69 Mo. App. 574 | Mo. Ct. App. | 1897
The defendant operates a railroad in Newton county. The plaintiff is the owner of four acres of land situated within the corporate limits of the city of' Neosho. The land is bounded on the North by McKinney street, on the south by Park street, and on the east by the railroad. Extending south from the land is a small valley through which the railroad is constructed. The natural flow of the water at that point is from south to north or northeast into Hickory street. In September, 1895, the plaintiff’s land was overflowed by surface water coming from this valley, destroying his crops and washing away the fences and some of the soil. The plaintiff claims that the overflow was caused by the failure of the defendant to comply with, the following statute: “It shall be the duty of every corporation, company, or person owning or operating any railroad or branch thereof in this state, and of any corporation, company, or person constructing any railroad in this state, within three months after the completion of the same through any county in this state, to cause to bo constructed and maintained suitable ditches and drains along each side of the roadbed of such railroad, to connect with ditches, drains, or water courses, so as to afford sufficient outlet to drain and carry off the water along such railroad whenever the draining of such water has been obstructed or rendered necessary by the construction of such railroad. * * * and any corporation, company, or person failing to comply with the provisions of this section shall incur a penalty not to exceed five hundred dollars, and be liable for all damages done by said neglect of duty.” R. S. 1889, sec. 2614. The italics are ours. The cause of action as stated in the petition is as follows:
“That prior to the construction of said railroad, said land was not subject to overflow. That defendant in constructing and maintaining its said railroad,*577 raised the embankment thereof above the surfaee of plaintiff’s said land, thereby obstructing the flow of the surface water along the same, causing the same to flow over the said lot. That said defendant negligently, unlawfully,and wrongfully failed to construct,keep open and maintain suitable ditches and drains along the side of its said road where it passes along the side of said lot of plaintiff as aforesaid, so as to afford sufficient outlet to drain and carry off the water along said railroad where the same had been rendered necessary by ■ the construction of said railroad as aforesaid.
That in consequence of the neglect and failure of defendant in failing to keep open and maintain suitable ditches and drains along the side of its said railroad where it runs along the said lot of plaintiff, the surface water in the year 1895 accumulated and collected on the west side of said road, and overflowed plaintiff’s said lot, thereby washing away and destroying one thousand feet of paling fence, and one chicken shed and four hundred feet of post, board and wire fence, ten bushels of potatoes, five bushels of rye; and thereby overflowing and destroying 'one acre of clover, one half acre of corn, and further destroying and washing away the top soil of one acre of land, thereby rendering it valueless for garden puiposes,” etc.
The answer is a-general denial. It also sets forth that the overflow complained of was the result of an unusual and extraordinary rainstorm; that the railroad was owned by the Philadelphia Construction Company, and that the defendant was placed in possession by the owner merely for the purpose of operating the road, and for no other purpose, except to make such repairs as were incident only to its operation. It was unnecessary to plead these facts, for if they afford a defense, they could be shown under a general denial.
The court gave the following instruction as to the measure of damages:
“You are instructed that in estimating plaintiff’s damages, you will allow him for rye, potatoes, and vegetables if wholly destroyed, the value of the amount destroyed on the ground, and in determining the damage to the land, you will allow such sum as equals the difference of the value of the land immediately before and after the overflow caused by the same in removing therefrom the fence and chicken house and soil, if any was so removed.”
The allegation of negligence in the petition is-that the defendant failed to construct and maintain ditches through the plaintiff’s land. This averment is sustained by the proof only in a measure. It appears-that there is a ditch on the east side of plaintiff’s land from a point about eight feet from its south line- and extending in a northerly direction to McKinney street, where it intersects another ditch. Park street is the southern boundry of plaintiff’s land, and this, street crosses the railroad track on a fill. The defendant failed to construct lateral ditches south of this-street and a culvert through the embankment so as to afford a passageway for the water coming from the south, thereby forcing the water to go to the west and over the street onto plaintiff’s premises. We would suggest an amendment to the petition, so as to conform to the true facts of the case.
For the errors suggested the judgment will be reversed and the cause remanded.