401 Pa. 434 | Pa. | 1960
Opinion by
In a trespass action for personal injuries the court below, upon the plaintiff’s motion and after a jury-verdict against one defendant and in favor of the two other defendants, granted a new trial as to all three defendants and refused a motion for judgment n.o.v. filed by the defendant who had lost the verdict. This action of the court below is the basis of these three appeals.
On August 25, 1952, Sigmund Yalir owned a three-story building located at 5850 Ellsworth Avenue, Pittsburgh, a building which, at that time and during a seven year period prior thereto, was under lease to the 7-Up Bottling Company [herein called Bottling Company]. In February 1952, Yahr had entered into a contract with Harold S. Sauers, trading as Real Estate Maintenance Company [herein called Maintenance Company] to paint certain window frames on the exterior of the building and, pursuant to this contract, Albert Greco [plaintiff] and John Pappas, Maintenance Company employees, were at the time of accident — August 25, 1952 — engaged in performing this work. At the time of accident Greco and Paplias were placing a thirty-six foot extension ladder against the sill of a window located on the third floor of the building, this window being approximately twenty-five feet above the surface of the ground. The ladder consisted of two eighteen-foot sections and, in order to reach this third floor window, it was necessary that one section be extended seven or eight feet above the other section. In so doing, Pappas held the
Greco instituted a trespass action in the Court of Common Pleas of Allegheny County against Yahr and the Bottling Company and Yahr then joined the Maintenance Company as an additional defendant. At trial the jury returned a verdict of $15,000 in favor of Greco and against Yahr as well as verdicts against Yahr and in favor of the Bottling Company and the Maintenance Company. As to all three defendants the court below granted a new trial and refused Yalir’s motion for judgment n.o.v. From these orders the present appeals were taken.
Yahr takes the position that he is entitled to judgment n.o.v. inasmuch as there was insufficient evidence upon which the jury could find that he, the owner out of possession of the premises, was guilty of any negligence. The Bottling Company contends: (1) that since Yahr, the building owner, without its knowledge arranged to have the Maintenance Company paint the exterior woodwork of the building, it, the tenant in possession, would not be liable to Greco, an employee of the independent painting contractor, by reason of any latent defective condition of the window frame; (2) that, inasmuch as the Bottling Company’s liability was submitted under proper instructions to the jury and inasmuch as the jury absolved
The opinion of the court below set forth its rationale for the grant of a new trial: (1) the verdict of $15,000 was inadequate; (2) the absence on two or three occasions of Greco’s chief trial counsel because of an engagement in the Federal court deprived Greco of the legal advice and counsel to which he was entitled; (3) the jury’s verdict exculpating the Bottling Company was against the charge of the court and the evidence.
In considering these appeals the scope of our appellate review varies. Upon Yahr’s appeal from the refusal of the court below to grant his motion for judgment n.o.v., the testimony must be read in the light most favorable to Greco, all conflicts therein must be resolved in his favor and he must be given the benefit of all facts and reasonable inferences therefrom deducible: Kuhns v. Brugger, 390 Pa. 331, 335, 135 A. 2d 395. However, in considering the appeals from the grant of a new trial, this rule does not apply (Sherman v. Manufacturers Light & Heat Company, 389 Pa. 61, 68 (footnote), 132 A. 2d 255 and cases therein collected).
Greco v. Yahr
Yahr, the building owner, technically had been out of possession of this property for approximately seven and a quarter years. The Bottling Company’s possession arose by virtue of two leases, the first whereof
Yahr’s duty was to warn business visitors or invitees of defects which were either known to him or which were discoverable by a reasonable inspection on his part.
