Tuolumne Park and Recreation District, a public agency, sold land containing a disused but historic railroad right-of-way to the Tuolumne Band of Me-Wuk Indians without carrying out any environmental review pursuant to the California Environmental Quality Act (CEQA). The Tuolumne Band owned surrounding property and was known to plan on developing it, but had never presented any development plans to any agency. The trial court denied a petition for a writ of mandamus directing the transferor agency to reverse its action. In this appeal, appellant Friends of the Sierra Railroad argues that the transfer fell within CEQA’s definition of a “project” requiring environmental review because it was reasonably foreseeable that the land would be developed and the development would have an impact on the historical resource. We hold that the transfer was not a project requiring CEQA review because, although some development of the property surrounding the historical resource was reasonably foreseeable, review of conceivable impacts on the historical resource itself would have been premature in the absence of any concrete development proposals. The judgment is affirmed.
FACTUAL AND PROCEDURAL HISTORIES
The history of the Sierra Railway Company (later called the Sierra Railroad Company) is described in the administrative record in a nomination form for the National Registry of Historic Places. The California State Historic Resources Commission has found the entire railroad eligible for inclusion in the national registry.
The railroad was organized by the gilded-age magnates William H. Crocker, Thomas S. Bullock, and Andre Poniatowski in 1897. The 56.2-mile main line was constructed between 1897 and 1900, running from the San Joaquin Valley town of Oakdale in Stanislaus County eastward to Tuolumne City in the Sierra Nevada foothills of Tuolumne County, and rising from 155 feet to 2,690 feet in elevation. The final 6.2 miles of the historic right-of-way, from Standard to Tuolumne City, are at issue in this litigation.
The railroad played a major role in the development of the region. According to the national registry application, “This small r[ai]lroad line touched every aspect of the economic and social life in this section of the Mother Lode country, hauling
The main line remains largely intact. The national registry application says that “[t]rack alignment along this line remains substantially unaltered from its construction date in 1897-1900,” and that “[t]he system as a whole retains a very high degree of integrity to its appearance when it was constructed at the turn of the century.” Staff of the State Historical Resources Commission opined that it is “the most intact historic railroad system in California. Other historic properties in the state retain integrity of track alignment, rollingstock or railroad yard structures. The Sierra is unique in that all of these major components have been preserved.”
Facilities in Jamestown were the original operating center of the railroad and comprise most of its historic structures today. These include a roundhouse, turntable, water and oil facilities, car repair and maintenance shops, freight buildings, and other structures. Antique locomotives and rail cars are also housed there. The Jamestown facilities are presently a state park, Railtown 1897 State Historic Park.
The remainder of the historic railroad consists primarily of only the tracks and route themselves. In addition, there is a historic depot in Standard and four trestles built in 1900 along the line. There are switching yards and side tracks at the ends of the line in Oakdale and Tuolumne City. The land along the line is largely uninhabited and lacks power lines, so the historical integrity of its setting is high. The railroad has been a popular location for filming movie and television productions for this reason.
In addition to the state park in Jamestown and the television and movie shoots, activities supported by the railroad today are a freight service transporting lumber between Keystone and Oakdale and a passenger excursion service out of Oakdale, both carried on by a private company. Trains no longer travel on the Standard-to-Tuolumne portion at issue in this case.
The railroad has a role in the 2002 Tuolumne County recreation master plan. This plan describes a proposed Sierra railroad trail, extending along the railroad right-of-way from the Stanislaus County line to the railroad’s end in Tuolumne City. The trail would link with a proposed extension of the existing Westside Railroad Trail, which follows the right-of-way of a narrow-gauge logging railroad that connected the Tuolumne City terminus of the Sierra Railroad to timberlands in the mountains. This proposed extension of the Westside Railroad Trail is part of the master recreation plan of respondent Tuolumne Park and Recreation District (TPRD). In correspondence with the TPRD, appellant Friends of the Sierra Railroad (FSR) asserted that the railroad also played a role in the 1996 Tuolumne County general plan and the 1996 Tuolumne County regional transportation plan, but these claims have not been repeated in FSR’s appellate briefs.
