Grice v. Vermont Electric Power Company, Inc. (2006-352 & 2006-510)
[Filed 16-May-2008]
NOTICE: This opinion is subject to motions for reargument under V.R.A.P. 40 as well as formal revision before publication in the Vermont Reports. Readers are requested to notify the Reporter of Decisions, Vermont Supreme Court,
109 State Street, Montpelier, Vermont05609-0801 of any errors in order that corrections may be made before this opinion goes to press.
|
|
|
Nos. 2006-352 & 2006-510 |
|
Harley Grice, Individually and as Trustee of the |
Supreme Court |
|
Harley Grice Trust, Wendy Butler, Penny Curler |
|
|
and Heather Grice |
On Appeal from |
|
|
Addison Superior Court |
|
v.
|
|
|
Vermont Electric Power Company, Inc.
|
|
|
In re Petition of Vermont Electric Power Company, Inc.
|
On Appeal from Public Service Board
November Term, 2007
|
Matthew I. Katz, J. (06-352)
David C. Coen and John D. Burke, Board Members (06-510)
James A. Dumont of Law Office of James A. Dumont, PC, Bristol, for Appellants Grice,
et al. (06-510 & 06-352).
Kimberly K. Hayden of Downs Rachlin Martin PLLC, St.Johnsbury, and Joslyn L. Wilschek of
Primmer Piper Eggleston & Cramer PC, Montpelier, for Cross-Appellants/Appellees Vermont
Electric Power Company, Inc. and Vermont Transco, LLC (06-510 & 06-352).
James H. Porter, III, Montpelier, for Appellee Department of Public Service (06-510).
William H. Sorrell, Attorney General, and Bridget C. Asay, Assistant Attorney General,
Montpelier, for IntervenorState of Vermont, Office of the Attorney General (06-510 &
06-352).
David L. Grayck and Evan J. Mulholland of Cheney, Brock & Saudek, P.C., Montpelier, for
Amicus Curiae The Meach Cove Real Estate Trust (06-510).
PRESENT: Reiber, C.J., Skoglund and Burgess, JJ., and Gibson J. (Ret.), and Eaton, D.J.,
Specially Assigned
¶ 1. REIBER, C.J. These two related appeals involve a petition by the Vermont Electric Power Company (VELCO) to condemn an easement for an electrical-transmission line across the property of landowners, Harley Grice, individually and as Trustee of the Harley Grice Trust, Wendy Butler, Penny Curler and Heather Grice (the Grices). The Public Service Board granted VELCO’s petition to condemn a strip of the Grice property, but denied VELCO’s request to install excess fiber-optic capacity along the corridor. Concurrent to the Board proceedings, the Grices filed a declaratory action in superior court challenging the Board’s statutory and constitutional authority to condemn their property. The court concluded that the Board had constitutional and statutory authority. The Grices appeal both the Board’s condemnation order and the superior court’s judgment. VELCO cross-appeals from the Board’s order denying its request to add excess fiber-optic capacity to its transmission line. We affirm the superior court decision and the Board’s condemnation order, but amend the Board’s order to allow VELCO to install the requested fiber-optic capacity.
¶ 2.
The procedural history and facts of the case are briefly as
follows. VELCO initiated a plan to increase the capacity of the
electrical grid in Vermont
by installing along a thirty-five-mile corridor a 345 kilovolt (kV) electrical
line as part of the Northwest Reliability Project (NRP). VELCO petitioned
the Board for a certificate of public good (CPG) and in January 2005, the Board
concluded that the NRP was necessary for the reliability of the electrical
system in Vermont
and issued a CPG. See 30 V.S.A. § 248(a) (requiring an electric company
to obtain approval from the Board that a project “will promote the general
good” before beginning to construct a new transmission facility). Several
parties challenged the Board’s decision to grant a CPG, and, on appeal, this
Court affirmed. In re Vt. Elec. Power Co., 2006
VT 69, 179 Vt.
370,
¶ 3. Following the Board’s issuance of the CPG, VELCO attempted to negotiate with the landowners along the proposed corridor, including the Grices, to obtain the necessary easements. VELCO already has a 150-foot-wide easement across the Grices’ land where an 115kV electric line is installed. In September 2005, after VELCO failed to reach an agreement with the Grices, VELCO petitioned the Board to condemn a 100-foot-wide strip of the Grice property, about a mile in length that would run parallel to the existing lower-voltage easement. VELCO asked for permission to remove so-called “danger trees” outside of the easement and for access to the easement at all points in the case of an emergency. As part of its proposal, VELCO also planned to install an optical ground wire (OPGW) cable across the easement with seventy-two optical fibers to transmit data, and video and voice communication. VELCO explained that the OPGW cable would be used for internal communication and was necessary to insure reliability of the line, but acknowledged that it did not need all seventy-two fibers for internal communication. VELCO planned to trade any excess capacity to other communication service providers in return for use of their capacity in other parts of the state where VELCO does not have optical fibers and must pay for their use.
