28 N.W.2d 197 | Neb. | 1947
This is an action for a mandatory injunction to require the defendant to remove a dike which he constructed on his land to prevent the waters of Rattlesnake Creek from flooding over onto it, and for a permanent injunction enjoining the defendant from constructing or maintaining an embankment interfering with the natural flow of flood waters from Rattlesnake Creek across his land. The trial court found for the plaintiffs and the defendant has appealed.
The defendant is the owner of the southeast -quarter and the south half of the northeast quarter of Section 17, Township 25, North, Range 6, East of the 6th P. M. in Thurston County. Plaintiffs are owners and tenants of owners of lands in Sections 17, 8 and 16, and allege that their lands and crops have been damaged by the waters of Rattlesnake Creek as the result of the construction of the dike hereinafter described.
Rattlesnake Creek is a small winding stream which
The waters thus spilled out of the creek at the eastern side of the horseshoe bend followed a fixed course to the northeast and did not remain long on defendant’s land. While the evidence is somewhat in conflict, the preponderance of the evidence is that, except for small depressions here and there, these flood waters were not trapped on defendant’s land, nor did they become diffused surface waters.
Plaintiffs’ engineer testifies that as Rattlesnake Creek approaches the horseshoe bend on defendant’s land it has considerable fall. A short distance west of the half section line, between the east and west halves of Section 17, it begins to level off, with the result that after heavy rains it tended to pile up in the horseshoe bend and flood over the eastern bank thereof at the point where defendant constructed the dike constituting the subject of this suit. The northeast corner of defendant’s land is five feet lower in elevation than at the east base of the dike constructed by the defendant. The engineer further testifies that there are evidences of a more or less defined drainageway, or swale, from the east bank of the dike to the northeast corner of
,The evidence shows that in 1945 defendant employed a contractor to construct a new ditch across the open end of the horseshoe bend just inside his west line fence, connecting the channel of Rattlesnake Creek immediately after it enters defendant’s land from the southwest with the channel at a point a short distance before it leaves defendant’s lands in a northwesterly direction. On the east bank of this channel a dike estimated from six to eight feet in height was constructed, which prevented the waters from spilling over and passing across defendant’s land as they did in former times. In 1945 and 1946 this resulted in a flooding and damaging of the lands of plaintiffs in Sections 17, 8 and 16, shown on the map as belonging to Lucy Schutte Suhr, Theodore H. Suhr, John D. and Loraine Claussen, G. D. L. Frese, H. H. Burmester, and others. The testimony shows that these lands had never before been flooded from this source and that the flooding complained of resulted from the ditch and dike construction herein-before described.
The defendant offered evidence to the effect that there was no overflow channel or drainage course from the horseshoe bend to the northeast corner of his land. The evidence offered by him tends to establish that these flood waters spilled over the bank of Rattlesnake Creek and were trapped on his land, spreading out and percolating away only after several days time. The preponderance of the evidence, however, does not sustain this theory.
Defendant produced evidence, also, that the flooding complained of was caused primarily from a filling of Rattlesnake Creek in the southwest quarter of Section 16 to permit it to be “farmed across” at that point. There is evidence that on one occasion a road grader was used to smooth down the banks so that farm machinery could be driven across the creek. This work is alleged to have consumed an hour and one-half in
The evidence does show that Rattlesnake Creek progressively decreased in size as it proceeds through and beyond the southwest quarter of Section 16. The evidence shows, however, that this condition was brought about by a change in course of Rattlesnake Creek. It is shown that on or about July 5, 1945, the creek broke through to a large drainage ditch a short distance to the east of it. This break-through occurred near the point where Rattlesnake Creek crosses the north line of the southwest quarter of Section 16, and followed the east and west center line of Section 16 to the east until it reached the drain.
It is clear from the evidence that any interference with the flow of Rattlesnake Creek in and below the southwest quarter of Section 16, shown by the record before us, was not a contributing factor in causing the flood damage of which complaint is made. The lack of a well-defined channel and a live stream is primarily due to the break-through to the large drain to the east.
We conclude from a consideration of all the evidence that the straightened channel with the dike on the east bank thereof, which was constructed by defendant on his land as hereinbefore described, covers the area at which Rattlesnake Creek was wont to flow before the construction of the dike, and prevents the overflow flood waters of Rattlesnake Creek to spill out and pass over defendant’s land as it had done for many years prior to the construction of the dike; that instead, the dike causes the flood waters of Rattlesnake Creek, in excess of the capacity of its channel, to back up and flow onto the lands of these plaintiffs and damage them by depositing mud and debris thereon.
It is clear that such damage to plaintiffs’ lands and crops will occur periodically in the future if the dike is permitted to remain in its present condition.
The defendant claims error in the refusal of the trial court to grant a continuance of the trial in order to permit him to secure additional evidence concerning elevations and other expert evidence bearing upon the case. It is evident that defendant should have anticipated the need of such evidence before the trial. No surprise is shown and due diligence appears to have been lacking. Under such circumstances the discretion exercised by the trial court in denying the continuance will not be disturbed.
Affirmed.