282 F.3d 609
9th Cir.2002ORDER
The opinion reported at
On page 1162, line 9 of text in column one, delete “River” so that name of petitioner is corrected to “Friends of the Cowlitz”.
On page 1163, line 23 of text in column two, make the same change.
On page 1162, lines 1-4, column two, change to read: “The upstream Mossyrock Dam (185 Ft., completed in 1963), and the downstream Mayfield Dam (325 ft., completed in 1968).”
The petition for rehearing is denied.