TPRD acquired the 6.2-mile Standard-to-Tuolumne segment of the line from the railroad’s owners for about $85,000 in 1986. According to newspaper reports, this was the beginning of a political struggle over plans by TPRD to operate excursion trains between Tuolumne and Standard. TPRD announced a deal to purchase two locomotives, leading to a recall drive by opponents of the trains. The recall drive was called off after directors canceled the locomotive purchase plan. In 1991, a three-person anti-train majority
The deal that is the subject of the present litigation was first proposed in 2002. Real party in interest Tuolumne Band of Me-Wuk Indians (the Tribe) purchased the West Side Lumber Company property on the western edge of Tuolumne City that year. The West Side Lumber Company was the location of the historical terminus of the railroad. (The lumber mill located there was destroyed by fire in 1962 or 1963.) A 0.6-mile portion of the right-of-way, 100 feet wide, runs across the Tribe’s 300-acre property. The Tribe proposed a deal in which it would acquire the Standard-to-Tuolumne line in exchange for a building and land it owned in Tuolumne City, plus $75,000 cash. According to newspaper reports, the Tribe’s chairman stated that the acquisition would facilitate its development of the West Side Lumber Company property. The Tribe, which owns the Black Oak Casino near Tuolumne City, was interested in building a hotel, a commercial development, and homes on the property. Administrative offices for the casino have already been opened on the site and a medical clinic was under construction. “If someone else has control of [the right-of-way], that could jeopardize our project,” the Tribe’s chairman reportedly said.
After receiving the Tribe’s proposal, TPRD applied to the Tuolumne County Planning Commission for a determination that transferring the property would be consistent with the county’s general plan. The Tribe submitted a letter in support of the application, stating that it “proposes” to use the right-of-way “for public hiking trails.” The commission issued the requested determination, but specified that it was “based upon the use of the property solely as a trail dedicated for public use by pedestrians, equestrians, and non-motorized vehicles and/or for a railroad.” The commission also stated that “the determination of consistency applies regardless of whether the property is conveyed to any public or private entity or to the Tuolumne Band of Me-Wuk Indians.”
In correspondence with TPRD, FSR argued that, because the right-of-way is a historical resource, TPRD was required to carry out environmental
review under CEQA (Pub. Resources Code, § 21000 et seq.)
1
before disposing of the property. The record contains no indication that TPRD ever made a formal decision that the transaction did not require CEQA review. In fact, there is no evidence that TPRD’s directors ever formally considered undertaking CEQA review, although the issue was raised by FSR and other members of the public at public-comment sessions. The only document in the record to which TPRD points in this regard is a handwritten note saying, in its entirety, “is exchange agreement subject to CEQA—if so it may have started w/resolution.” There is no indication who wrote this note, or when, or to whom it was directed. The lack of evidence on this point may be attributable to TPRD’s decision to hold meetings in which its board discussed the transfer with the Tribe in closed session, a decision that led to a subsidiary dispute between TPRD and FSR about compliance with California’s open-meetings law, the Ralph M. Brown Act. (Gov. Code, § 54950
In addition to the question of CEQA compliance, another issue that generated public comments was whether TPRD ever really owned those portions of the Standard-to-Tuolumne segment that are outside the West Side Lumber Company property. The Tuolumne County Superior Court ruled in 1989 that TPRD owned the 0.6-mile portion inside the West Side Lumber Company property in fee simple, but adjacent owners claimed that the remainder was only an easement and had long since been extinguished on account of the railroad’s abandonment. The Tribe’s chairman was quoted in a newspaper report as saying, “We aren’t so concerned right now about outside of our property [i.e., the West Side Lumber Company property], but we will look at the options if the deal goes through.”
On March 28, 2005, TPRD adopted a resolution authorizing the transfer of the property to the Tribe. TPRD and the Tribe executed a transfer agreement the same day. According to a newspaper report, the president of TPRD’s board said, “We are finally out of the railroad business for good.”
On May 4, 2005, FSR filed a petition for a writ of mandate in superior court pursuant to Code of Civil Procedure section 1085 and Public Resources Code section 21168.5. It asked the court to set aside the transfer and order TPRD to carry out environmental review pursuant to CEQA before disposing of the property.
The court denied the petition. After noting that it was “not disputed that the right-of-way falls within the definition of a historic resource for CEQA analysis,” it stated that “the only question” before it was “whether there is evidence in the record which would support a reasonable argument that the transfer of title to the right-of-way may cause a reasonably foreseeable indirect physical change to the environment.” It concluded that the evidence did not support this because the view that the Tribe might carry out development plans impacting the historical resource was “based on sheer speculation . . . and any attempt to analyze undisclosed plans would necessarily be purely hypothetical and premature.” The court also rejected FSR’s contention that the change in ownership would insulate the property from future environmental review, saying that any future proposals to develop the property or change its use would be subject to CEQA. It dismissed as speculative FSR’s argument that the Tribe could insulate its plans from future review by placing the land in trust with the Bureau of Indian Affairs, removing it from the jurisdiction of local regulators. For those reasons, the court ruled that the transfer was not a “project” within the meaning of CEQA.
