OPINION OF THE COURT
An action brought by a property owner claiming to be the third-party beneficiary of a contract between a wrecking company, as promisor, and a municipality, as promisee, is an action "arising out of a contract” of the municipality within the meaning of CPLR 9802 and, no notice of claim having been filed until four years after completion of the contract, is barred as to the municipality by that section. Nor may the action be maintained against the wrecking company-promisor by the property owner as a third-party beneficiary, the latter not being an intended beneficiary of the contract. The order of the Appellate Division dismissing the complaint in its entirety should, therefore, be affirmed, with costs.
I
Plaintiff, Fourth Ocean Putnam Corp. (Fourth Ocean), owned the Atlantic Beach Hotel. The hotel was so severely damaged by
The contract called for Interstate to demolish and remove buildings and boardwalk and stated that as demolition progressed all materials and debris were to be removed from the premises and that the lot, after demolition, was to be compacted and graded to "grade level” with dirt. In paragraph 5 the parties also agreed that, "All walls and foundations shall be removed one (1) foot below the elevation of the existing grade of the sidewalk adjacent to it. The slab will be crushed for drainage and all large pieces removed.” Before demolition commenced, Fourth Ocean brought an action for injunction to prevent it, but after a preliminary injunction was denied, the action was, apparently, abandoned. Demolition was concluded in July 1978, at a cost of $86,373.63 to the Village, which subsequently recovered that sum from Fourth Ocean.
In March 1982, Fourth Ocean began construction of new buildings on the site formerly occupied by the hotel. During initial excavation work it discovered that the walls and foundations had not been removed one foot below existing grade nor had the slab been crushed and all large pieces removed as required by the contract. It concedes, however, that it knew at the time that the demolition took place that the boardwalk had not been removed. In July 1982, plaintiff filed a notice of claim against the Village and, in September 1982, commenced this action against both the Village and Interstate.
The first cause of action, for breach of contract, was asserted against both defendants and alleged that plaintiff was a third-party beneficiary of the demolition contract entered into by the defendants, that Interstate failed to remove the concrete foundation and boardwalk, to crush the slab and to remove the large pieces, and that the Village breached its obligation to the plaintiff in failing to supervise and to insure that the contract and the judgment were fully complied with. Plaintiff also pleaded a second cause of action, against the Village alone, for "return of that portion of the cost of demolition which was paid to cover the cost of the removal of the foundation, slab and boardwalk.”
Special Term dismissed the action against the Village as untimely, holding that the claimed breach of contract occurred upon completion of the demolition and that notice of claim had not been filed nor the action begun within the 18 months after completion allowed by CPLR 9802. Defendant Interstate’s motion was, however, denied, the court holding that the contract conferred a benefit upon plaintiff "as the owner of the property where the hazardous structures were demolished,” but that whether such benefit was intended by the parties was a triable issue of fact.
Both Fourth Ocean and Interstate appealed. The Appellate Division modified the order of Special Term by granting Interstate’s motion for summary judgment and dismissing the complaint in its entirety, and otherwise affirmed. It held that, as a matter of law, Fourth Ocean could not be considered a third-party beneficiary because the demolition "was not done to prepare the latter’s property for further income producing development but rather was done to benefit the community at large by removing structurally dangerous and unsafe buildings.” (
II
To the extent pertinent to this appeal, CPLR 9802 provides that: "no action shall be maintained against the village upon or arising out of a contract of the village unless the same shall be commenced within eighteen months after the cause of action therefor shall have accrued, nor unless a written verified claim shall have been filed with the village clerk within one year after the cause of action shall have accrued * * * The omission to present a claim or to commence an action thereon within the respec
Plaintiff’s first cause of action alleges that the Village breached its obligation to plaintiff in failing to supervise and see that the items.of the contract awarded by the Village to Interstate were fully carried out and claims damages of $100,000 for the breach. Its second cause of action repeats and realleges the claimed breach and avers that as a result thereof it is entitled to the return of that portion of the cost of demolition paid by it to the Village which relates to removal of the foundation, slab and boardwalk. Both causes of action, therefore, as pleaded and as argued by the parties, rest either on the contract between the Village and Interstate of which plaintiff claims to be third-party beneficiary (first cause of action), upon an implied in fact obligation resulting from that contract (first cause of action), or upon an implied in law restitution claim resulting from breach of that contract (second cause of action). Both claims are, therefore, either "upon or arising out of a contract of the village,” within the meaning of CPLR 9802.
Plaintiff does not argue otherwise. Rather, although it admits knowledge at the time demolition was completed that the boardwalk had not been removed, it contends that it did not discover until it sought to rebuild that the contract provisions concerning the foundation and slab had not been carried out, and argues by analogy to the foreign object cases, such as Martin v Edward Labs. (
Third, and most importantly, the purpose behind statutes such as CPLR 9802 is to give the municipality early notice of a claim so that investigation can be promptly made and evidence relating to the claim can be preserved (see, Matter of Beary v City of Rye, 44
Ill
Dismissal of the third-party beneficiary claim was also proper.
Recognizing that "the terms 'donee’ beneficiary and 'creditor’ beneficiary carry overtones of obsolete doctrinal difficulties,” the Restatement (Second) of Contracts, has abandoned those terms in favor of "the terms 'intended’ beneficiary and 'incidental’ beneficiary * * * to distinguish beneficiaries who have rights from those who do not” (Restatement [Second] of Contracts ch 14, Introductory Note, at 439). An incidental beneficiary is one who is not an intended beneficiary (Restatement [Second] of Contracts § 302 [2]). Essential to status as an intended beneficiary under subdivision 1 of that section is either that "performance of the promise will satisfy an obligation of the promisee to pay money to the beneficiary” or that "the circumstances indicate that the promisee intends to give the beneficiary the benefit of the promised performance.”
We think that the Restatement formulations state the essence of the prior holdings of this court while clearing away some of the unnecessary differentiations and circuitous language set forth in some of those decisions.
Here, as i n Matter of American Ins. Co. (Messinger—Aetna Cas. & Sur. Co.) (
For the foregoing reasons, the order of the Appellate Division should be affirmed, with costs.
Chief Judge Wachtler and Judges Jasen, Simons, Kaye, Alexander and Titone concur.
On review of submissions pursuant to section 500.4 of the Rules of the Court of Appeals (22 NYCRR 500.4), order affirmed, with costs.
Notes
. What plaintiff seeks to enforce against the Village is not any obligation undertaken by the Village in its contract with Interstate for plaintiff’s benefit (the only obligation undertaken by the Village in that contract was to pay the consideration, which it did). Rather, as already noted, plaintiff seeks to imply from the contract an independent obligation on the part of the Village to require full performance by Interstate. Because both claims are barred by CPLR 9802, it is not necessary to consider further the third-party beneficiary claim against the Village.
. The section also provides that intention can be negated by express agreement of the promisor and the promisee and that recognition of the beneficiary’s right to performance must be appropriate to effect the intention of the parties.
. Section 313 (2) provides that: "In particular, a promisor who contracts with a government or governmental agency to do an act for or render a service to the public is not subject to contractual liability to a member of the public for consequential damages resulting from performance or failure to perform unless (a) the terms of the promise provide for such liability; or (b) the promisee is subject to liability to the member of the public for the damages and a direct action against the promisor is consistent with the terms of the contract and with the policy of the law authorizing the contract and prescribing remedies for its breach.”
. E.g., the benefit "must be immediate in such a sense and to such a degree as to indicate the assumption of a duty to make reparation if the benefit is lost” (Associated Flour Haulers & Warehousemen v Hoffman,