opinion filed June 21, 2001.
196 Ill. 2d 391
Richard G. Fehrenbacher, of Fehrenbacher & Fehrenbacher, of Wyoming, for appellant Michael Hadden, d/b/a Hadden Concrete.
Thomas M. Shields, of Lexington, for appellant Robert Georgi, d/b/a G&G Roofing.
Brian P. Thielen and Barbara E. Snow, of Thielen Law Offices, of Bloomington, for appellee C.R. Epperson Construction, Inc.
JUSTICE FREEMAN delivered the opinion of the court:
We granted leave to appeal in this case (
BACKGROUND
On September 25, 1992, plaintiffs in the underlying action, Milton and Donna Guzman (the Guzmans) filed their original complaint which named C.R. Epperson Construction, Inc. (Epperson), as the defendant. The Guzmans alleged that, in 1988, they entered into a contract with Epperson for the construction of a house in Bloomington, Illinois. They further alleged that Epperson breached the contract by constructing a home that contained numerous design and construction defects. The Guzmans voluntarily dismissed the suit on March 28, 1996, and refiled a new action on April 12, 1996. In the refiled pleading, the Guzmans alleged both breach of contract and breach of implied warranty of habitability
On September 4, 1996, Epperson filed its third-party complaint against MJE Construction, Inc. (MJE), Michael Hadden, then doing business as Hadden Concrete, Holland Brothers, Inc., Hardesty Heating and Ventilating, Inc. (Hardesty), and Robert Georgi, doing business as G&G Roofing (Georgi).1 Epperson alleged that it entered into subcontracts with each of the third-party defendants under which the third-party defendants agreed to perform various aspects of the construction of the Guzman home. The third-party complaint sounded in breach of contract and detailed the construction defects for which each subcontractor was allegedly responsible, alleging that the residence had flooded and leaked repeatedly in 1989, 1990, and subsequent years during periods of heavy rainfall.
On February 10, 1997, Epperson amended its complaint to include express and implied indemnity claims against each third-party defendant. Epperson demanded a jury trial on all counts. Thereafter, third-party defendant Georgi sought dismissal on the grounds that the third-party action was time-barred under
“It is with great regret that this letter is written. In 1988, Epperson Construction built a house for Milton and Donna Guzman ***. Since that time, the owners have alleged that some of the work on the house was not quality work or done in a workmanlike manner. They have also alleged that some of the materials used in the construction were
not ‘new’ materials. Many of the alleged ‘defects’ are nothing more than homeowner maintenance items. We have tried to resolve these issues since 1990, but the owners refuse to cooperate. We have offered to do any and all work to take care of issues that relate to building the house (not maintenance) or a monetary settlement. These efforts were to no avail. The Guzman‘s [sic] have sued our company.
Some of the issues in the lawsuit relate to work done by your company. We have no alternative but to involve your company in the resolution of this matter. Hopefully, you understand that this was the last resort. We hope that all of the parties involved will combine forces to work together to dispel this frivolous lawsuit.”
According to Georgi, the letter established that Epperson had known about the various problems at the Guzman home at least by 1990. Georgi contended that
In response, Epperson argued that it had not suffered an “injury” until the Guzmans filed suit against it in April 1996 or, at the earliest, when the Guzmans originally sued Epperson in September 1992. Epperson also noted that
The circuit court granted Georgi‘s motion, finding that the Epperson letter established that Epperson knew
After Georgi successfully obtained dismissal of Epperson‘s claims on the basis of the statute of limitations, both Hardesty and Hadden moved, pursuant to
As noted previously, the appellate court reversed the dismissal orders of the circuit court. The appellate court held that
ANALYSIS
The matter comes to this court upon the circuit court‘s granting of (i) three motions to dismiss pursuant to
We begin our analysis by first noting that the appellate court erred in holding that no particular statute of limitations applied to Epperson‘s claims before 1995. At the time the Guzmans filed their original underlying complaint against Epperson in 1992, Illinois courts had held that the statute of limitations set out in
“Actions based upon tort, contract or otherwise against any person for an act or omission of such person in the design, planning, supervision, observation or management of construction, or construction of an improvement to real property shall be commenced within 4 years from the time the person bringing an action, or his or her privity, knew or should reasonably have known of such act or omission.”