DISCUSSION
The prediction that future development will impact the 0.6-mile portion of the right-of-way crossing the West Side Lumber Company property is not sheer speculation. There is every reason to believe the Tribe acquired the right-of-way to further its plans for developing the West Side Lumber Company property. We do not understand the Tribe to be genuinely denying this fact. The brief submitted jointly by it and TPRD asserts that “the land’s use before and after the transfer would remain exactly the same,” but it does not say for how long. It also does not say it was a coincidence that the right-of-way happened to cross property the Tribe owned and wanted to develop.
In spite of this, we agree with the trial court’s ultimate conclusion that CEQA review
I. Standard of review
In its petition for a writ of mandamus, FSR properly cited Code of Civil Procedure section 1085 (traditional mandamus) rather than Code of Civil Procedure section 1094.5 (administrative mandamus) because the agency
action being reviewed was quasi-legislative, not quasi-adjudicatory. (See
Topanga Assn. for a Scenic Community v. County of Los Angeles
(1974)
In dealing with an agency’s conclusion that the action in question was not a project within the meaning of CEQA, however, the trial court can employ its own analysis of undisputed facts in the record and decide the question as a matter of law without deference to the agency’s decision.
(Fullerton Joint Union High School Dist. v. State Bd. of Education
(1982)
Since this is the standard of review, we disregard two procedural arguments made in FSR’s briefs. First, FSR asserts that the trial court “engaged in a determination of fact, rather than law” when it reviewed
II. The meaning of “project”
If an action is a “project” within the meaning of CEQA and not exempt, a public agency intending to approve it must first engage in environmental review, meaning that an environmental impact report or a negative declaration (explaining why no environmental impact report is necessary) must be prepared and must be considered by the agency. (Cal. Code Regs., tit. 14, § 15004, subd. (a).) TPRD did not do this, so its action was proper only if the transfer was not a project or was exempt. TPRD does not claim an exemption, so the only question is whether the transfer was a project.
CEQA defines a project as follows:
“ ‘Project’ means an activity which may cause either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, and which is any of the following;
“(a) An activity directly undertaken by any public agency.
“(b) An activity undertaken by a person which is supported, in whole or in part, through contracts, grants, subsidies, loans, or other forms of assistance from one or more public agencies.
“(c) An activity that involves the issuance to a person of a lease, permit, license, certificate, or other entitlement for use by one or more public agencies.” (§ 21065.)
Further, “[a] project that may cause a substantial adverse change in the significance of an historical resource is a project that may have a significant effect on the environment.” (§ 21084.1.)
CEQA’s conception of a project is broad. Our Supreme Court has stated that when a court determines whether an activity is a project, the statute is “to be interpreted in such manner as to afford the fullest possible protection to the environment within the reasonable scope of the statutory language.”
(Friends of Mammoth
v.
Board of Supervisors
(1972)
In keeping with this broad conception of a project, the CEQA Guidelines call for CEQA review at an early stage in any process that will lead to an impact on the environment. Environmental documents (environmental impact reports or negative declarations) “should be prepared as early as feasible in the planning process to enable environmental considerations to influence project program and design.” (Cal. Code Regs., tit. 14, § 15004, subd. (b).) Without first carrying out CEQA review, agencies must not “take any action which gives impetus to a planned or foreseeable project in a manner that forecloses alternatives or mitigation measures that would ordinarily be part of CEQA review.” (Cal. Code Regs., tit. 14, § 15004, subd. (b)(2)(B).)
This means that agency action approving or opening the way for a future development can be part of a project and can trigger CEQA even if the action takes place prior to planning or approval of all the specific features of the planned development. In
Fullerton, supra,
At the same time, CEQA review is premature if the agency action in question occurs too early in the planning process to allow meaningful
analysis of potential impacts. Although environmental review must take place as early as is feasible, it also must be “late enough to provide meaningful information for environmental assessment.” (Cal. Code Regs., tit. 14, § 15004, subd. (b).) In
Kaufman & Broad, supra,
The Court of Appeal considered a similar situation in
Not About Water Com.
v.