In the present situation, the rotted condition of the window frame could not have been discovered by a visual inspection; the condition could have been readily discovered by manual tapping on the frame whereby both tactilely and aurally its condition would be established. Under the instant circumstances, was Yahr exercising reasonable care and diligence in not making this or some other type of inspection? There is no evidence whatsoever that Yahr at any time inspected the condition of the window frames either from within or without the building. This was an old building which had been owned by Yahr for eight years prior to the date of accident and the window frames, particularly by reason of the manner of construction of this particular window frame, were continually exposed to the elements. Granted that a visual or superficial examination of this window frame would not have revealed its defective condition, it was for the jury to decide under these particular circumstances whether such visual or superficial inspection was all that was required of Yahr. Whether Yahr’s conduct or failure to inspect met the standard of reasonable care and diligence was a matter for the jury: Blasi v. Bonnert, 186 Pa. Superior Ct. 179, 142 A. 2d 752. Whether Yahr fulfilled his duty of maintaining the exterior of the building in a reasonably safe condition for the protection and safety of such invitees and business visitors as the Maintenance Company and its employees, and whether Yahr in failing to make more than a visual inspection, had exercised the care which a reasonable and prudent person would have exercised were matters peculiarly within the province of the jury to determine. As the Superior Court
Under the instant factual situation we cannot state as a matter of law that Yahr’s conduct met the applicable standard of reasonable care and diligence, nor that Yahr in fulfillment of his duty could rely simply on a visual inspection of the frames. The court below properly refused Yahr’s motion for judgment n.o.v. To have done otherwise would have amounted to an invasion of the province of the jury.
Lastly, Yahr argues that Greco was guilty of contributory negligence as a matter of law. Contributory negligence should not be declared to exist as a matter of law unless such negligence is so clearly revealed that reasonable individuals cannot disagree as to its existence: Mazi v. McAnlis, 365 Pa. 114, 119, 74 A. 2d 108; Schofield v. Druschel, 359 Pa. 630, 635, 59 A. 2d 919. Certainly the evidence in this record does not justify a declaration as a matter of law that Greco -was contributorily negligent and the court below very properly submitted to the jury the question of contributory negligence.
Section 343 of the Restatement, Torts provides: “Section 343. Dangerous conditions known to or discoverable by possessor. A possessor of land is subject to liability for bodily harm caused to business visitors by a natural or artificial condition thereon if, but only if, he (a) knows, or by the exercise of reasonable care could discover, the condition which, if known to him, he should realize as involving an unreasonable risk to them, and (b) has no reason to believe that they will discover the condition or realize the risk involved therein, and (c) invites or permits them to enter or remain upon the land without exercising reasonable care (i) to make the condition reasonably safe, or (ii) to give a warning adequate to enable them to avoid the harm without relinquishing any of the services which they are entitled to receive, if the possessor is a public utility.” (Emphasis supplied)
The court below justified the grant of a new trial as to the Bottling Company on the ground that an “invitation” or a “permission” to enter upon the premises could be implied from the fact that the Bottling Company’s secretary-treasurer, on Monday, August 25, 1952, noticed that'one side of the building had been painted and, therefore, she could have ascertained that the other side of the building was then being painted had she made inquiry. The court below said: “. . . [Greco] was invited upon the premises by the owner of the premises, Yahr, without knowledge of the tenant, 7-Up Bottling Company) and had the tenant remained away during the performance of the painting and repair work, we would be compelled to sustain the 7-Up verdict, or if a verdict was rendered against it, to grant judgment n.o.v. But we believe that when Miss Dorothy Tucker, Secretary-
It was Yahr, not the Bottling Company, who contracted for the services of the Maintenance Company and expressly invited the Maintenance Company and its employees to enter upon the premises. No notice whatsoever of such invitation and permission granted by Yahr was given to the Bottling Company. The original entry upon the premises having been at the invitation and permission of Yahr, unless it can be shown that the Bottling Company had notice that the Maintenance Company and its employees were on the premises and that the Bottling Company acquiesced in their presence on the premises no liability can attach to the Bottling Company in the instant factual situation. From knowledge acquired by one of its officers that the building on one side had been painted and that someone had entered upon the premises for that purpose, Greco urges that the Bottling Company should either have become aware that the other side of the building was then being painted or it should have searched the premises to ascertain whether it was then being painted. Under the circumstances the Bottling Company was under no obligation to search the premises for the purpose of ascertaining the presence of the Maintenance Company’s employees.
Super v. West Penn Power Company, 392 Pa. 159, 140 A. 2d 20 and Stark v. Lehigh Foundaries, Inc., 388 Pa. 1, 130 A. 2d 123, illustrate the necessity that an owner or occupier of land have knowledge of the presence on its premises of business visitors, or in
“Plaintiff had the burden of proving either that the Power Company knew or that it should have known of the placement of wires and cross-arms on its poles by the Construction and Telephone Companies. A review of the record indicates that there is no proof in this respect. The fact that the work had progressed over a two week period without objection from the Power Company does not, in the absence of any proof that the Power Company either knew or should
The evidence on this record fails to show the extension by the Bottling Company to the Maintenance Company and its employees, expressly or by implication, of an invitation or grant of permission to enter upon its premises. In the absence of such proof, liability cannot be fastened upon the Bottling Company in this situation.
