193 N.W. 132 | S.D. | 1923
During the year 1907 a drainage district, designated as drainage district No. 1, was established in Minnehaha county for the purpose of draining land along the Big Sioux River. Such district extended’ from a point immediately north of the city of Sioux Falls, up the river for a distance of about 2^ miles. The river through this district runs in a southerly direction • until it reaches a point just north of the city of Sioux Falls.' It then continues in a southerly direction through or along the western part of the city, then sweeps to the east around the southern portion of the city to a point just north of the northern limits of the city, where it winds away to the east and south.
In 1908, a petition was filed with the county commissioners, asking that said drainage district be extended several miles farther up the river. Such action was had1 upon this petition that (quoting from the findings of the trial court) :
“Said petition was allowed, and a resolution adopted by the board of county commissioners, establishing said drainage and designating it as ‘drain ditch No. 2/ extending said original drain ditch No. 1 from the upper end of said original drain ditch No. 1 about 12 miles.”
A drain ditch 'was constructed up the valley throughout the entire length of said district as so enlarged. At the point where the said drain ditch emptied into the river, the bluff or bank of the river is about 100 feet in height. To prevent the water from the ditch from washing away the river bank or bluff, a concrete trough or spillway had been constructed to carry the water down the hill into the river. During an unusual freshet that occurred in 1915 or 1916, the said spillway, either because of accident or faulty construction, was washed out and destroyed. At about the same time the river cut through its bank into the drainage ditch at a point several miles above the said spillway. This permitted the1 water from the river, as well as all the surface water that gathered in the ditch, to run down through the ditch over the
It was necessary to take immediate steps to control the flow of the water and to retain the water of the river within its natural channel where it flows through and around the city of Sioux Falls. After drainage 'ditches No. I and No. 2 had been constructed, other drain ditches had been constructed farther up the river. The result of the construction of these ditches was to greatly accelerate the flow of water down the valley, and to increase the quantity of water running through the ditches. Because of this increase in the volume of the water, the capacity of these ditches was no longer sufficient to dispose of the surplus water as-they w.ere originally intended to do.
Plaintiff in this action is the owner of agricultural land within the drainage area of drainage district No. 2. The increase in the flow of the water from farther up the valley caused the overflow of plaintiff’s land-, from which substantial damage resulted-. To obviate the continuation or recurrence of such damage, plaintiff and others similarly situated held a meeting on the 1st * day of April, 1916, and took such action that on the 8th day of April, plaintiff and others who were affected by the condition of the water and of said drainage ditches filed a petition with the board of county commissioners, asking that said spillway be abandoned, and that the water flowing through said ditches be turned through a certain slough or lake in the northern part of the city of Sioux Falls, and thence into the channel of the river above where it flows around said city. A survey of said proposed plan was made, and, after notice to the interested parties, a hearing was had upon said petition and report of said survey. On the 8th day of July following, an order was made granting said1 petition. Thereafter many conferences were had by the plaintiff and the said petitioners and1 other interested parties,. with the result that the said petition and the said plan of drainage were abandoned. Thereupon a second petition was filed, asking for the re-establishment of drainage ditch No. 1 and 2, for the reconstruction of said spill
We do not understand that appellant questions the constitutionality of the law under which the said project was carried out. Pie claims that the requisite steps to. give the board jurisdiction to proceed were not taken, and that, therefore, to permit the board to levy an assessment on his property to pay for said work would be depriving him of his property without due process of law!. The filing of the petition, asking for the establishment of a new drainage ditch on- the 3d of August, 1916, gave the board jurisdiction to proceed with the inspection and survey of
It is contended by the appellant that the project contemplated by the petition was not the creation of a new drainage district or a new drainage ditch, but merely to repair a project already in operation, and that therefore the board was without authority to proceed. But this contention is not tenable. The Constitution (section 6, art. 21) and the statute (section 8458) gives the board the same authority to repair an old ditch that it ■does to construct a new one. But the two projects were by no. means identical. The drainage district involved in this ca-se contains a materially larger area than the combined area of the two old districts. Appellant -was present when the order creating the mew district was made. If he believed that such order was prejudicial to bis rights, or was dissatisfied for any reason with the •course pursued by the -board-, he should have appealed from said ■order, before the expense of executing the same -had been incurred.
