344 Mass. 179 | Mass. | 1962
This is an action of contract by Fall River . Line Pier, Inc. (Pier), against the railroad to recover quarterly rent of $6,000, for the period February 17 to May 16,1958, for pier premises leased to the railroad. The railroad filed a declaration in set-off asserting that Pier owed the railroad $4,536.98, with interest, for overpayment of rent for the preceding quarter. The only claim for jury trial was by Pier on the writ. Upon the filing of an auditor’s report, Pier insisted “upon its right to jury trial, previously claimed, and reserve [d] the right to introduce evidence of the [railroad’s] liability . . . under the . . . lease . . . dated May 17, 1948.” The case was tried to a jury. After the plaintiff had rested, the railroad’s counsel proceeded to read the auditor’s report. The judge ruled that “counsel [was] not to read anything in . . . [the] report concerning the counterclaim”
The auditor’s findings were as follows: On May 17, 1948, Pier, then “in control of . . . premises ... in Fall River,” leased a portion of these to the railroad at an annual rent of $24,000 payable quarterly in advance. Paragraph 17 of the lease reads, “If at any time during . . . this lease . . . the Commonwealth . . . or . . . [Pier] shall elect to extend their [p]ier development so as to include the demised premises . . . [Pier] shall at its expense furnish new facilities of equal capacity, including equivalent track and driveway facilities which . . . [the railroad] may continue to use in the operation of its business within the demised area or at a location satisfactory to the . . . [railroad], and these new facilities . . . must be made available ... so as to permit the uninterrupted . . . operation of the . . . business. . . . [T]hese new facilities will be leased to the . . . [railroad] under the same terms . . . herein contained covering the demised premises” (emphasis supplied).
On November 12, 1957, Pier mailed to the railroad a letter stating that Pier, in purported exercise of its rights under the lease, was starting new construction on the leased premises, that this construction would interfere immediately with the railroad’s use of tracks serving the demised building, and that the building would not have the use of any railroad sidings after December 1, 1957. This had the effect of depriving the railroad of essential attributes of the then leased building and would amount to constructive eviction (see Charles E. Burt, Inc. v. Seven Grand Corp. 340 Mass. 124,127, and authorities cited) unless the new premises, described below, offered to the railroad complied with par. 17.
Rent payments under the lease were made by the railroad in advance, including the payment due on November 17, 1957. The quarterly payment of $6,000 due on February 17, 1958, which Pier seeks to recover, was not made. The railroad claimed to have been constructively evicted on December 10, 1957, and by its declaration in set-off sought to recover a proportional part of the quarterly rent paid on November 17,1957. The auditor found for the railroad on Pier’s declaration and for the railroad on its declaration in set-off in the sum of $4,536.97 with interest.
Pier, at the trial before a jury, presented, among other matters, the additional evidence stated below. Pier operated in Fall River a pier which ran generally east and west. The pier, entered from the east side, was “more or less rectangular and was surrounded on the north, west, and south sides by water.” In 1957, there were two buildings on the pier, a small one story frame building, fifty years old, on the north side, and a larger marine terminal, built in 1955, on the south side.
The small building, then leased to the railroad, contained
There were no other tenants in this building.
The railroad, in 1957 and theretofore, placed freight cars on the tracks north of the smaller building to be loaded through the doors on that side. The cars would not be separated. There was no platform on the north side and freight was never unloaded from trucks on that side. “Operating from the smaller building it was necessary to discharge cargo on the south side, truck it through the building [where the railroad sorted and classified the freight] over a deteriorated wooden flooring on hand trucks and [have railroad employees] load it on . . . freight cars on the north side. ’ ’ This was a ‘ ‘ continuous operation. ’ ’
The floor of “the smaller building was approximately 18 inches from the ground and was thus 2% to 3% feet beneath the trucks from which cargo was unloaded. The distance from the north side of the smaller building to the freight car on the tracks was approximately five feet which necessitated the placing of a six foot plate from the building to the cars.” It took two men to handle this plate. The smaller building was not used for the storage of freight.
The two tracks on the north side of the smaller building joined each other east of the building and continued to the east as a single track. A short distance east of Pier’s premises, this single track passed an open shed used in 1957 for loading and unloading of freight.
The larger building (600 feet by 160 feet) is approximately 200 feet south of the smaller building. It has one spur track on its south side and two spur tracks on its north
The railroad in December, 1957, was offered 11,280 square feet of area at the larger building. Ninety-six hundred square feet of this area lay inside the building and there were 1,680 square feet of outdoor platform space. The space, so offered, would have been on the same rental terms in effect under the 1948 lease. There were no other tenants in this larger building in 1957, except Acme Fast Freight, Inc. (Acme), which during that year used the bays and three doors at the east end of the north side of the building.
