Appeal from an order of the Supreme Court (Dier, J.), entered August 30, 1996 in Warren County, which denied plaintiff’s motion for partial summary judgment and a cross motion by defendant M. Wilson Control Services, Inc. for common-law indemnification.
Plaintiff is a forest products company engaged in the business of the manufacture and sale of paper and wood byproducts with a manufacturing facility (hereinafter the facility) in the City of Glens Falls, Warren County. In June 1991, plaintiff entered into a contract with defendant M. Wilson Control Services, Inc. (hereinafter Wilson), an electrical
Thereafter, Wilson entered into a subcontract agreement with defendant MLB Industries, Inc. (hereinafter MLB) to perform certain nonelectrical work, including, inter alia, enlargement of the existing concrete slab to accommodate the new transformer. Work performed under the subcontract agreement was also required to be in compliance with the specifications. On August 22, 1991, Edgar Carpenter, an MLB employee, was fabricating the reinforcing grid for the new concrete pad. While he was handling a 13-foot steel reinforcing rod, one end touched an exposed copper ground wire at a time when the rod’s other end was sufficiently close to the overhead bus of the energized substation transformer causing a 34,500-volt charge of electricity to "arc” or jump from the transformer through the rod and the grounding wire into the ground. The incident caused a facility-wide power outage which disrupted the facility’s manufacturing operation.
Subsequently, plaintiff commenced this action against Wilson and MLB, alleging negligence and breach of contract and seeking property damages and economic loss in excess of $219,000. Wilson and MLB cross-claimed against each other for indemnification. Following discovery, plaintiff moved for partial summary judgment against Wilson and MLB (hereinafter collectively referred to as defendants) on the breach of contract cause of action. Wilson cross-moved for summary judgment on the issue of indemnification from MLB. Supreme Court denied both motions. Plaintiff and Wilson appeal.
Initially, we reject MLB’s contention that Supreme Court erred when it determined that plaintiff was the intended beneficiary of MLB’s subcontract agreement with Wilson and, therefore, could maintain this breach of contract action against MLB for property damages and losses.
We next turn to the merits of plaintiff’s contentions. Plaintiff, noting that the contract required defendants to perform their work without affecting plaintiff’s daily operations, argues that sections 16026 (a) and 16034 (b) and (c) of the contract specifications
Notably, Carpenter testified at his examination before trial that, although MLB employees had been warned not to use metal tape measures and not to raise anything over their heads while working near the transformer, he had not been instructed regarding movement of the reenforcement rod around the grounding grid. There was also uncontroverted evidence that the existing energized transformer had no insulation covering it at the time of the accident, despite the fact that Wilson possessed an insulating blanket. The evidence further indicated that Wilson did not have a supervisor on the job at the time of this incident. In our view, plaintiff’s proof was sufficient to entitle it to summary judgment, as a matter of law, on the issue of defendants’ liability for breach of their contractual duties to comply with pertinent safety regulations, to provide approved protection for plaintiff’s property against damage and loss, and to perform work without affecting plaintiff’s daily operations (see, CPLR 3212; see also, Zuckerman v City of New York,
It is now well settled that " 'extrinsic and parol evidence is not admissible to create an ambiguity in a written agreement which is complete and clear and unambiguous upon its face’ ” (W.W.W. Assocs. v Giancontieri,
Defendants’ evidence establishes that plaintiff’s project engineer was involved in many aspects of the project’s completion, including approval of work equipment and methodology, supervision and management of the job site. As to safety, plaintiff’s manager of maintenance services, John Granger, whose primary responsibility was the electrical distribution system, testified that safety concerns regarding, inter alia, energized transformers, voltage levels and exposed metal conductors had been discussed at a pre-bid meeting between plaintiff and the contractors. Michael Wilson testified that plaintiff directed how the project was to be handled regarding safety and that it was his understanding that the safety aspects of the project were to be overseen by plaintiffs safety coordinator. Granger also testified that he reviewed the job’s progress daily, including physically visiting the substation site, and that he had not complained either to Wilson’s foreman or anyone from MLB regarding job-site safety prior to the incident. Finally, it was plaintiffs decision to complete all pre-shutdown work while the transformer remained energized. We find this evidence sufficient to raise a triable issue (see, Zuckerman v City of New York,
We also find that Supreme Court properly denied Wilson’s cross motion for summary judgment on its claim for common-law indemnification against MLB. "One is entitled to implied indemnification where he or she has committed no wrong but is held vicariously liable for the wrongdoing of another” (Kozerski v Deer Run Homeowners Assn.,
Mercure, White, Spain and Carpinello, JJ., concur. Ordered that the order is affirmed, without costs.
Notes
. Plaintiff’s contention that MLB was required to file a cross appeal lacks merit. Having obtained an order in its favor denying plaintiff’s motion for partial summary judgment, MLB was not aggrieved by it (see, CPLR
. Section 16026 (a) obligates the contractor to: "1. Provide approved protection for all work and property against damage, injury, loss, etc., until testing and final acceptance.”
Section 16034 (b) provides, in relevant part, as follows: "In accordance with generally accepted construction practices, the Contractor will be solely and completely responsible for conditions of the job site, including safety of all persons and property during performance of the work.”
Section 16034 (c) provides: "The duty of the Engineer to conduct construction review of the Contractor’s performance is not intended to include review of the adequacy of the Contractor’s safety measures, in, on or near the construction site.”
. The specifications define a "contractor” as "the person, firm or corporation performing the work called for in this Electrical Specification, whether they be prime or sub”.
