60 So. 976 | Ala. Ct. App. | 1913
The case was submitted to the jury-on the second count of the plaintiff’s complaint, and resulted in a verdict in favor of the plaintiff for $900. The defendant moved for a new trial, and this motion was granted by the court, and this action of the court in setting aside the verdict and granting appellee a new trial is assigned as error.
The motion sets forth many grounds as reasons for setting aside the verdict and granting a new trial; but counsel for appellant and appellee both seem to agree on one thing, and but one thing, in their briefs filed, and that is that the real, substantial question presented to the court for review on this appeal is Avhether the court, in the trial of the case, proceeded and acted on the proper rule appertaining to the measure of recoverable damages, or departed in its rulings on the evidence and instructions to the jury in this particular, and committed error in permitting a recovery based on an improper measure of damages, under the allegations of the plaintiff’s complaint.
The second count of the complaint, as we read it (the reporter will set out this count), is not a claim for permanent injury to the realty directly and necessarily resulting from the construction of the sewer as an injurious construction, but a claim for the injurious consequences resulting from and ascribed to an overflow of water produced by the improper or negligent construction of a storm sewer or ditch, the construction of which did not, of itself, constitute a wrong affording a cause of action. The act complained of is not the construction of the sewer, but the harmful consequences subsequently resulting from it. The complaint predi
“In cases of damage by nuisance, it is considered that the injurious consequences resulting from the nuisance, rather than the act which produces the nuisance, is the cause of action, and hence it is held that the cause of action does not arise until harmful consequences occur, and damages are estimated to the time of bringing the suit; damages to occur subsequently, as the consequences of the continuance of the nuisance, being left for remedy by subsequent suits. — Polly v. McCall, 37 Ala. 20; Rountree v. Brantley, 34 Ala. 544 [73 Am. Dec. 470]; West Pratt Coal Co. v. Dorman [161 Ala. 389], 49 South. 849 [23 L. R. A. (N. S.) 805, 135 Am. St. Rep.
“If the thing complained of is not necessarily injurious, or is not the invasion of the rights of another, of itself affording no cause of action, then whatever of legal injury may result from it furnishes a cause of action accruing when the injury occurs.” — S., A. & M. Ry. v. Buford, 106 Ala. 303, 313, 17 South. 395, 398.
The case made by this count of the plaintiff’s complaint is not like the case cited by appellant, of Highland Ave. & Belt Ry. Co. v. Matthews et al., 99 Ala. 24, 10 South. 267, 14 L. R. A. 462, and similar cases, where the cause of action was to redress a wrong for the change in the grade of a street permanently impairing the value of the abutting land. In this class of cases the nuisance complained of is not abatable or remediable; and the construction complained of is necessarily injurious and the invasion of the rights of the landowner, and of itself affords a cause of action, without regard to the intervening cause. The cause of action in this class of cases arises as a natural and proximate result of the act complained of in changing the grade, which is a wrong within itself affording a cause of action, upon which the Avhole damage may be ascertained and recovered; and the proper measure of damages in such case is the decrease in actual value of the property occasioned by the construction thus made. But in the instant case the allegations of the complaint state a cause of action arising out of the injurious consequences resulting, not from the wrongful act of constructing the sewer as affording a cause of action, but from the subsequent injurious occurrences accruing therefrom; and it is these occurrences which, under the allegations of the complaint, furnish the cause of action, and the measure of damages is necessarily different; for each recurr
It is suggested by the appellant that the proof showed the construction complained of to be a conduit built of cement or concrete, some 3,000 feet in length, with a circular sewer space of 4 feet in diameter, constructed underground, and that such a structure is permanent. The allegations in the complaint should state the facts constituting the cause of action relied on.(Fid. & Deposit Co. of Md. v. Walker et al., 158 Ala. 129, 142, 48 South. 600), and it is not averred in the complaint that the structure is permanent; it is only described as “a ditch or storm sewer,” and the proof cannot be looked to for the purpose of strengthening the allegations of the complaint in determining the nature of the cause of action, any more than can damages for permanent injury be proved or recovered without appropriate allegations. “Proof without allegation is as impotent as is allegation without proof.” — A. G. S. R. R. Co. v. Cardwell, 171 Ala. 274, 55 South. 185; Capital Security Co. v. Holland, infra, 60 South. 495.
So far as the allegations of the complaint go, the action declared upon was for a nuisance abatable and remediable, and the plaintiff should not have been permitted, in this form of action, to recover for permanent depreciation in the market value of the premises. Even if it should be conceded that the work done on the sewer was of a permanent nature, yet “if a permanent work rightfully done by public authority is yet so negligently done as to cause continuing injury to the plaintiff, it is to be supposed that the negligence will be remedied; and the plaintiff can therefore recover only for loss to the date of his writ.” — 1 Sedgwick on Damages (8th Ed.), § 95, p. 133, citing, as approval of the text we have quot
The appellant contends that the appellee waived any exception taken to that part of the court’s oral charge instructing the jury with reference to the measure of damages, because after the exception had been taken, and the court had given further instructions in an explanatory charge, defendant’s counsel announced, “We are satisfied.” The bill of exceptions shows that the defendant excepted to two separate portions of the court’s oral charge, one part wherein the court instructed the jury that the measure of damages was the depreciation of the market value of the property, and the other portion objected to being that part of the charge in which the court instructed the jury that they might assess any damages to the property which they might find to ex-' tend into the future. The court, in an additional charge, corrected and explained this latter part of the oral charge to which an exception had been reserved, and upon the conclusion of this explanatory charge the announcement, “We are satisfied,” is shown to have been made and we think this remark of counsel had reference to that latter portion of the charge to which an exception had been separately reserved, and which the court had corrected and explained, and not to that part of the charge to which a separate exception had been previously reserved, in which the court had erroneously stated the rule in reference to the measure of damages
The order of the court setting aside the verdict of the jury, on the ground that it had erroneously instructed the jury on the measure of damages, and had admitted evidence in support of a finding of such improper and unauthorized damages, was properly made, and the case must be affirmed.
Affirmed.