49 Ga. App. 788 | Ga. Ct. App. | 1934
Lead Opinion
This was an action brought by Mrs. Nannie Gillespie in the superior court of Barrow eountjr, seeking to recover damages for the death of her husband, Grady Gillespie, as a result of
It appears that during the early part of the fall of 1929, the Georgia Power Company entered into a contract with the Empire Construction Company whereby the Empire Construction Company agreed to rebuild the electric plant in Winder, Georgia, removing all old wires, poles, and cross-arms, and to erect a new system, putting up new poles, cross-arms, and new wires; that Grady Gillespie, the husband of Nannie Gillespie, was employed by the Empire Construction Company as a ground man or ground helper in the rebuilding of said electric system of the Georgia Power Company; that Grady Gillespie’s duties were to help put up poles, wait upon the other employees, and keep all of the dead wires out of the streets; that he was not employed to climb poles or work on said poles, or to handle live wires, and had worked in this capacity for at least six months. During said construction work, the Georgia Power Company continued to carry on its business of furnishing electric power and service to its customers. It further appears that primary electric lines which contained 2300 volts had been reconstructed on Broad street in the direction of the town of Jefferson as far as New street. Before Gillespie was killed, a primary line ran off Broad street down New street about two blocks to a transformer, where the transformer reduced it to a secondary electric line, which carried 110 to 220 volts, and then went on down New street as a secondary line to a dead end. Gillespie was killed on New street between Broad street and said transformer by half insulated wires which were cut on one end, the cut end falling to the ground. On the afternoon of the 16th of October, 1929, about one o’clock in the afternoon, certain crews of the Empire Construction Company were at work on the wires of the Georgia Power Company on Broad street in the city of Winder, and "one of the linemen cut two secondary wires that connected with the primary wires on Broad street,” and the said employee of the Empire Construction Company let the said wires which they cut fall in said Broad street while being heavily charged with an electric current. An agent of the Empire Construction Company (W. P. Cooley) told Grady Gillespie to move the wires which had been cut out of the street,
The Empire Construction Company, it seems to us, was an independent contractor, and, if we do not misconstrue the brief of the defendant in error, her attorneys are also of this opinion. It further appeared that “the entire method and means of doing the work in and around Winder was under the complete supervision and control of the independent contractor, Empire Construction Company, and the Georgia Power Company did not exercise any supervision or jurisdiction at all in the construction or reconstruction of said system. There was not any supervision of the Georgia Power Company or any official of the Georgia Power Company or any force of the Georgia Power Company with reference to the construction or rebuilding, or building of the Winder lay-out of the line and service. The Empire Construction Company pursued its own methods.” “The Georgia Power Company had nothing to do with the work or the carrying on of the work, or inspection of the work at the time it was being carried on by and under the independent contractor, the Empire Construction Company.” “When the job was done it was the job of the Empire Construction Company. The Empire Construction Company adopted the method of doing
The plaintiff in his petition alleged: “32. That the Empire Construction Company, the contractor of defendant, was negligent in having petitioner’s husband handle live and dangerous wires charged with 2300 volts of current. 33. That said Empire Construction Company was negligent in not notifying petitioner’s husband that said wires were so charged with 2300 volts. 34. That said Empire Construction Company knew, or could have found out that said wires were so charged. 35. That said Empire Construction Company was negligent in not furnishing petitioner’s husband with insulated gloves and equipment with which to handle live and deadly wires as it had him to handle on the date of his death. 36. That said Empire Construction Company was negligent in not having the current cut off before it had petitioner’s husband move said wires from the street at the time he was killed. 37. That said Empire Construction Company was negligent in not advising petitioner’s husband of the extreme danger of handling wire charged with 2300 volts of current; that said construction company knew that petitioner’s husband knew nothing of the handling of live wires, and that he was only a green farmer who had never done work of that nature before he went to work with them.” These paragraphs were afterwards stricken by amendment but were introduced in evidence by the defendant at the trial. The evidence further disclosed that the line which was cut would have been a dead line except for the fact that what had been a dead end had been connected with the line coming down Wright street, and that this connection was made by the employees of the Empire Construction Company on the morning of the day on which the plaintiff’s husband was killed. This fact was not known by the lineman who cut the wire nor by the
There is no difference of opinion among the members of this court as to the facts of this case as above stated. There is a wide difference of opinion as to the conclusion which is to be drawn from these facts. The general rule upon the subject of independent contractors has been stated by the Supreme Court as follows: “When an individual or corporation contracts with another individual or corporation exercising an independent employment, for the latter to do work not in itself unlawful or attended with danger to others, such work to be done according to the contractor’s own method and not subject to the employer’s control or orders except as to the result to be obtained, the employer is not liable for the wrong or negligent acts of the contractor or the contractor’s servants.” Ridgeway v. Downing Co., 109 Ga. 551, 559 (34 S. E. 1028. Section 4415 of the Civil Code (1910), which prescribes exceptions to this rule, was codified from the opinion of the Supreme Court in the case of Atlanta & Florida R. Co. v. Kimberly, 87 Ga. 161 (13 S. E. 277, 27 Am. St. R. 231). That was a suit against a railroad company because of the ponding of water, in which the railroad company defended upon the ground, among others, that the work was done by an independent contractor and that the ponding of the water was an act for which they were not liable. In discussing that case the court said: “It was argued by the able counsel for the defendant in error that the building of a railroad necessarily results in a nuisance, unless certain precautions are taken to prevent it; that the low places by which the surrounding lands are drained and from which the water is carried off must be filled up, and unless certain precautions are taken to provide an escape for the water, a nuisance necessarily results; and that the railroad company can not escape liability by having the work done by an independent contractor. If the premises of counsel are true, the conclusion might also be true; but if a railroad is built properly, we do not think any nuisance will result from the building. The company, under its charter, had authority of law to do this work; and when it contracted with the construction company it was of course implied that the latter would do the work in a proper and lawful manner. ‘A person employing another to do a