735 ILCS 5/13-214(a) (West 1992) .
Although there was a consensus of opinion as to which statute of limitations controlled the third-party construction actions, the courts were split as to when the four-year limitation period was triggered. Some courts held the view that, because of the nature of derivative liability, the trigger date had to be when the third-party plaintiff became aware of the potentiality for liability in the underlying action, i.e., the date of the filing of the underlying complaint (see Hartford, 158 Ill. App. 3d at 520-21) or the date of service of the underlying complaint (see La Salle, 177 Ill. App. 3d at 471). Other courts, however, questioned whether the statute of limitations is triggered automatically by the filing of the underlying complaint. In Elsa Benson, Inc. v. Kalman Floor Co., 191 Ill. App. 3d 1016 (1989), the appellate court concluded that the running of the statute of limitations commences when the injured person becomes “‘possessed of sufficient information concerning his injury and its cause to put a reasonable person on inquiry to determine whether actionable conduct is involved.‘” Benson, 191 Ill. App. 3d at 1022, quoting Knox College v. Celotex Corp., 88 Ill. 2d 407, 416 (1981). Likewise, the appellate court in Board of Library Directors v. Skidmore, Owings & Merrill, 215 Ill. App. 3d 69 (1991), held that the third-party plaintiff had four years from the date of learning of the defects in the construction. In that case, the underlying complaint had been
MJE, Hardesty, Hadden, and Georgi (collectively, the subcontractors) rely on cases such as Skidmore for the proposition that it is the date of the discovery of the wrongful act or omission which triggers the statute of limitations. They note that Epperson‘s letter demonstrates that Epperson knew of the defects in the construction of the Guzman home as early as 1990 and that Epperson should have filed suit against them within four years of that discovery. Epperson counters that the result of such a rule would be that a third-party claim can expire at or prior to the time the underlying plaintiff files suit, thus denying a defendant an opportunity to pursue third-party claims against those who are responsible for the plaintiff‘s claimed losses.
Although the subcontractors’ arguments are not without some appeal, we believe that they must be rejected due to the nature of third-party actions. A third-party action is a procedural device by which a defendant may assert a cause of action against a party that was not joined in the original action. See 3 R. Michael, Illinois Practice § 25.5 (1989). Such actions require that the party seeking relief assert a claim of derivative liability; therefore, the majority of third-party complaints are based on claims for indemnification or contribution. See 3 R. Michael, Illinois Practice § 25.5 (1989). As our appellate court has aptly noted in Anixter Brothers, Inc. v. Central Steel & Wire Co., 123 Ill. App. 3d 947, 953 (1984):
“Under Illinois law, a defendant entitled to bring an implied contract of indemnity action has a choice of filing a third-party complaint against a party who may be liable to indemnify him as part of the original action (Ill. Rev. Stat.
1983, ch. 110, par. 2-406(b)), or of waiting until the original action is over and filing a separate action for indemnity if he is found liable. In effect, Illinois law allows the third-party indemnity claim to be filed before it accrues, in order to promote settlement of all claims in one action. The third-party claim cannot be determined, however, before the underlying claim establishing liability and damages is determined. It follows that the cause of action for an implied contract of indemnity does not accrue until the defendant has a judgment entered against him or until he settles the claim made against him. Only at that point does the cause of action for indemnity accrue and the statute of limitations begin to run.”