Numerous irregularities on the part of the board are alleged, and it may. be assumed1 that the board did in certain instances •proceed in an irregular manner, but it is not shown that the board did, in .any instance, exceed the jurisdiction conferred upon it by law. It is claimed that on many occasions, various steps in the prosecution of the work were taken by the board, without first having made an order to that effect, from which plaintiff could have appealed. This may be true, but plaintiff was not without
The petition filed with the board on the 3d day of August, 1916, praying for the creation of drainage ditch No. 1 and 2, asked that the work be paid for 'by an assessment on the property to be benefited thereby. While plaintiff did not sign this petition, he was present at the hearing- thereon, and is presumed to have known that whatever was done in the way of constructing any drain ditches or repairing the old ones would have to be paid for by an assessment on the property that received the benefits. He saw the work in progress, and was advised of all that was done. All the irregularities complained of occurred after the 'board had acquired jurisdiction of the subject-matter. No- fraud or bad faith on the part of the board has been shown. Two years were allowed to elapse after the work was completed before this action was commenced. Appellant having stood by and seen all the work performed without protest, and- having received all the benefits that can result therefrom, should not now be permitted t'o escape payment for the same. The relief asked. by appellant is equitable in its nature, but because of the circumstances above-shown, all the equities of the case are against appellant and in favor of the board.
The judgment and order appealed from are afifirmed.
The drainage of agricultural lands is declared to be a public purpose, and the counties are granted power to construct levees, drains, and ditches. The -county is required to carry on the work. It is the policy of our statutory law to limit the powers of the board of county commissioners in- nearly every particular, and to hedge and curtail their powers. Under -section 5885 “contracts can be let only on competitive bids and the advertisement for bids must state where the plans and specifications may be examined.” This section applies to all contracts for fuel, stationery, and other articles for the use of the county, or labor to be performed, when the amount to be paid for the same during any year exceeds the sum of -$ioo.
Section 8465, C. L., provides that the county commissioners shall let contracts for the construction of the drainage, or for any portion thereof, which shall be let upon competitive bids. When any contract is let the contractor shall give a bond- in such sum as shall be approved by the board of county commissioners, conditioned for the faithful performance of his work. For the information of the contractors in bidding upon the proposed drainage, full plans and specifications shall be filed in the office of the county auditor. If, in the judgment of the board, the entire drainage can be constructed at less money than the amount of any bid submitted, the board may cause such drainage to be constructed, hire the necessary labor, and purchase the necessary material for such .construction without letting contract therefor.
■From! the above quotations it will be seen that the law requires plans and specifications for all public works, and that these plans and specifications .must be referred to for the purpose of giving information to those -wishing to bid on the same.
When the board of county -commissioners advertised for bids .for the construction of the spillway, they did so under the Stevens survey, but this record discloses that the Stevens plans were abandoned, and the county commissioners rejected all the bids received under the Stevens plans; that thereafter Francis C. Shenehan, an enginéer, was employed to prepare plans and specifications for the spillway, but these plans were changed from- time to- time as the work progressed, and -were never filed with the state engineer until about the time the work was completed. Such plans and specifications did not show the -character or extent of such improvement or the estimate -cost thereof. No advertisement was ever m-ade for bids under these plans. The county commissioners, then let a contract to the 'Sioux Falls -Construction 'Company for the construction of the present spillway on the -cost plus plan, allowing said company the total cost of all material, the cost of the labor, and the supervision of the construction work, and to furnish the necessary machinery, tools, and supplies to be used in said construction work, thus allowing said company the total cost
Our statute requires that plans and specifications must be provided for the use of the bidders, so as to disclose the specific thing to be undertaken, and thus to secure fair competition to all who may desire to compete, and such requirements are regarded as part of the law by necessary implication. There can be no Intelligent bidding unless all the bidders may know what the contract is. 22 R. C. L. 616.
These statutory provisions being mandatory, the county commissioners cannot evade them. The whole purpose of the statute is to secure economy in the construction of public wlorks, to protect the public from collusive contracts, favoritism, fraud, and' to promote actual, honest, and efficient competition in all contracts for public works. These provisions represent the public policy of the state, and ought not to be ignored. The statute does not say the public officer may advertise for bids, but it commands him to do so. It is not that he may, but that he must. All contracts entered into for the purpose of preventing competition in bidding for public works are contrary to public policy, and cannot be enforced.
It is not necessary to show the particlar effect of the contract if it is condemned by public policy. McMullen v. Hoffman, 174 U. S. 639, 19 Sup. Ct. 839, 43 L. Ed. 1117.
The law requires the letting- to the lowest bidder, and the rule is that plans and1 specifications must be provided for the use
The rule of law is so explicit-that proposals for bids for public work cannot fix the price to be paid for labor, where the statute requires all contracts for public work to be let to the lowest bidder. Frame v. Felix, 167 Pa. 47, 31 Atl. 375, 27 L. R. A. 802.