With regard to the case at bar, it is true that electricity is a dangerous force, and, unless properly and carefully handled, will necessarily result in injury either to person or property. It is also in evidence, however, that there is a safe and standard practice in the handling of electricity which if followed will not result in harm. It was necessarily implied in the contract between the Georgia Power Company and the Empire Construction Company that the latter would do this work in a proper and lawful manner. It had entire control over the cutting off of the current and of the putting on of the current. The construction of lines or the handling of lines not connected up was a safe and proper work. The cutting on and cutting off of the power was a matter entirely within the power and discretion of the independent contractor. In the case of Bower v. Peate, 1 Q. B. Div. 321, cited in the minority opinion, it will be noted that there was a failure on the part of the employer to direct that any proper retaining wall be constructed to prevent injury to the adjoining property, and that the independent contractor was merely carrying out the contract which had been let by the employer. In Thompson on Neg. (2d ed.), § 624, it is said: “If, under such a contract, the excavation for the building is so negligently done as to injure a structure on adjoining premises, the owner will not be liable provided the plans and specifications furnished to the contractor were sufficient to secure a safe construction of the building, and provided the erection of the building was not, in its nature, dangerous to adjacent property.” If the owner of adjacent property merely hires an independent contractor to make excavations adjacent to the wall of his neighbor’s building without providing in any way for safeguarding such walls, and such contractor carries out the directions of his employer, such employer will be liable' for any injury resulting from the work carried out in the manner directed by him. On the other hand, if the plans and specifications provided that proper and necessary precautions be taken to prevent injury and such independent contractor failed to
We are unwilling to hold that electricity is a substance so inherently dangerous that a power company may not contract for the
Judgment reversed.
Dissenting Opinion
dissenting. The general rule upon the subject of independent contractors has been stated by the Supreme Court as follows, “When an individual or corporation contracts with another individual or corporation exercising an independent employment, for the latter to do work not in itself unlawful or attended with danger to others, such work to be done according to the contractor’s own method and not subject to the employer’s control or orders except as to the result to be obtained, the employer is not liable for the wrong or negligent acts of the contractor or the contractor’s servants.” Ridgeway v. Downing Co., 109 Ga. 551, 559 (supra). There are, however, exceptions to this rule, which are stated in the Code (1910), § 4415. This section is a codification of the principles enumerated in Atlanta & Florida Railroad Co. v. Kimberly, 87 Ga. 161 (supra). The second exception in this code section is that if according to previous knowledge and experience, the work to be done is in its nature dangerous to others, however carefully performed, the employer will be liable. In discussing this exception, the Supreme Court in the Kimberly case cited Bower v. Peate, 1 Q. B. Div. 321, and Pickard v. Smith, 10 C. B. 470. In the Bower ease the facts were that “The plaintiff and defendant were owners and occupiers of two adjoining houses, and it appeared that, prior to the rebuilding of the defendant’s house, as
In the instant case the power company handed over to the contractor the plant in Winder for the purpose of being rebuilt, yet continued to use it for supplying its customers with electricity. A part of the plant consisted of wires containing 2300 volts of electricity. It is common knowledge that such wires are among the most dangerous instruments in existence when they come in contact with a human being and are uninsulated. The work of the removal of these half-insulated wires is fatally dangerous so long as this amount of voltage'is flowing through them and the contract seems to have anticipated that this current should flow through these wires until cut off in the sector where the work was being done. What was done to prevent the injury in this case ? The attempted preventive measure was the cutting of the primary voltage wires on New street near Broad street. This would have stopped the flow of electricity before it reached the employees but for the fact that the independent contractor, through its other employees, had put in two plugs that caused the wires to be charged with 2300 volts of electricity flowing into them from the opposite direction. So, after all, the flow of electricity was not stopped or reduced.
In short, the work which the independent contractor was doing, to wit, the removal of the 3300 volt primary wires, was of such a dangerous and hazardous nature that it came within the exceptions stated in section 4415 of the Civil Code (1910). The duty was a non-delegable duty. “The words ‘non-delegable duty’ do not imply that there are duties which can be discharged by appointing others to perform them. They describe duties the performance of which may properly be delegated to another person, but subject to the condition that liability follows if the person to whom the performance is delegated acts improperly with respect to it. The master’s non-delegable duty of care to his servants is expressed in terms of liability [by the statement that he is subject to liability] to his servants if he does not use reasonable care to keep their working conditions reasonably safe, or if those whom he employs for such
In my opinion the evidence authorized the verdict.