¶ 4. The hearing officer granted VELCO’s request for condemnation, and for unlimited access to the easement. The officer concluded that it was necessary for VELCO to be able to reach the easement to remove trees or restore power in the case of an emergency. The hearing officer denied VELCO’s request to install excess capacity in the OPGW, concluding that this was not necessary for VELCO’s business of providing electrical services, and therefore VELCO could not condemn the property for such a purpose.
¶ 5. On appeal, the Board adopted the hearing officer’s findings, affirmed the hearing officer’s conclusion that the easement was necessary, and granted VELCO condemnation of the easement. The Board also granted VELCO unlimited access to the easement, concluding that it was necessary to maintain reliability of the line in emergency situations. The Board assessed damages for the Grices at $25,000. In response to VELCO’s request to install excess capacity in the OPGW, the Board concluded that VELCO was not authorized to sell, lease or exchange excess capacity. In a subsequent order clarifying this conclusion, the Board specified that VELCO was not authorized to install all seventy-two fibers because VELCO only needed twenty-four fibers to insure the reliability of the line. The Board reasoned that if VELCO could buy capacity from other providers in other parts of the state then it was not necessary to have excess capacity to trade.
¶ 6. While the Board action was pending, the Grices also filed an action for declaratory judgment in Addison Superior Court, challenging VELCO’s statutory and constitutional authority to condemn their land in a proceeding before the Board. The Grices argued that the Board’s assertion of jurisdiction violated its authorizing statute, was preempted by federal law and violated the Vermont Constitution because the energy running through the transmission lines would be regulated by federal, not state, law. The superior court dismissed the complaint, concluding that the condemnation action did not violate any statute or the Vermont Constitution, and was not preempted by federal law. The Grices appealed. The Grices also appealed the Board’s decision, challenging the Board’s authority to adjudicate the condemnation action. VELCO filed a cross-appeal, arguing that the Board erred in not granting it the right to install excess fiber-optic capacity along the easement. We consolidated the appeals from the Board and the superior court.
¶ 7.
We review de novo the superior court’s decision interpreting the statute
and the Vermont Constitution. Wright v. Bradley,
I.
¶ 8. We first address the Grices’ claims in their direct appeal. In three related claims, the Grices argue that the Board had no authority to grant VELCO’s condemnation request because the condemnation action: (1) is contrary to the Board’s statutory mandate, (2) is preempted by federal law, and (3) violates Article 2 of the Vermont Constitution. The Grices also contend that if the Board did have authority to adjudicate the condemnation action, the Board erroneously granted VELCO overly broad access to the property. Finally, the Grices request attorney’s fees and expert witness costs. We consider these claims in turn.
A.
¶ 9.
The Grices’ main argument on appeal is that
the resulting 345kV line will be regulated by federal law, not state law, and
it is beyond the Board’s authority to condemn property for a use that it will
not regulate. In particular, the Grices argue
that the Board does not have statutory authority to grant condemnation unless
the Board will directly regulate the resulting use. In assessing the Grices’ claim, we begin by examining the language of the
Board’s authorizing statute. See In re Verizon New England,
necessary in order that the [utility] may render adequate service to the public in the conduct of the business which it is authorized to conduct, and in conducting which it will, according to the laws of this state, be under an obligation to serve the public on reasonable terms, and pursuant to the regulations of the board.
Id. § 112.
¶ 10. The
Board made the required necessity determinations in this case. First, the
Board generally concluded that the NRP is in the public interest and necessary
for the reliability of the electrical system in Vermont when it granted VELCO a CPG for the
project. In re Vt. Elec. Power Co.,
¶ 11. On appeal, the Grices do not challenge the Board’s necessity determinations; rather, the Grices’ arguments rest on the language in the latter part of § 112 that requires a petitioning company’s business to be “according to the laws of this state, [and] be under an obligation to serve the public on reasonable terms, and pursuant to the regulations of the board.” 30 V.S.A. § 112. The Grices interpret this requirement as authorizing the Board to adjudicate condemnation proceedings only in cases where the energy passing through the lines will be directly regulated by the Board. VELCO is an electrical-transmission company that transports power from other states into Vermont and sells it wholesale to the retail companies who in turn sell the power to individual consumers. Because VELCO’s lines are part of an interconnected interstate grid, the power moving through them is regulated by federal law. The Grices reason that because the power from the new transmission line will not be regulated directly by the Board, but by federal regulations, the Board does not have authority to condemn their property.