Board of Supervisors
(2002)
The court also relied on
Kaufman & Broad, supra, 9
Cal.App.4th 464 in
Citizens to Enforce CEQA v. City of Rohnert Park
(2005)
III. The transfer was not a project
FSR argues that TPRD’s transfer of the Standard-to-Tuolumne right-of-way was a project because it was an activity directly undertaken by a public agency that may cause a reasonably foreseeable indirect physical change in a historical resource. The reasonably foreseeable change is the impact the Tribe’s development could have on the right-of-way, whatever that impact might turn out to be. FSR says the transfer
We begin our analysis by considering the strengths of FSR’s position. It is true that development of the West Side Lumber Company property by the Tribe is reasonably foreseeable. It is also reasonable to infer that the Tribe acquired the right-of-way crossing in order to facilitate this development. Further, it is possible that the development eventually undertaken could have a variety of CEQA-cognizable impacts on the historical resource. The development could destroy the resource by simply building something on top of it, for instance. Or it could disrupt the county’s general plan by closing the resource to the public or by altering it in ways that would make it unsuitable for use as a public hiking or equestrian trail or as a railroad. (See Cal. Code Regs., tit. 14, § 15125, subd. (d) [environmental impact report must disclose inconsistencies between project and general and regional plans].)
A. Meaningful CEQA review was not yet possible
In spite of these possibilities, we conclude that this case more closely resembles those prior cases in which no CEQA project was found or where CEQA review was premature than those in which there was a project or review was not premature. 2 The reasonably foreseeable likelihood of some development on the West Side Lumber Company property, combined with the possibility that the development could impact the historical resource included within the larger property, does not trigger CEQA review. CEQA review has to happen far enough down the road toward an environmental impact to allow meaningful consideration in the review process of alternatives that could mitigate the impact. If TPRD knew, for instance, that the Tribe intended to damage the historic resource by building a structure in the right-of-way, or knew of a plan to devote the right-of-way to a use inconsistent with the county’s general plan, it could have rejected the deal or conditioned the transfer on the Tribe’s covenant not to do those things. As it was, no specific plans were on the table. The Tribe has not proposed any development that would affect the historical resource. The only statement it has made on the subject is its letter requesting a determination of consistency with the county general plan, in which it said it “proposes” to use the right-of-way for public hiking trails.
FSR describes the Tribe’s reticence on the subject as a “lack of candor,” but we cannot assume that is the case. The truth could be that the Tribe still has no specific plans affecting future uses of the right-of-way. Even if it does, but has made a strategic decision not to present them until after the termination of this litigation, the fact remains that ordering CEQA review in the absence of a plan involving an identifiable impact would not be meaningful.
Topanga Beach Renters Assn. v. Department of General Services
(1976)
Here, the Tribe has announced no plans, so there is no need for a remand to determine that future development is unspecified and uncertain. An environmental impact report would be premature, even though the Tribe likely will develop the property in some way, just as one would have been premature in Topanga Beach absent specific state plans, even though it was likely that the state would eventually develop public facilities at the beach.
In arguing that the land transfer was a CEQA project, FSR relies in its opening brief primarily on
Bozung v. Local Agency Formation Com.
(1975)
In
Bozung, supra,
In considering whether the annexation was a project, the court in
Bozung
explicitly declined to decide whether an annexation is an activity that “ ‘may have a significant effect on the environment,’ ” asserting that this was a separate issue, relevant only to the distinct question of whether an environmental impact report was required by the terms of section 21151.
(Bozung, supra,
In any event, when it did turn to the question of the potential impact on the environment in order to decide whether an environmental impact report was required, the court concluded that a planning process to subdivide the land for a residential and commercial development had taken place and building was expected to go forward in the near future. That in turn “ ‘may have a significant effect on the environment,’ ” so an environmental impact report was required. (Bozung, supra, 13 Cal.3d at pp. 279, 281.)
It is this factual element, of course, that is lacking in this case. No planning process has taken place and no building is expected to go forward in the near future that could cause an impact on the historical resource. If the statutory definition of a project had been the same in 1975 as it is today, a known development plan and imminent construction would have been crucial considerations in determining whether the annexation was a project in Bozung.
In
Fullerton,
which involved the approval of a city’s plan to secede from a school district, a project was present because the approval
necessitated
the construction of a high school in Yorba Linda.
