The Kelley Island Lime & Transport' Company, the owner of the steam barge Ohio, filed its libel in the court below charging the respondents, the Great Lakes Towing Company and the city of Cleveland, with having by negligence caused the Ohio to come into collision with a pier of a drawbridge over the Cuyahoga river, a navigable stream running through the city into Lake Erie: The river coming down and passing under the bridge (called in the record the “Middle Seneca Street Bridge”), and,going on 220 feet fur-! ther, makes a sharp turn to the ieft around a point called the “Knuckle,” opposite to which the river spreads out into a bay.' On being'
The 25th rule of the regulations prescribed by the Act of February 8, 1895, c. 64, 28 Stat. 649 (U. S. Comp. St. 1901, p. 2891), i-eads as follows:
“In all channels less than five hundred feet in width no steam vessel shall pass another going in the same direction unless the steam vessel ahead be disabled or signify her willingness that the steam vessel astern shall pass, when the steam vessel astern may pass, subject, however, to the other rules applicable to such a situation.”
By the third section of rule 28 authoi-itjr is given to the Board of Supervising Inspectors to establish fui-ther regulations not inconsistent with the act. Among the rules prescribed by the board under this authority are the following:'
“Hule 6. When steamers are running in the same direction, and the pilot of a steamer which is astern shall desire to pass on the right or starboard side-of the steamer ahead, he shall give one short blast of the whistle, as a signal of such desire and intention and shall put his helm aport; or if he shall desire to pass on the left or port side of the -steamer ahead, he shall give two short blasts of the whistle as a signal of such desire and intention, and shall put his helm to starboard, and the pilot of the steamer ahead shall an-*495 swor l>y the same signals: or, if he does not think it safe for the steamer astern to attempt to pass at that point, he shall immediately signify the same by giving several short and rapid blasts of the whistle, and under no circumstances shall ihe steamer astern attempt to pass the steamer ahead until such time as they have reached a point where it can be safely done, when said steamer ahead shall signify her willingness by blowing the proper signals. The boat ahead shall in no case attempt to cross the bow or crowd upon the course of the passing steamer.”
‘‘Rule 22. Notwithstanding anything contained in these rules every vessel overtaking any other shall keep out of the way of the overtaken vessel.”
“Rule 21. Every steam vessel which is directed by these rules to keep out of the way of another vessel shall, on approaching her, if necessary, slacken her Sliced or stop or reverse.”
Here was a palpable violation of both the statutory and the supervising inspectors’ rules. And having regard to the narrow space between the Ohio and the docks through which the Lutz must run and the character of the other vessel and the control she had of herself, the negligence of the Lutz seems wanton. The Ohio was lawfully navigating the river. She was a clumsy craft, but none the less entitled to the protection given her by the rules. The need of a strict regard of them was obvious to the Lutz. She was not only bound to get the consent of the Ohio, but in these circumstances she was bound to slacken her speed to a degree which would enable her to pass the Ohio safely. Instead of this, without even a warning, she pressed into the narrow space and went by her at full speed. There is much conflict in the testimony as to what her speed was, but it leaves no doubt that it was much greater than prudent navigation would permit. The result was what might have been anticipated. The current set up by the displacement of the water on her bow crowded over against the forward starboard of the Ohio, and at the same time the falling back of the water in her wake would suck the after part of the Ohio toward the path through which the Lutz had passed. The Ohio was moving forward. And thus by natural causes, she sheered off to the place of collision. These influences would have a peculiar effect upon the Ohio because of her shallow draft. If she had had a keel down in deep water her movement would not have been so much affected. We therefore concur with the District Court in holding that the liability of the Lutz is clearly established. That being so, and the conduct of the Lutz being of itself sufficient to have caused the disaster, the tow-age company must make a clear case of fault against the Ohio before it can charge the latter with any part of the consequences. But there is no ground on which to rest an imputation of fault on the part of the Ohio.