¶ 12. We
conclude that the Board properly exercised its authority to conduct
condemnation proceedings in this case. The Board interpreted the
statute’s directive that a condemning company’s business must be conducted
“pursuant to the regulations of the board,” 30 V.S.A. § 112, as follows: “The
most reasonable construction of this requirement is not that the Board has
actually adopted regulations that apply to a particular company, rather that
the company, by law, is subject to such regulations as the Board may
adopt.” We agree with the Board’s analysis, especially given our
deference to the Board’s interpretation of statutes within its area of
expertise. See In re Verizon New England,
¶ 13. The Grices’ assertion that the statute is satisfied only if the
Board directly regulates the energy passing through the lines is an overly
narrow interpretation and at odds with the overall “reason and spirit” of the
law. Wright,
¶ 14. Furthermore, the Grices’ interpretation of the statutory language is at odds with the overall statutory scheme. Under the Grices’ interpretation of the statute, the Board can entertain condemnation actions only if it then actively regulates every aspect of the resulting use. If this is true, then at no time would the Board have jurisdiction to adjudicate condemnation actions for the wholesale transmission of energy because, as discussed below, this energy is regulated by federal law. The statute, however, envisions transmission companies, as well as energy retailers, using the power of eminent domain for the construction of transmission lines to the benefit of the public. See id. § 2802. As the Board explained, if transmission companies condemn property, “§ 2802 requires these companies to sell and furnish electricity to the extent that the Board determines that this would be required by ‘the public convenience or necessity.’ “ We agree with the Board’s interpretation of the statute and conclude that the statute authorizes condemnation in this case.
¶ 15. Next,
we consider whether federal law preempts the Board’s authority to adjudicate
this condemnation action. Federal law can preempt state law pursuant to
the Supremacy Clause, U.S. Const. art. VI, cl. 2. In re Vt.Ry.,
¶ 16. The Grices argue both forms of implicit preemption and first
submit that the Federal Energy Regulatory Commission (FERC) has exclusive
jurisdiction in the area of electrical transmissions and thus federal law
preempts state authority in the entire field. The Grices
claim that FERC’s jurisdiction over interstate
wholesale electric transmission is “plenary” and “exclusive.” See Dynegy,
¶ 17. The Grices also argue that FERC regulations requiring open access of transmission lines conflict with and therefore preempt state law. In 1996, FERC promulgated Order No. 888 entitled, “Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities.” 61 Fed. Reg. 21,540 (May 10, 1996). The rule mandates that all public utilities, which own, control or operate facilities used for transmitting electric energy in interstate commerce, must file open-access nondiscriminatory transmission tariffs. VELCO is a provider of electricity transmission and pursuant to these regulations, has already filed a tariff with FERC. Because FERC regulates the terms and conditions of the sale and transmission of wholesale energy in the 345kV line, the Grices argue that federal law preempts state control of VELCO’s transmission.
¶ 18. The Board concluded that, notwithstanding federal control over rates for the sale of interstate-transmission services, open access to the VELCO transmission system and the reliability of interstate-transmission service, these elements of specific control did not conflict with the Board’s responsibility under Vermont law to control electrical facility siting. We agree. Electricity in almost the entire continental United States is integrated in a grid system. Thus, no individual electrical provider or transmitter can guarantee that the electricity produced in its plant or transmitted across its lines will be directed to a particular consumer or group of consumers or be limited for distribution to a discrete geographic area. New York, 535 U.S. at 31-32 (Thomas, J., dissenting and concurring). While we acknowledge federal authority to govern this interstate electrical-transmission grid, we conclude that Order No. 888 does not conflict with, but preserves, state jurisdiction over the power to exercise eminent domain to site transmission lines. FERC Order No. 888 states that it does not affect state authority “over local service issues, including reliability of local service.” 61 Fed. Reg. at 21,626 n.544. The rule further explains that “Congress left to the States authority to regulate generation and transmission siting.” Id.at 21,626 n.543. The electricity that moves across state lines is regulated by the federal government, but the transmission lines and their supporting structures remain in Vermont and are subject to state control. See 30 V.S.A. § 2 (granting the Department of Public Service supervision over “[s]iting of electric generation and transmission facilities”). There is no conflict between VELCO’s obligation under its FERC tariff to provide nondiscriminatory access for the free-flowing transmission of electricity across its transmission lines and the Board’s authority to approve the necessity and siting of those lines. Thus, we conclude that federal law does not preempt the Board’s exercise of jurisdiction in this case.
