149 Mo. App. 306 | Mo. Ct. App. | 1910
Action for damages caused by defendant digging a ditch along its right of way, collecting water therein and discharging it in a body upon the premises of plaintiff. Trial by jury, verdict for plaintiff for two
The evidence shows that in June, 1906, plaintiff purchased land adjoining and on the north side of the right of way of defendant and sought to operate a tile factory thereon, using clay procured from this land for the purpose of manufacturing tile. That the general drainage of the land was toward the north and west; that there was a trestle or bridge in defendant’s road opposite the property of plaintiff through which a little water came. Just west of the ground of plaintiff there had been an opening under the grade of the railroad for the purpose of letting surface water through and the water which passed through this opening was the surface water collected upon a large tract of land. This opening had become partially filled and at times the track of defendant had overflowed at this point, but had not overflowed opposite plaintiff’s land. To remedy this condition defendant constructed a ditch upon the south side of its track from the point where this partially filled opening was to the trestle which was opposite plaintiff’s land, and turned the water which accumulated upon that side of the road under their track and on to plaintiff’s land. As a result of this, plaintiff’s ground was overflowed, sediment was deposited upon it and his clay pits partially filled with this sediment and he was unable to operate his factory during the months of April, May and June, 1907, and part of the time in July and up to August 21st of that year. The evidence on the part of plaintiff showed the capacity of the plant for manufacturing tile; that he had ready market for all he could manufacture, and the price at which it could be sold.
The first contention of appellant is that a demurrer to plaintiff’s testimony should have been sustained for
The common law rule which is in force in this State is that surface water is a common enemy against which each landowner may guard in his own way, and he will not be responsible for damages to his neighbor by reason of the fact that, in improving his own land, if he does it in a proper manner, surface water may thereby be turned upon his neighbor; but this general rule has its limitations, one of which is that a party cannot collect surface water upon his own premises and discharge it in a body upon the land of his neighbor to his injury. [Paddock v. Somes, 102 Mo. 226, 14 S. W. 746; Ready v. Mo. Pac. Ry. Co., 98 Mo. App. 467, 73 S. W. 142; Lewis v. City of Springfield, 125 S. W. 824.] In this case the construction of this ditch and the accumulation of water thereby was not a mere incident to the improvement of defendant’s property so as to bring it within the rule in Drew v. The Railroad, 129 Mo. App. 465, 107 S. W. 478, and Thompson v. Railroad, 136 Mo. App. 404, 117 S. W. 1193, and other like cases; but this ditch was constructed for the express purpose of collecting the water which had previously been overflowing defendant’s track and conveying it to a point where it could be let through under the track without constructing a new opening for that purpose. This brings this case clearly within the rule announced in Paddock v. Somes, supra, and other cases of like character. It follows that the demurrer to pláintiff’s testimony was properly overruled.
The instruction given on behalf of plaintiff of which complaint is made, submitted to the jury the question as to whether defendant had collected surface wnter in a large body and discharged it upon plaintiff’s premises to his injury, and further instructed them that if plaintiff had a ready market for all the' tiling which
It is contended that this instruction was wrong as to the measure of damages. When one party wrongfully inflicts injury upon another the measure of damages should be so gauged as to compensate as nearly as possible the party injured for the loss actually suffered, and in a given case, the inquiry of damages should be so directed as to ascertain as nearly as possible what in that case was the loss suffered by reason of the wrongful act complained of and the recovery should be limited to that amount. When the operation of an established business has been interrupted the measure of damages is, usually, the loss of profits that would have accrued had there been no interruption of the business. This is the correct measure of damages provided the expenses stop while the business, is stopped; but if the situation of the party injured is such that his expenses continue while the business is stopped then the party should recover this expense in addition to the loss of profits, for if the business is paying a profit then the business while going pays the expenses, but when the business is stopped, the party not only loses the usual profits of the business, hut must take money from his pocket and pay the" expenses which the business would have paid had it not been interrupted. [Morrow v. Railroad, 123 S. W. 1034; Viernow v. City of Carthage, 139 Mo. App. 276.]
In this case the plaintiff alleged in his petition 'the loss of profits,, and further alleged special damages by reason of being put to great expense in removing the
The instruction given on behalf of plaintiff seems to have been grounded upon the theory that plaintiff was entitled to recover the full value of the product which he could have manufactured during the time his plant was idle without taking into account anything that had been saved to him by reason of the fact that his plant was not operated; as for example, the amount of clay he would have consumed, and the amount of fuel which it would have been necessary to consume in burning the tile, and any other expenses that may have been saved to him by reason of the fact that his plant was not operated. This instruction was erroneous.
It is also contended that section 1110, Revised Statutes 1899, makes it the duty of defendant to construct ditches along its right of way, and for that reason it wag only obeying the mandates of the statute in constructing this ditch. The statute in question has no application whatever to a case of this'character. The purpose of that statute is to require the railroad company to construct ditches and drains along each side of its roadbed to connect with ditches, drains or watercourses so as to afford sufficient outlet to drain and carry off the water along such railroad whenever the draining of such water has been obstructed or rendered necessary by the construction of such railroad, in order that the lands of parties adjoining the railroad may not be injured by the obstructions which the construction of the railroad may put in the way of the natural drainage of the water, and it would be a perversion of the statute to say that a company under its protection could accumulate surface water in a body and discharge it upon land adjoining its right of way to the injury of the owner of the land. Its purpose is to require the railroad company to so construct its road and drain it as to prevent injuring the landowner and it cannot be
For the error noted, the judgment will be reversed and the cause remanded.