At the north side of the larger building, freight cars could be put in, three cars on each track. They could then be separated, leaving openings between them, so that the trucks could back up to do their business.
A railroad employee was permitted to testify, over Pier’s objection, that in the larger building the railroad “couldn’t operate as efficiently or safely.” The testimony indicated that this was because of the impossibility of the same sort of continuous operation, as in the smaller building, the necessity of handbraking cars and separating them, and the possible interference by Acme with freedom of use of the spur tracks. Each time the railroad would “go in there, . . . [it] would have to make Acme stop loading, so that” the railroad could “put a switcher in.” Freight dropped on the platform north of the larger building would be exposed and would have to be “handle [d] ... a second time.”
1. Under par. 17, if the railroad is to be required to accept new facilities, these must be “of equal capacity, including equivalent track and driveway facilities.” These words refer to equal practical usefulness of the facilities in the railroad’s freight operations, for they must be facilities “which the . . . [railroad] may continue to use in the operation of its business within the demised area or at a location satisfactory to the” railroad. The provision does not purport to require that the new facilities be “satisfactory” to the railroad in any respect other than location. Premises within 200 feet of the old location can hardly reasonably be regarded as unsatisfactory because of location, if otherwise equal to the old. This is not a case where mere questions of taste affect whether the new facilities are of equal capacity. The railroad was bound to accept the new space, if that space had “equal capacity,” in the sense that it would reasonably meet the railroad’s operating needs and permit equally efficient performance of the same volume of operations (see Steel Storage & Elev. Constr. Co. v. Stock, 225 N. Y. 173, 176) without increased expense and inconvenience. It could not object on trivial and inconsequential grounds. See Hawkins v. Graham, 149 Mass. 284, 288; Salem Glass Co. v. Joseph Rugo, Inc. 343 Mass. 103, 105-106. See also Handy v. Bliss, 204 Mass. 513, 519-520; Rooney v. Weeks, 290 Mass. 18, 27; Williston, Contracts (3d ed.) § 675A, p. 204, § 675B. Compare Weinstein v. Miller, 249 Mass. 516, 518-519; Jacob & Youngs, Inc. v. Kent, 230 N. Y. 239, 243-244.
The auditor’s findings that the new facilities were not of
In the proposed quarters (1) the railroad would have 2,400 square feet less inside space than before; (2) it would occupy a small part of a large building (with access on one side only to the railroad’s quarters) rather than the whole of a small building (with access on all sides); and (3) it would have to share both the large building and its adjacent side tracks
We conclude that no evidence affords sufficient basis for a verdict contrary to the auditor’s findings. The fundamental disadvantages of lesser inside space, occupancy of only part of a large building, a different method of loading, and sharing of side track facilities cannot be disregarded. The evidence that the larger building had compensatory advantages does not furnish basis for a finding that the new facilities had capacity equal to that of the older building. For is such a finding warranted by the circumstances that Acme in 1957 rented 5,000 square feet in the larger building (three bays) and in 1960 conducted the same operation in the smaller building, which it formerly had conducted in the larger. This proof would not establish that the railroad would be able to conduct effectively the same business in six bays (9,600 square feet) of the new building plus some out
2. The plaintiff’s seasonable claim of jury trial (see G. L. c. 231, § 60; Rule 44 of the Superior Court [1954] ) applies also to the issues raised by the declaration in set-off. See G. L. c. 232, §§ 1, 8. Pier’s insistence upon jury trial (Rule 88 of the Superior Court [1954]) adequately preserved its rights to such a trial on the set-off issues. Also Pier’s reservation of “the right to introduce evidence of the liability of the . . . [railroad] under the . . . lease” was sufficient reservation of the right to offer evidence on the issue raised in set-off.
We have held that there was no evidence at the trial before the jury that would warrant a finding that the proposed new premises were of equal capacity to the old.
Exceptions overruled.
The bill of exceptions refers to the railroad’s claim based on alleged overpayment of rent as a ‘ counterclaim. ’ ’ Since this case is at law and not in equity, it is more appropriately described as a declaration in set-off. G. L. c. 232, §§ 1, 9. Buie 26 of the Superior Oourt (1954). Compare Buie 32.
One of these tracks was removed by Pier on December 8, 1957.
The spur tracks at the old buildiug, also, may have been subject to some interference (comparable to that caused by Acme’s presence in the larger building) because of loading and unloading at the small shed to the east of the older building.
The bill of exceptions shows that Pier offered no evidence at the trial before the jury speeifieaUy upon the set-off issues. The only evidence offered by Pier, and excluded, appears to have been excluded for reasons unconnected with the set-off matter. Exceptions to the exclusion of this evidence have not been argued.