¶ 19. In a
related argument, the Grices claim that condemnation
of their land violates their rights under the Vermont Constitution. The Grices rely on Tyler v. Beacher,
¶ 20. We conclude that the Board did not violate the Vermont Constitution in granting VELCO condemnation of the Grice property for construction of the 345kV line. The Constitution allows appropriation of private land when necessary for public use. Vt. Const. ch. I, art. 2. As explained in Tyler, to fit this standard the use must benefit the public and be subject to some state control. We do not read Tyler as requiring the public use to be specifically regulated by state enactment in every aspect of its operation to permit exercise of the power of eminent domain.
¶ 21. This
interpretation is consistent with our previous statements defining public
use. Following Tyler,
we explained that public use “appears from the character of the business, and
it is safely guarded for the obligation to serve all on equal and reasonable
terms, facilities, and accommodations.” Rutland Ry.,
Light & Power Co. v. Clarendon Power Co.,
¶ 22. The Grices argue that VELCO’s
transmission services do not directly benefit individual Vermonters and do not
benefit all citizens, and that therefore the transmission is not a public
use. In defining a public use, we have explained: “It is not necessary to
a public use that the whole public, or any considerable portion of it,
participate in it. The use may be, and frequently is, limited to a small
locality, and yet be public in a constitutional sense.” Deerfield
River Co. v. Wilmington Power & Paper Co.,
B.
¶ 23. We next address the Grices’ contention that the Board’s order is flawed because it does not particularly describe the routes VELCO is authorized to use to access the easement. According to the Grices, their entire 319-acre farm is burdened in perpetuity without a proper finding of necessity and without payment of compensation because VELCO has the right to access the easement strip at any location. The Grices request that the order be remanded for the Board to describe, condemn and order compensation for specific access routes to the easement. We conclude that the Board adequately described VELCO’s rights to access the easement to remove trees and to respond to emergencies.
¶ 24. In a
petition for condemnation, a public utility corporation must “describ[e] the property or right” it wishes to
condemn. 30 V.S.A. § 111(a). Generally,
the interest in land, including the principal right-of-way in the case of an
easement, “must be described with certainty and accuracy.” Vt. Elec. Power Co. v. Anderson,
¶ 25. VELCO’s proposed easement included a clause granting VELCO the right to enter the Grices’ property to cut or trim trees outside the easement area if those trees interfered with the easement area. The proposed easement also granted VELCO the right to enter and cross the Grice property to access the easement without permission in the event of an emergency, but specified that VELCO was responsible for any damage caused by such intrusion. The Grices complained that these clauses were overly broad and instead sought to identify specific access points to the easement. The Board rejected the use of specific access points as impracticable. The Board concluded that the right to enter and cross the Grice property is “critical to all of VELCO’s maintenance activities, including structure maintenance, pole testing, tree trimming, brush control, line inspection, and any other work requiring VELCO to access the right of way.” The Board found that it was necessary for VELCO to access the land without the landowner’s permission to “maintain the reliability and safety of the line.”
¶ 26. The
Board’s finding of necessity is not clearly erroneous. See In re Vt.
Elec. Power Co., Inc.,
¶ 27. Finally,
we are not persuaded by the Grices’ contention that
VELCO must, as part of the condemnation proceeding, identify and compensate
them for any land that will be used as an access route or any tree that will be
removed. In support, the Grices cite Arkansas
Power & Light Co. v. Potlatch Forest, Inc., wherein the Arkansas
Supreme Court held that an electric company had to specifically describe and
condemn trees endangering transmission lines and the access routes to the
easement.
C.
¶ 28. Finally, we address the Grices’ request for attorney’s fees and expert-witness costs. The Grices claim they are entitled to attorney’s fees because the condemnation action contravenes their constitutional protection that “every person ought to obtain right and justice, freely, and without being obliged to purchase it.” Vt. Const. ch. I, art. 4.* According to the Grices, VELCO’s litigation compelled them to “purchase” justice because they had to defend against the condemnation proceeding. The Grices also argue that equity requires an award. We conclude that there is no basis either in law or in equity to award the Grices attorney’s fees or expert-witness costs in this case.
¶ 29. We
adhere to the American rule that each party is responsible for its own
attorney’s fees absent an agreement or a statute authorizing a fee award.