(Fullerton, supra,
B. TPRD was not obliged to compel disclosure of plans
FSR’s brief argues that TPRD should have compelled the Tribe to present development plans before deciding to transfer the property and suggests that this compulsion could be part of a CEQA remedy in this case: TPRD “should, and easily could, have required the Tribe to publicly disclose its future development plans for the West Side Property prior to the District’s final consideration of the land exchange. The District failed to carry out that duty.” We know of no authority for this kind of remedy and FSR has cited none. TPRD had as much power to extract conditions of this kind from its buyer as any other seller in a real estate transaction has, but it did not have a duty to extract them. We do not think CEQA compels public agencies, or empowers petitioners, to force property owners to create or disclose development plans for the purpose of accelerating environmental review. At least it does not do that under the circumstances presented here.
C. CEQA review was not improperly avoided or transferred
FSR also points out that, after selling the land, “there is no other occasion on which [TPRD] would have the opportunity to perform CEQA review regarding the consequences of that action.” Future review of the Tribe’s development plans will be the responsibility of another agency,
Most of the cases discussed above in which the court found no project are different from the present case in this regard. Unlike TPRD, the agencies whose actions were challenged in most of those cases—the school district in Kaufman & Broad, the city in Citizens to Enforce CEQA, and the Department of General Services in Topanga Beach—would have future opportunities to engage in CEQA review if development plans became concrete. The public would not have to depend on some other agency to step in.
We identified a similar issue in
County Sanitation Dist. No. 2
v.
County of Kern
(2005)
Here, however, we do not believe the fact that another agency will carry out any future CEQA review of the Tribe’s plans means that TPRD must engage in CEQA review now. The fact that future review will have to be performed by another agency cannot convert a meaningless review process into a meaningful one or convert a nonproject into a project.
D. Applicability of the “fair argument” standard and the “commonsense” exemption
FSR’s brief contains a section headed, “Appellant need only show a reasonable argument that approval of the Project will result in potentially significant environmental impacts.” In analyzing the meaning of “project,” this section employs the “fair argument” standard used in determining when an environmental impact report is necessary. It also relies on aspects of the so-called commonsense exemption to CEQA. Application of the fair argument standard would not alter the result, and the commonsense exemption is irrelevant. Consequently, this approach does not advance FSR’s cause.
First, FSR asserts that an activity is a project if a petitioner makes a “reasonable argument” that the activity will result in a potentially significant environmental impact. FSR states: “Once [TPRD] was presented with [FSR’s] legitimate questions about the ultimate impacts of the [transfer] on the historic integrity of the Right-of-Way,... the burden shifted to [TPRD] to treat the [transfer] as a project . . . .” This is really just the familiar
Where the fair argument standard applies, it strongly favors environmental review, because it requires environmental review whenever substantial evidence supports it, even if other contrary substantial evidence exists. We know of no authority explaining whether or when the fair argument standard may be applicable to determining whether an activity is a project in the first place. We need not decide if it is applicable to that question in this case, because there was no project even under that standard. As we have said, the lack of announced development plans meant that no identifiable impact on the historical resource itself (as opposed to the larger Westside Lumber Company property) was foreseeable. Substantial evidence of the impact was therefore lacking and we would hold that there was no project even if the fair argument standard were applicable.
Next, FSR attempts to apply a case involving the commonsense exemption to the question of what constitutes a project. The commonsense exemption is the following provision of the CEQA Guidelines: “Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA.” (Cal. Code Regs., tit. 14, § 15061, subd. (b)(3).) FSR says the application of this exemption in
Davidon Homes
v.
City of San Jose
(1997)
In Davidon Homes, the court considered a San Jose ordinance providing that a moratorium on certain hillside developments would be lifted only after invasive geological testing determined the hillside’s vulnerability to landslides. Opponents asserted that the testing was a CEQA project and could not be done without environmental review. The city rejected this assertion and passed the ordinance without performing CEQA review. A preamble recited that the testing was categorically exempt from CEQA under the commonsense exemption. (Davidon Homes, supra, 54 Cal.App.4th at pp. 110-111.) The trial court denied the opponents’ petition for a writ of mandate. (Id. at p. 112.)
The Court of Appeal reversed. It held that the opponents had made a reasonable argument suggesting that a significant environmental impact was possible. The commonsense exemption would apply only if the city then showed with certainty that there was no possibility of a significant impact. The record lacked substantial evidence to show this, so the exemption did not apply and the Court of Appeal ordered the trial court to grant the petition. (Davidon Homes, supra, 54 Cal.App.4th at pp. 118-119.)