But a more serious question arises in the controversy about the liability of the city. And upon this it is necessary to state some further facts. The Seneca Street Bridge had been standing for many years. We have already described the foundation of the pier on which it swung was built, and particularly the submerged projections of its octagonal timbers. For the purpose of shielding the pier from external injury or for the purpose of preventing vessels from colliding with it, or perhaps for both purposes, for it would serve both, the city had long before driven a line of piles a few feet distant from the pier
As to, the first ground, we think the position of the city cannot be sustained. Laying aside for the present the circumstance that the city retained the control of the execution of the contract to the extent that it might have interfered to prevent the removal of the piles until the dangerous structure behind them had been removed, the question remains whether it can absolve itself by employing some one else to do the work upon a stipulation that the employe, whether he be a servant or a contractor, shall observe and perform the duty of the city. In other words, is it.an-.absolute duty or one which may be delegated? We think the city cannot contract itself out of its duty.
By section 2640, Rev. St. Ohio 1890, the duties of municipalities in the state are prescribed as follows
“The council shall have the care, supervision and control of all public highways,-streets, avenues, alteys, sidewalks, public grounds and bridges within the corporation, and shall cause the same to be kept open and in repair, and free -from nuisance.”’,.
We are also of the opinion that the contention which the city makes that the removal of these piles was a cause of the injury too remote to subject her to liability, cannot be sustained. It is trire that the removal of the piles had already taken place, and that the accident might not have taken place but for wrongful conduct of the tug. But it is also true that if the piles had not been removed the injury to the Ohio would probably have been much less severe. They had the capacity of springs and would cushion the blow. And it is also to be observed that the negligence of the city did not cease to be operative upon the removal of the piles. It was a continuing negligence which would become effective whenever the chance of accident should occur. The negligence of the city and that of the tug were therefore coincident and co-operative, and not remote and proximate, causes of the injury; and in such case both the parties at fault are liable for the consequences. The result is that the owners of the Eutz and the city should be held jointly liable, and each be required to pay one-half of the damages. The decree should go against them jpintly, but if one is compelled to pay more than one-half it should be accorded the right of contribution of the excess from the other.
The other question is whether the court below was right in allowing interest on the damages. The court allowed interest from the date of its interlocutory decree, which was February 5, 1906, down to the entry of the final decree; and the libelant insists that interest should be allowed from the date of the injury. The general rule of law, or practice rather, is to allow interest in cases where the amount of damages is uncertain and is matter for proof, from the date when they were liquidated — that is, fixed by judicial ascertainment — which in this case would be the date of filing the commissioner’s report. The date of filing the interlocutory- opinion was a year earlier than that. Thus the libelant was allowed a year’s interest more than the rate above stated would allow. But the rule is not a fixed one, and is subject to variation by the circumstances. Its application rests in the discretion of the jury, or of the court where it stands in the place of'the jury, and the exercise of this discretion will not be reviewed unless it has been palpably abused. The facts of this case are such as to show that the action of the court was not inequitable. The case had been a long time pending, and many of the large items of damages were for definite amounts of expenditure which are not now disputed either in their amount or necessity. The fixing of the date of the interlocutory opinion was, in a large sense, somewhat compensatory for these considerations, and was not an abuse of discretion. This objection must therefore be overruled.
The decree of the court below, in so far as respects the liability of the Great Lakes Towing Company and the city of Cleveland for the damages suffered by the Ohio, should be reversed and, instead thereof, it is directed that a decree be entered in favor of the libelant and against both of the defendants last mentioned in the terms indicated in the foregoing opinion, jointly and severally with a provision that, if either should be compelled to pay more than a moiety of the sum adjudged against both, it may have execution for the excess. The decree of the court below will in other respects be affirmed. The costs in respect to the controversy concerning the liability of the two defendants respectively will be paid to the libelant by the city of Cleveland. The costs incurred by the libelant in the controversy concerning the matter of complaint set up in the cross-appeal will be paid by the Great Lakes Towing Company. ■