Even though we deem the evidence insufficient to justify a finding that the Bottling Company had invited or permitted the Maintenance Company and its employees to enter upon the premises, the fact is that the court below did submit to the jury under proper and adequate instructions the question of the Bottling Company’s liability and the jury returned a verdict in favor of the Bottling Company. We find no justification on this record to support a finding that such verdict was against either the evidence or the charge of the court. Furthermore, inadequacy of the verdict rendered against Yahr furnishes no ground for the granting of a new trial as to the Bottling Company. The court below in granting a new trial as against the Bottling Company abused its discretion.
We have carefully reviewed the instant record to ascertain the presence or absence of proof of negligent conduct on the part of the Maintenance Company. The Maintenance Company had no notice actual or constructive, of the latent defective condition of this window frame. A visual inspection did not and could not have revealed the rotted condition of the frame; no further method of inspection was required of the Maintenance Company under the circumstances. Furthermore, there was no proof that the ladder itself was in any manner defective or that the failure to equip the ladder with pulleys or ropes to extend the sections thereof was either improper or in any way contributed to the happening of this accident. In the absence of proof of any such negligent conduct, it is difficult to understand why the court below permitted the jury to pass on the question of the Maintenance Company’s negligence. Having permitted the jury to pass upon this question was error; to grant a new trial after the jury absolved the Maintenance Company from liability was to compound the error.
While the verdict may have been inadequate against Yalir, such inadequacy furnished no ground for the grant of a new trial as against the Maintenance Company. In a trespass action against two defendants, the fact that a jury returns a verdict inadequate in amount against one defendant and a verdict in favor of the other defendant, such inadequacy of verdict against the former does not, in itself, constitute a valid ground for the grant of a new trial as to the other defendant: Fitzpatrick v. Sheppard, 346 Pa. 240, 242, 29 A. 2d 475. In Fitzpatrick we said: “Did the court exceed its legal powers in granting the new trial as to Dr. McCombs? We think it did. The
The ground assigned by the court below for the grant of a new trial as to Yahr was the inadequacy of the f15,000 verdict. In Takac v. Bamford, 370 Pa. 389, 395, 88 A. 2d 86, Mr. Justice (now Chief Justice) Jones stated: “The grant or refusal of a new trial for inadequacy of the verdict is a matter for the sound discretion of the trial court whose action will not be reversed on appeal except for a clear abuse of discretion such as where a new trial is refused when the verdict is so unreasonably low as to present a clear case of injustice.” See also: Paustenbaugh v. Ward Baking Company, 374 Pa. 418, 420, 421, 97 A. 2d 816; Carpenelli v. Scranton Bus Company, 350 Pa. 184, 187, 38 A. 2d 44; Elza v. Chovan, 396 Pa. 112, 114, 152 A. 2d 238. On the posture of the present record, considering the extent of the medical expenses, the loss of earnings and the severity and probable permanency of injury, we cannot say that the court below grossly abused its discretion in finding inadequate the amount of the verdict, and, in the absence of such abuse of discretion, the action of the court below must stand.
One other matter must be considered because the court below assigned it as a ground for the grant of a new trial, believing that it contributed to the inadequacy of the verdict. On several occasions during the trial [which lasted from September 16 to September
The order of the court below in granting a new trial as to Yahr (Appeal No. 9 March Term 1960) is affirmed and the orders of the court below granting a new trial as to the Bottling Company and the Maintenance Company (Appeals Nos. 14 and 22 March Term 1960) are reversed and judgment directed to be entered on the verdicts in favor of the Bottling Company and the Maintenance Company and against Greco.
Described as the “left-hand side of the window frame”, five and one-half feet in length, four to fire inches in width and three-quarters inch in thickness.
Yahr had submitted to a Pittsburgh bank an application for an increase in a mortgage loan and the bank had notified him, in writing, that, before such application could be considered, certain repairs, including the painting of the exterior woodwork of the building, had to be made.
The specifications provided that the Maintenance Company would remove all old or scarred paint by wire brushing or scraping, putty all cracks and nail-holes, replace all window sashes
In view of Yahr’s assumption of control of tlie exterior of the building evidenced by the contract with the Maintenance Company, Yahr cannot well take the position that he was an “owner out of possession” so far as the exterior of the building is concerned.