165 Mo. 211 | Mo. | 1901
This is an action in ejectment to recover a strip of land, through which is a railroad, which at the commencement of this suit was in the possession of and operated by defendant.
The land is embraced in a right of way granted by the plaintiffs to the St. Louis & Kirkwood Railroad Company, upon which that company constructed its railroad, and which at the commencement of this suit was in the possession and usé of the defendant as lessee under the plaintiffs’ grantee, but pending the suit the lease has expired, and the Kirkwood company has resumed its possession and is operating the road.
The right of way granted was through land of plaintiffs in or near Kirkwood, and the plaintiffs ground their right of recovery on the proposition that the grant was on conditions subsequent, which have been broken by the grantee, and for the breaches plaintiffs have in due form declared the forfeiture and demanded possession.
The case-turns chiefly on the construction that should be placed on the deed granting the right of way. That deed is as follows:
“Contract for right of way entered into between Laura B. Gratz and Anderson Gratz her husband, of the town of Kirk-wood, St. Louis county, Missouri, parties of the first part, and the Kirkwood & St. Louis Railroad Company, a corporation*215 of 'the State of Missouri, party of tie second part.
“Witnesseth: For and in consideration of one dollar in hand paid, the receipt of which is hereby acknowledged, the parties of the first part hereby sell and transfer to the party of the second part, its assigns apd successors, subject however to the faithful performance of the terms of this agreement, the right to build, maintain and operate a railway over and through a certain tract of land [description] ; said right of way to be so used as not to interfere with the remaining rights of the first parties to use the property, whether as a street or for .other purposes. No trees are to be cut on said right of way unless said trees interfere with the construction or operation of said road. Natural drains to be preserved by ample culverts, bridges or trestles except that in the westerly half of said property, the party of the second part may direct the creek into ditches not to be confined to the right of way. All surplus earth, if any, to be deposited at any point designated by first party within three hundred feet of a place of excavation; proper cattle guards to be constructed, by second party at each entrance to property. Proper level and planked crossings to be constructed by second party at two points to be designated by first party. No construction camps or other nuisance to be allowed on the right of way and no crossing or trespassing to be allowed on any other part of the property. Entire right of way to be maintained by second party in a clean and decent condition free from all nuisances. The party of the second part agrees that in case a street or streets should be dedicated including the right of way, they will operate and maintain this section of their railroad in the way provided and subject to all the conditions of the ordinance of the town of Kirkwood, granting them the right of way through the streets of said town, upon condition, however, that the grantee herein, its successors and assigns, shall construct and maintain a single or double track of railroad to be operated by electricity for motive power or by such other approved power as may be adopted by the*216 grantee or assigns, and upon the failure or abandonment of said enterprise by the grantee herein or its successors or assigns, the privilege herein and the property hereby conveyed shall revert to and be fully vested in the grantors, their legal representatives or assigns, and conditioned also that the construction of such road be fully completed and such road be in operation in or before the year 1896.”
The cause was tried by the court, jury waived. There was evidence on the part of the plaintiffs tending to show that the railroad as constructed impaired the use of the strip as a street; that no cattle guard was constructed; that although the plaintiffs designated two crossings, yet the railroad company made only one, and that one not planked or made level; that the rails were laid on ties above the surface as in ordinary steam railroads; that at the crossing which the railroad company did construct, the roadbed was graded so that it was necessary in passing over it to go up and down a considerable embankment; that at the other place designated by plaintiffs for a crossing, not only was no crossing made, but a switch with high guard rails was put in, which rendered it impracticable for a crossing, and plaintiffs were compelled to make another road to town from their property. The railroad was constructed within the time specified in the deed, and is in continuous operation. This strip is midway between the main termini of the road and that part of the railroad on this strip is' necessary to the operation of the road. At the close of the plaintiffs’ case, defendant interposed a demurrer to the evidence. The court took the case under advisement, and subsequently rendered a finding for defendant on the issues joined, and a judgment accordingly. Plaintiffs appeal.
The trial court, in a memorandum of its findings and opinion, said that the railroad company had failed “to construct cattle guards, and also failed to construct and plank over certain crossings and for these failures and omissions the plaintiffs claim a forfeiture and the right of possession of said right
The learned discussion in the briefs before us on this appeal is directed chiefly to the second proposition in the above quotation, that is, that ejectment will not lie against a railroad corporation in such case for a breach of a condition subsequent. But if the learned trial judge was correct in his first proposition, that is, that the contract in question “does not provide for- a forfeiture on account of these omissions,” the case is disposed of before we reach the second proposition. .
Where the terms of a contract are left open to construction, and the question is, do they amount to a condition subsequent or to a covenant, the inclination should be to hold it a covenant. A condition that works a forfeiture is not favored and the law will not presume that it was intended if the terms used can as reasonably be construed to mean a covenant. [4 Kent Com. (14 Ed.) pp. 129, 132; Studdard v. Wells, 120 Mo. 29.]
It is the same principle which underlies the doctrine that a clause in a contract will not be construed as providing for forfeiture in the form of liquidated damages, when the consequence is out of proportion to the wrong suffered and a just estimate of compensation can be reasonably made. In construing the contract we must say what the parties really intended by the language used, and the language must be understood to have been used in reference particularly to the subject
A grant may be on a condition subsequent when no express words of condition are used, and the intent may be gathered from the whole instrument. [Tiedeman on Real Prop. (2 Ed.), sec. 272; 2 Washb. Real Prop. (5 Ed.), sec. 2; Chapin v. School Dist., 35 N. H. 445; Gray v. Blanchard, 8 Pick. 291.] But the intent to create a condition under which the estate granted may be forfeited must be very clear.
It is argued for appellants that this was a voluntary conveyance, that even the nominal consideration of one ¿ollar was shown by the evidence not to have been paid and never expected by either party to be paid, and, therefore, the performance of the conditions was the only consideration to support the contract. But the argument is not convincing. The only consideration named as such was one dollar, which the parties showed by their conduct did not enter into their calculations at all; there' was something else not named that moved the plaintiffs to make the grant. What was it? Counsel argue that
Appellants construe the terms “sell and transfer.... subject however to the faithful performance,” etc., to mean, sell and transfer upon condition that the terms of the agreement be performed. If we were held to a strict grammatical construction we might find it difficult to class the words “subject to” in their relation to the rest of the sentence. But, syntax aside, it will not be too critical to say that those words in the connection in which they are employed in this contract are not as apt as the words “upon condition” would have been if
That the parties to this contract did not understand the words above discussed as meaning that the performance of the various acts specified in that connection were conditions subsequent, for the non-performance of which the estate granted would be forfeited, is also shown by the fact that further down in the contract it is in express terms declared that the grant is “upon condition,” that certain other acts shall be done within a period specified and if not done within that time “the privilege herein and the property hereby conveyed shall revert to and be fully vested in the grantors.” Those acts were strictly performed. That shows that the parties were mindful of what they were doing and knew the difference between a covenant to perform collateral acts and a condition subsequent on which the grant depended.
The 'trial court was right in its construction of the contract, and its judgment is affirmed.