This cost plus system in the contracts relative to public works is the most ingenious subterfuge for extorting money from the. municipalities that has even been inaugurated by the ingenuity of man. It has no place in our law, because it violates every principle of public policy as annunciated by the statutory law of the state. This system enables a contractor to carry on an important public work without putting in any capital whatever, and the greater sum' he can pay for labor, and for material, the greater commission he gets. If he can make a spillway cost $300,000, his commission is $27,000, and he can hire his own superintendents and pay for them out of funds that may be accumulated for the purpose of paying for the construction work. The engineer in this case estimated the cost of the spillway to be $60,000 yet it will probably cost in excess of $200,000.
The cost plus contract is vicious; it eliminates all competitions; paves the way of graft and fraud. It places in the hands of the contractor unlimited powers to accomplish double dealings and duplicity. It allows the contractor to be buyer and seller; to be principal and agent. When he can pay double price for labor and material his own compensation is increased in the sarnie ratio. The more he can squander the greater his financial reward. If he can employ labor and buy material at five timtes ‘its actual cost, so much the better for him, because it increases his commission five times. He pays himself for the job of superintending his own work. This state ought not to depart from the system of requiring competitive bids on public works, where each party is treated with impartiality and equality in his bidding, for this iniquitous jack pot cost plus system which robs, steals, and plunders.
“The sepulcher of the centuries is filled with the bones of dead evils, slain by man in his climb toward God. You may build, build in your pride and pow'er as deep as the continent, build as high as the Himalayas, but if you build upon human
About ioo farmers are interested in the drainage ditches Nos. i and 2. These parties had completed' these ditches, and had paid their assessments. It was a completed and finished job, and they were enjoying the benefits of the drainage improvement. Then came the new scheme to extend the drainage plans by taking in new territory, including the city of Sioux Falls, its streets, parks, and alleys, and to reconstruct a new and expensive spillway, which has largely 'been completed wlith only 50 per cent of sufficiency to carry off the waters, and the making of a new survey, with levels, at a cost of $7,500. Let it be understood that this improvement is for drainage of agricultural lands, and' the benefits to be received must be sufficient to pay for the intended improvements. If the benefits are not sufficient then the whole scheme is a taking of properties without due process of law. This action is to enjoin the assessment for. alleged benefits on the whole system of improvements made on the new scheme from its' beginning. A careful examination of this record discloses no apparent benefits can be received by the railroads, parks, streets, and city properties.
I think that Judge Elliot’s decision in enjoining the assessment of benefits is right, and was in fact the only conclusion that could rationally be readied, because the relation of benefits of town properties could not, in any manner, be compared with any ratio of benefits that would accrue to the drainage of agricultural lands. This whole scheme evidently was brought about to protect the city’s water supply, the power plant, and the penitentiary grounds from endangering flood encroachments.
The city parks, streets, alleys, power plant, and the railroads have all been relieved from assessments by the action of the federal courts. How can there be any justification for assessing other property holders in the city and those interested in the original completed drainage of No. 1 and No. 2 ditches, and at the same time excuse those who have been diligent in preserving their rights by injunction? The surveys being enjoined by the federal courts is res ad judicata. These improvements are all being made with
It is said that the court is without remedy because appeals were not taken from the orders, but the acts complained of are ultra vires, illegal, and void. It is then said that the plaintiff is estopped. There can be no estoppel, unless there be substantial benefits accruing by reason of the construction of the ditches as a new project. The various elements of estoppel are wanting in this case. It will not do to say that they 'have stood by and seen the work going on. The complaint is, the mandatory provisions of the statute have not been complied with. Such ultra vires acts as disclosed by this record should be enjoined. 'Defects and irregularities that are not jurisdictional may, be cured by a new1 assessment under section 8506, (Compiled Laws.
Note — Reported in 193 N. W. 132. See American Key-Numbered Digest, (1) Drains, Key-No. 14(1), 19 C. J. Sec. 55;. (2) Drains, Key-No. 14(3), 19 C. ,T. Sec. 109; (3) Drains, Key-No. 14(3), 19 C. J. Sec. 119; (4) Drains, Key-No. 14(1), 19 C. J. Sec. 55; (5) Drains, Key-No. 91, 19 C. J. Sec. 262.
■On loss of right to contest assessment in drainage proceeding by ■waiver, estoppel, or the like, see notes in 58 L. R. A. 353; 6(0 L. R. A. 161, and 9 A. L. R. 842.
As- to what property is liable for assessment for construction of drains and sewers, see notes in 26 L. R. A. (N. S.) 973.