Florida Gas Transmission Co. v. PSCFlorida Gas Transmission Co. v. PSC
Robert D. Vandiver, Gen. Counsel, David E. Smith, Director of Appeals and Michael A. Palecki, FL Public Service Com‘n, Tallahassee, James P. Fama, Sr. Counsel, FL Power Corp., St. Petersburg, and Peter M. Dunbar, Pennington, Haben, Wilkinson, Culpepper, Dunlap, Dunbar, Richmond & French, P.A., Tallahassee, on behalf of Sunshine Pipeline Partners, for appellees.
OVERTON, Justice.
Florida Gas Transmission Company (Florida Gas) appeals an order of the Florida Public Service Commission (the Commission) in which the Commission determined that a need exists for a second natural gas transmission pipeline in peninsular Florida and that the pipeline proposed by SunShine Pipeline Partners (SunShine) is the appropriate project to fill this need. Florida Gas opposes these findings, asserting (1) that
The record reflects that, in early 1993, SunShine filed an application for determination of need with the Commission pursuant to
Several intervenors opposed the need determination, but the principal opposition came from Florida Gas, the company that, for over thirty years, has controlled the only other natural gas pipeline serving the area in which SunShine proposes to offer service. After hearing from interested parties, the Commission issued its final order, which was thirty-three pages in length, and stated in pertinent part as follows:
SunShine‘s project is designed to supply an additional 250,000 Mcf per day of natural gas transmission capacity in 1995, 425,000 Mcf per day in 1998, and 550,000 Mcf per day in 1999 to fill that demand. SunShine provided evidence to support the demand for the additional transmission capacity in two ways; a forecast of electric utilities’ gas capacity requirements for the years 2000 and 2010, and the signed precedent agreements of prospective shippers on the SunShine pipeline.
SunShine‘s witnesses Rose and Burgin testified that the major demand for additional gas transmission capacity into the state comes from the electric generation industry. Mr. Rose provided a forecast that estimated the demand for pipeline capacity (gas capacity requirements) by considering both the increased demand for capacity to serve existing oil/gas steam powerplants in Florida that will convert to natural gas, and the increased demand for capacity to serve new gas-fired powerplants.
... .
Mr. Rose then estimated the firm gas pipeline capacity in the years 2000 and 2010 that would be necessary to serve the electric generating requirements of new gas powerplants. Mr. Rose assumed on a conservative basis that 50 percent of the increase in electricity generation requirements
would come from firm gas-fired power generation. He based this assumption on Florida utility plans that show that two-thirds of the planned capacity additions will use natural gas as the principal fuel. ... .
B. Precedent Agreements
SunShine has obtained signed precedent agreements for approximately 71 percent of the capacity proposed for 1995, and approximately 58 percent of the capacity proposed for 1998. The ultimate initial design capabilities of SunShine‘s proposed project are achieved in 1999... .
... .
C. Natural Gas Delivery Reliability and Integrity
We have found that SunShine has adequately demonstrated that there is a demand for additional natural gas capacity into the state. SunShine has also adequately demonstrated that neither existing pipeline companies, nor approved capacity additions to existing pipelines in Florida have sufficient excess capacity to satisfy the forecasted growth in capacity requirements for natural gas.
... .
E. Pipeline-to-Pipeline Competition in Florida
The citizens of the State of Florida will benefit in a variety of ways from competition between natural gas transmission pipelines. Those benefits include additional gas supplies for cleaner electric generation, potentially lower electric and gas utility rates, the economic multiplier effect within the state‘s economy resulting from purchases of pipeline and materials, and employment of Florida citizens... .
The order further contained an analysis of the expert testimony setting forth a need for a pipeline and contained express reasons why the SunShine pipeline is the appropriate project to fill this need.
Florida Gas challenges this order on the grounds that
Constitutionality of Section 403.9422
Under its first argument, Florida Gas contends that
Since the Act‘s passage, the Federal Energy Regulatory Commission (FERC) has continued its attempt to reform various practices in the natural gas industry by issuing a series of policy orders. Pertinent here is FERC‘s issuance of Order No. 636, 57 Fed. Reg. 13, 267 (1992) (codified at
In recognizing that natural gas usage levels would continue to rise in Florida and that a need existed to ensure the reliable and safe delivery of natural gas in Florida, the legislature
It was under
In the determination of need, the commission shall take into account the need for natural gas delivery reliability, safety, and integrity; the need for abundant, cleanburning natural gas to assure the economic well-being of the public; the appropriate commencement and terminus of the line; and other matters within its jurisdiction deemed relevant to the determination of need.
We fully understand that a legislative delegation of power to a legislative or executive agency permitting an agency to declare what the law is violates Florida‘s separation of powers doctrine. Department of Ins. v. Southeast Volusia Hosp. Dist., 438 So.2d 815 (Fla. 1983), appeal dismissed, 466 U.S. 901, 104 S.Ct. 1673, 80 L.Ed.2d 149 (1984); Askew v. Cross Key Waterways, 372 So.2d 913 (Fla. 1978). These principles, however, do not prohibit the legislature from delegating the authority to carry out legislative policy when such delegation is accompanied by proper standards and guidelines.
We find that
Sufficiency of the Commission‘s Factual Findings
Florida Gas‘s second contention relates to the Commission‘s final order. It asserts that the order is incomplete as a matter of law because the order fails to explain the policy rationale of the Commission‘s decision, as required by
We find that the Commission‘s singlespaced, thirty-three page order in this case, when taken as a whole, fully and adequately discusses the reasoning behind its decision, as required by law. The fact that some of Florida Gas‘s proposed findings of fact were expressly rejected by the Commission as being “conclusory” or “argumentative” does not require a finding that this order is incomplete. We conclude that the Commission‘s order meets all statutory requirements.
Accordingly, the order of the Public Service Commission approving the need for an additional gas transmission pipeline to be constructed by SunShine Pipeline Partners is affirmed.
It is so ordered.
BARKETT, C.J., and McDONALD, SHAW, GRIMES, KOGAN and HARDING, JJ., concur.