Monahan v. GMAC Mortgage Corp.,
¶ 30. Similarly,
there is no constitutional basis to award fees. The right to justice
secured by Article 4 is violated if a party is precluded from seeking review of
a decision in court. In re Stoddard,
II.
¶ 31. VELCO’s cross-appeal concerns whether it has authority to install excess fiber-optic capacity along the easement. The Board concluded that VELCO needed only twenty-four fiber-optic wires to insure the reliability of the new 345kV line and prohibited VELCO from installing any excess fibers or from trading excess capacity. VELCO argues that the additional fibers are collectively so small that they will not additionally burden the Grices’ land and therefore are not a taking. In the alternative, VELCO submits that a seventy-two-wire fiber-optic line is reasonably necessary for the reliable operation of the electrical-transmission system in the state and should be allowed. We conclude that the seventy-two-wire fiber-optic line may be installed as incidental to and consistent with the primary use of providing a reliable electrical-transmission network.
¶ 32. In its condemnation petition, VELCO sought an easement that would allow it to install excess fiber-optic capacity along the 345kV corridor. The Board denied VELCO’s request, explaining that VELCO could not use its condemnation authority to take the Grices’ property for the purpose of installing telecommunications capacity beyond that necessary for VELCO to provide adequate service. VELCO also argued that the excess capacity was necessary because it would be used to trade and obtain the use of fiber-optic lines in areas of the state where VELCO does not have any capacity and this use was necessary for the maintenance of those other lines. In response, the Board concluded that VELCO could simply purchase lease rights from those companies and therefore trading was not necessary. In its clarification decision, the Board unambiguously concluded that VELCO was authorized to install only twenty-four of the requested seventy-two fibers and could not trade any excess capacity.
¶ 33. We conclude that the Board’s interpretation of the statute’s requirements is overly strict. The Board’s interpretation essentially requires VELCO to demonstrate that every aspect of its plan meets the public necessity and use requirements specific to the improvements implemented at the precise location of the condemned property. We are not persuaded that the statute or the Constitution require this result.
¶ 34. As
explained above, the Vermont Constitution limits the appropriation of private
land to those instances where the property will be used for a public
purpose. This does not mean, however, that the condemning authority must
demonstrate how each detail of the project is necessary to serve the public use
when those uses are incidental to the public project. Under our
public-utility condemnation law, the power to condemn is not invalidated even
if an incidental nonpublic purpose may also result from the taking, as long as
the substantial and primary purpose remains intact and the incidental benefit
“is a mere sequence” of the action. Lucia v. Vill. of Montpelier, 60 Vt.
537, 545,
¶ 35. In this case, we similarly conclude that VELCO’s primary purpose of installing the OPGW is a public use because it is necessary for maintenance of the line, and the incidental benefit of having excess capacity to lease or trade does not invalidate the public use. Although we do not disagree with the Board’s finding that the excess lines are not necessary for VELCO’s maintenance of its electrical grid because the capacity in other parts of the state could be purchased, there is also no evidence to contradict VELCO’s assertion that its purpose in acquiring the excess capacity is to trade for capacity in other areas where VELCO does not have fiber-optic wires. As VELCO explains, the communications capacity it derives will be used to further its public purpose of providing reliable electrical service throughout the state. This incidental benefit derives from and does not interfere with the public use of the line. Thus, the benefit VELCO will accrue from this increased capacity is incidental to and consistent with the line’s primary purpose of providing increased capacity and reliability to the electrical-transmission network in the state.
¶ 36. We
caution that the doctrine of incidental benefit as it applies to these facts is
not a blanket authorization for a condemning authority under our public-utility
law to use its power of eminent domain to improperly serve private
interests. The benefit is not incidental if the power of eminent domain
is “perverted to wrongful ends or diverted to wrongful uses.” Id.; see Courchesne
v. Town of Weathersfield,
¶ 37. Having concluded that the seventy-two fiber-optic wire is de minimis and may be installed as incidental to the primary purpose of the condemnation action, we do not address VELCO’s additional arguments supporting its installation.
The superior court’s judgment is affirmed; the Public Service Board’s condemnation order is affirmed, but the order is amended to allow VELCO to install seventy-two fiber-optic wires and to trade excess capacity.
|
|
|
FOR THE COURT: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Chief Justice |
* The Grices also cite Articles 7 and 9 of the Vermont
Constitution, but do not explain how these provisions entitle them to
attorney’s fees; therefore, we do not address these arguments. See Craven
v. McCrillis,