Although TPRD has never claimed a categorical exemption, FSR attempts to analogize the present case to Davidon Homes by saying that it made a reasonable argument suggesting that a significant environmental impact was possible, so TPRD then had the burden of showing that no such impact was possible. The record does not show this with certainty, FSR contends, so TPRD should have undertaken environmental review.
E. The possibility of a future federal trust does not make the transfer a project
FSR contends that transferring the land to the Tribe is a project because, under federal regulations, the Tribe can apply to the Bureau of Indian Affairs to place the land in trust. (See 25 C.F.R. § 151.1 et seq. (2006).) This, FSR argues, would mean the land could no longer be regulated by state and local authorities. Future CEQA review would be rendered impossible. (See
Friends of East Willits Valley
v.
County of Mendocino
(2002)
Assuming that this is a genuine possibility, it still does not convert the transfer into a CEQA project. The risk FSR points out exists every time an environmentally significant resource is transferred out of the control of a public agency. The transferee, Indian tribe or not, always might take action that could interfere with future CEQA review. It could, for instance, sell the land to the federal government or to an Indian tribe. This does not mean that every transfer away from public agency ownership is a project. Nothing in the record makes it particularly likely that the Tribe will request trust status for the right-of-way or that a request would be granted.
FSR relies on
Friends of Sierra Madre v. City of Sierra Madre
(2001)
In
Friends of Sierra Madre,
a city ordinance removed 29 properties from the city’s register of historic landmarks.
(Friends of Sierra Madre, supra,
25 Cal.4th at pp. 177-178.) The Supreme Court affirmed a judgment of the Court of Appeal stating that delisting historic properties was a CEQA project because it “led to a change in legal status removing the evidentiary presumption of Public Resources Code section 21084.1 that a listed structure is a historically or culturally significant resource.”
(Friends of Sierra Madre, supra, 25
Cal.4th at pp. 181, 196.) In
Mountain Lion Foundation,
the court
held that removal of species from the endangered and threatened species lists is not categorically exempt from CEQA because that removal “withdraws existing levels of protection.”
(Mountain Lion Foundation, supra,
First, of these two cases, only
Friends of Sierra Madre
is relevant to the issue at
Second, Friends of Sierra Madre does not show that the transfer was a project. The transfer was a change in ownership, not a change in protected status. It may constitute a change in vulnerability to a change in protected status, but we do not think that kind of change in vulnerability is a project. Transferring property to an Indian tribe is not a project under the present circumstances because it is too many steps removed from any actual impact. The first step is the transfer. The second and third are the requesting and granting of trust status. The fourth is the implementation (after any remaining applicable federal or state environmental review) of a development plan that would have an effect on the right-of-way. Further, even assuming these things will happen, the actual impact is still unknown. The causal element of the statutory definition of a project—the activity “may cause” a “reasonably foreseeable indirect physical change in the environment” (§ 21065)—is broad, but we do not think it encompasses this situation. The causal distance between the ordinance in Friends of Sierra Madre and an actual specific impact on a historical resource was substantial, but it was not as great as the distance here.
For all these reasons, we conclude that TPRD’s decision to transfer the right-of-way to the Tribe was not a project within the meaning of CEQA. As what we have already said suggests, we do not hold that a public agency’s alienation of real property it wishes to dispose of is never a CEQA project. To the contrary, the CEQA Guidelines imply that an agency’s disposal of surplus property can sometimes be a project. Surplus government property sales are categorically exempt if the property has no significant environmental value and certain other conditions are satisfied. (Cal. Code Regs., tit. 14, § 15312.) This implies that, in other circumstances, a surplus government property sale can be a project. Like any other agency action, property disposal—even of a historical resource—is not a project if too little is known about environmental impacts to which it might lead to allow those impacts to be meaningfully analyzed.
DISPOSITION
The judgment is affirmed. Respondents shall be awarded their costs on appeal.
Vartabedian, Acting P. J., and Gomes, J., concurred.
Appellant’s petition for review by the Supreme Court was denied May 9, 2007, S151171.
Notes
Subsequent statutory references are to the Public Resources Code unless indicated otherwise.
Prematurity and the meaning of “project” are sometimes treated as distinct issues. (See
Fullerton, supra,