99 Minn. 119 | Minn. | 1906
Without going into unnecessary details, the principal facts in this case are as follows: Plaintiff owns lot 19 of block 21 in the city of Stillwater, except a small part, twenty five by sixty feet, in the northeastern corner thereof, which is owned by defendant water company. Situated upon the portion owned by the water company is what is called in the record the “McKusick Spring,” from which the company obtains its supply of water for the inhabitants of the city. Soon after plaintiff became the owner of the lot, about June, 1900, he made an excavation thereon for the purpose of obtaining a supply of water for use at his livery and sale barns. He excavated to the depth of sixteen or eighteen feet, near the line of the water company’s property, and struck a large supply, in the neighborhood of one hundred fifty thousand gallons daily flow, running in pipes therefrom to the barns some distance away. He in fact could not use all this water, and to avoid stagnation in the spring developed by his excavations laid a pipe therefrom to the city sewer,
Subsequent to the commencement of that action the water company made certain improvements upon its property for the purpose of restoring McKusick spring to its original condition, and by excavations and other improvements in a large measure succeeded. The result of this was to diminish the supply of water in plaintiff’s spring. After some further efforts on the part of each of the parties to maintain and assert their respective rights in the premises, during which time an injunction was issued against plaintiff at the suit of defendant, and subsequently modified, defendant made still further and more extensive improvements upon its property. A new well was sunk, twenty five feet deep, in connection with which ditches and trenches were laid to lead the water therefrom to a standpipe, the result of all of which, so plaintiff claims, was to completely drain his spring and deprive him of all his water. He brought this action to recover damages for the alleged wrongful and unlawful conduct of defendant in the premises. It is claimed as the basis of the action that by the excavations and underground tunnels defendant crossed the line between the respective properties of the parties, gained access to plaintiff’s excavation, which contained his supply of water, and wholly drained the same. Plaintiff does not contend that he is entitled to recover for the loss of water caused by its natural percolation through the soil into defendant’s well, but because of the fact that the tunnels made by defendant extended beyond the line of its property on to that of plaintiff, by means of which plaintiff’s reservoir of water was tapped and entirely drained. Defendant put in issue this contention of plaintiff, denying that any tunnels were constructed by it, or that the water from plaintiff’s spring was drained therefrom, otherwise than by percolation through the soil or by natural crevices in the rock underneath the surface. Plaintiff had a verdict for the sum of $21,717, and appealed from an order granting a new trial.
The reasons prompting the court to sustain orders of this kind are well summed up in Dunnell, Minn. Pr., 1075: “The duty of the trial court is to keep the jury within the bounds of reason. The duty of the appellate court is to keep the trial court within the bounds of judicial discretion. The trial court is as well able to determine the preponderance of the evidence and the justice of the cause as the jury. It hears all the evidence submitted, observes the general appearance of the witnesses and their demeanor on the stand, hears the arguments of counsel, is able to judge the intelligence of the jury, knows of any circumstances of the trial calculated to influence the jury improperly, knows the things that were not done in the course of the trial, as well as the things that were done, and is conscious of what has been happily described as the
For the reasons stated, the order granting a new trial must be affirmed.
In view of another trial, however, we take occasion to say that on the evidence presented in the record the trial court properly charged the jury that the rule of damages applicable to the case was the difference in value of plaintiff’s property before and after the trespass complained of. If, however, it should appear on another trial that his premises can be restored to their former condition at an expense less than the difference in value, that expense, together with an amount sufficient to compensate plaintiff for the loss of his water up to the time of restoration, if defendant restores the premises to their former condition in the meantime, will be the measure of plaintiff’s relief. We may also add that it was error to permit plaintiff to prove that he had planned or arranged to utilize his property for the purpose of supplying the citizens of Still-water with water. The availability of the property for that purpose was proper to be shown, but plaintiff’s plans in that direction should have been excluded.
We have examined all other assignments of error made the basis of the motion for a new trial, and find nothing requiring further mention.
Order affirmed.