If we were to adopt the rationale of Skidmore, we would potentially be requiring that third-party actions be filed before the underlying complaint was even filed. Indeed, that is precisely what the court in Skidmore held—that the third party complaint should have been filed before the underlying action was even brought. This approach has been criticized. As the appellate court noted in the present case, the rationale would compel parties who might need third-party relief to file “numerous anticipatory claims well before they are sued, even if such litigation might later be unnecessary because the original plaintiff does not sue.” 309 Ill. App. 3d at 660. See also Washington Courte Condominium Ass‘n-Four v. Washington-Golf Corp., 267 Ill. App. 3d 790, 848 (1994) (Buckley, J., concurring in part & dissenting in part). We agree with these observations. The purpose behind a statute of limitations is to prevent stale claims, not to preclude claims before they are ripe for adjudication. Because the analysis utilized in cases such as Skidmore has the potential to require third-party actions to be filed before the underlying complaint was even filed, we do not find it persuasive. Instead, we believe that the better reasoning was that espoused by the court in La Salle, which held that the statute of limitations in such cases
Our determination in this matter is further strengthened by the General Assembly‘s amendment to
“(b) In instances where an underlying action has been filed by a claimant, no action for contribution or indemnity may be commenced more than 2 years after the party seeking contribution or indemnity has been served with process in the underlying action or more than 2 years from the time the party, or his or her privy, knew or should reasonably have known of an act or omission giving rise to the action for contribution or indemnity, whichever period expires later.
(c) The applicable limitations period contained in subsection *** (b) shall apply to all actions for contribution or indemnity and shall preempt, as to contribution and indemnity actions only, all other statutes of limitation or repose, [including those applicable to the underlying action.]
(d) The provisions of this Section, as amended by Public Act 88-538, shall be applied retroactively when substantively applicable, including all pending actions without regard to when the cause of action accrued; provided, however, that this amendatory Act of 1994 shall not operate to affect statutory limitations or repose rights of any party which have fully vested prior to its effective date.” (Emphasis added.) See
735 ILCS 5/13-204 (West 1996) .
The amendment provisions indicate that the trigger date for filing a third party action is the date of service or of knowledge of the wrongful action or omission, whichever is later. The amendment therefore prevents a third-party action from being time-barred before the underlying action has been filed.
In this case, Epperson was served with the underly
In light of the above, it must be determined whether Epperson had a reasonable period of time, after the amendment of
CONCLUSION
In light of the foregoing, the judgment of the appellate court is vacated, the judgment of the circuit court is reversed, and the matter is remanded to the circuit court for proceedings consistent with this opinion.
Appellate court judgment vacated; circuit court judgment reversed; cause remanded.
CHIEF JUSTICE HARRISON, specially concurring:
I agree that Epperson‘s third-party claims are not untimely under
Had Epperson advanced its indemnity claims in the original action prior to its dismissal, the third-party defendants could have challenged the timeliness of those claims, and the reasonableness inquiry called for by my
As my colleagues’ recitation of the facts indicates, that did not happen. When the Guzmans voluntarily dismissed their original complaint in March of 1996, Epperson had not yet asserted its indemnity claims. The circuit court therefore had no occasion to rule on the timeliness of those claims before allowing the Guzmans to take their voluntary dismissal without prejudice. Because the court made no such ruling, there was nothing to bar Epperson from asserting its indemnity claims when the Guzmans refiled their action.
Whether or not Epperson delayed too long in asserting its indemnity claims in the original proceeding, that delay cannot be transferred to the second action. The refiled complaint was not a continuation or reinstatement of the prior action. It commenced an entirely new and separate proceeding. Dubina v. Mesirow Realty Development, Inc., 178 Ill. 2d 496, 504 (1997). Whatever obligation Epperson had to assert its indemnity claims in the first proceeding ended when that proceeding ended. Dismissal of the underlying complaint eliminated Epperson‘s potential liability, and without the prospect of liability, it had no grounds for seeking indemnification. Any claim it might have asserted for indemnification up to that point became moot.
JUSTICE THOMAS joins in this special concurrence.