Falsitta v. Metropolitan Life InsuranceFalsitta v. Metropolitan Life Insurance
Appeal from an order of the Supreme Court (Williams, J.), entered June 8, 2000 in Saratoga County, which denied plaintiffs’ motion for partial summary judgment on the issue of liability pursuant to Labor Law § 240 (1).
Plaintiff Jack Falsitta (hereinafter plaintiff), an electrician employed by Forest Electric Corporation, was working on an office tower building owned by defendant Metropolitan Life Insurance Company, Inc., which was undergoing an extensive renovation project. To manage the renovation project, Metropolitan hired defendant Structure Tone, Inc., which in turn hired defendant Regional Scaffolding Company, Inc. to erect and maintain personnel and material hoists. Credit Swiss/ First Boston, a future tenant of floors 19 through 28 of the office building, hired A.J. Contracting Company, Inc. to perform the necessary interior construction for its office space. A.J. Contracting hired Forest Electric to perform the electrical work with respect thereto. Plaintiff claims that he was injured on May 15, 1996 when, returning to the ground floor to have his lunch, the personnel hoist in which he was riding “free fell” twice, once for several floors, stopping abruptly, and again, a shorter distance, crashing against the springs at the bottom of the shaft. Plaintiff claims this action violently propelled him against the hoist walls and twice to the hoist floor, causing injury to his knee and back. As a result thereof, plaintiff and his wife, derivatively, commenced the instant action. Of the various causes of action asserted by plaintiffs, only their claim pursuant to Labor Law § 240 (1) is relevant to the three issues presented on this appeal.
The first issue is whether Supreme Court correctly determined that issues of fact prevented the granting of plaintiffs’
Moreover, plaintiffs’ reliance upon the establishment of accident and causal relationship by a Workers’ Compensation Law Judge is misplaced. This claim was asserted against plaintiff’s employer, and none of the defendants in this action had the opportunity to litigate those issues in that proceeding. Consequently, the principles of collateral estoppel are inapplicable (see, Gramatan Home Investors Corp. v Lopez,
Finally, Metropolitan, Structure and Regional all argue that had they received notice of the accident, they would have been required to, inter alia, investigate, perform repairs with respect to the personnel hoist as required and notify the appropriate Federal and city agencies of the incident. Since the record fails to contain any evidence suggesting that the foregoing steps were undertaken, genuine issues of fact exist concerning the occurrence and claimed injuries to plaintiff which preclude plaintiffs’ motion for partial summary judgment.
The second issue for resolution is whether Structure is potentially liable under Labor Law § 240 (1). Structure argues that, as a construction manager, it cannot be held responsible since it did not have the requisite supervision and control over the work in question. Labor Law § 240 (1) imposes strict liability for any breach of the duty imposed therein which proximately causes an injury (see, Nichols v Deer Run Investors,
Lastly, we address an issue not presented to Supreme Court concerning whether A.J. Contracting is liable to plaintiff. A.J. Contracting claims that because it was a prime contractor, without the authority to supervise, direct and control the work-site, hired by a future tenant and not by the owner of the building or any of its contractors, it cannot be held liable. Plaintiffs assert, in opposition, that A.J. Contracting is a general contractor, and that its status as a prime contractor for Credit Swiss/ First Boston was simply a legal fiction created to comport with the requirements of the New York City Industrial Development Agency to take advantage of certain tax incentives.
“[0]n a motion for summary judgment appellate courts may search the record and grant summary judgment to the non-moving, nonappealing party without the necessity of a cross motion or a cross appeal” (Sherba v Midstate Precast Sys.,
Crew III, J. P., Spain, Rose and Lahtinen, JJ., concur.