547 F.2d 548 | Ct. Cl. | 1976
Lead Opinion
This case comes before the court on defendant’s exceptions, filed April 13, 1976, to the recommended decision of Trial Judge Lloyd Fletcher, filed January 29, 1976, pursuant to Rule 134(h), having been considered on the briefs and oral argument of counsel. Since the court agrees with the trial judge’s recommended decision, as hereinafter set forth, it hereby affirms and adopts the said decision as the basis for its judgment in this case.
OPINION OP TRIAL JUDGE
In this case of first impression, the plaintiff, Exxon Corporation, seeks to recover an alleged overpayment of federal corporate income taxes and assessed interest thereon for the taxable year 1954.
For the reasons discussed below, it is my opinion that the expenditures in question do qualify under the regulations as “intangible drilling and development costs” and, hence, are subject to the option, which Humble admittedly exercised, and were properly deducted as expense items in its 1954 return.
Most of. the facts are undisputed.
The building of these platforms and platform extensions involved several stages. First, they were designed by Humble engineers who prepared detailed plans and specifications from previously furnished information as to water depths, soil, wind, tide, and storm conditions experienced at the well site, coupled with other information as to the desired size of the deck area, weight, and location of drilling equipment, and number and depth of wells to be drilled. Secondly, through competitive bidding, Humble would then engage the services of a marine construction contractor, such as W. Horace Williams Company, whose job was to fabricate on land as much of the platform as was practicable. This land-phase portion
Upon completion of the work called for by the land-phase construction contract, the partially constructed platform was loaded on a barge for transport to the drilling site. At this point, the third or so-called “water phase” of the construction began, and it was performed under a separate contract. While in transit, further welding, cutting, and fitting work was performed on the platform pieces, again under the oversight of a Humble engineer and welding inspector, who lived aboard the barge during the water-phase construction. Upon completion of this work, the platform pieces were lifted from the barge, assembled, and anchored to the sea floor by use of a large floating crane. The deck parts were then positioned and the various drilling and other equipment was installed thereon. The termination of the water phase marked the completion of the platform’s construction, whereupon it was ready for drilling operations.
Of course, during these three phases of construction, numerous costs were incurred and paid by Humble. For example, during the design phase, Humble utilized its own engineers to design the required platforms and to draft the construction plans and specifications. Other Humble personnel from the Exploration Department were used to determine the most favorable locations for well sites, and, to this end, Humble often employed outside consulting engineers to obtain and furnish information regarding soil conditions in those areas.
The defendant has conceded that 'all costs for labor, fuel, repairs, hauling, and supplies incurred by Humble for the installation of the platform after it was lifted from the barge were subject to the option and currently deductible as intangible drilling and development costs. It contends, however, that such costs incurred prior to that time are not subject to the option because they were pre-installation expenditures by which Humble acquired what the regulation calls “tangible property ordinarily considered as having a salvage value.”
It is true that Humble would dismantle platforms at locations where no economically productive wells resulted from drilling operations. The dismantling generally occurred in the reverse order of the prior erection and assembly process.
Humble’s rejoinder to defendant’s salvage argument is simply that it raises a false and irrelevant issue. Humble points out that it always capitalized, and never expensed, the costs of the actual materials used in constructing the platforms, such as pipe, beams, and similar materials which are the only salvable items. The costs which it expensed were for items such as labor, fuel, etc., which in themselves do not have a salvage value and hence are clearly intangible drilling and development costs.
Since both parties agree that the resolution of this dispute requires an interpretation of Reg. 118, § 89.23 (m)-16, the starting point must be a quotation of the exact text of the regulation insofar as pertinent here. The pertinent parts thereof are as follows:
(a) Items chargeable to capital or to expense at taxpayer’s option:
(1) Option with respect to intangible drilling and development costs incurred by an operator (one who holds a working or operating interest in any tract or parcel of land either as a fee owner or under’ a lease or any other form of contract granting working or operating rights) in the development of oil and gas properties: All expenditures made by an operator for wages, fuel, repairs, hauling, supplies, etc., incident to and necessary*265 for tbe drilling of wells and the preparation of wells for the production of oil or gas, may, at the option of the operator, be deducted from gross income as an expense or charged to capital account. Such expenditures have for convenience been termed intangible drilling and development costs. They include the cost to operators of any drilling or development work (excluding amounts payable only out of production or the gross proceeds from production, and amounts properly allocable to cost of depreciable property) done for them by contractors under any form of contract, including turnkey contracts. Examples of items to which this option applies are, all amounts paid for labor, fuel, repairs, hauling, and supplies, or any of them, which are used (i) in the drilling, shooting, and cleaning of wells; (ii) in such clearing of ground, draining, road making, surveying, and geological works as are necessary in preparation for the drilling of wells; and (iii) in the construction of such derricks, tanks, pipelines, and other physical structures as are necessary for the drilling of wells and the preparation of wells for the production of oil or gas. In general, this option applies only to expenditures for those drilling and developing items which in themselves do not have a salvage value. For the purpose of this option, labor, fuel, repairs, hauling, supplies, etc., are not considered as having a salvage value, even though used in connection with the installation of physical property which has a salvage value.
* * # # ❖
(b) Recovery of optional items, if capitalized:
* * ❖ ❖ ❖
(2) Items returnable through depreciation: If the taxpayer charges such expenditures as fall within the option to capital account, the amounts so capitalized and not deducted as a loss are returnable through depreciation insofar as they are represented by physical property. Such expenditures are amounts paid for wages, fuel, repairs, hauling, supplies, etc., used in the installation of casing and equipment and in the construction on the property of derricks and other physical structures.
$ $ $ $ $
(c) Nonoptional items distinguished:
(1) Capital items: The option with respect to intangible drilling and development costs does not apply to expenditures by which the taxpayer acquires tangible property ordinarily considered as having a salvage value.*266 Examples of such items are the costs of the actual materials in those structures which are constructed in the wells and on the property, and the cost of drilling tools, pipe, casing, tubing, tanks, engines, boilers, machines, etc. The option does not apply to any expenditure for wages, fuel, repairs, hauling, supplies, etc., in connection with equipment, facilities, or structures, not incident to or necessary for the drilling of wells, such 'as structures for storing or treating oil or gas. These are capital items and are returnable through depreciation.
‡ $ $ $ $
“Intangible drilling and development costs” (hereinafter IDC) is a phrase peculiar to the law of oil and gas taxation and, in the words of the above regulation, is used only “for convenience.”
'Since the parties do not dispute that Humble was an “operator” entitled to make such election, that the offshore platforms are “physical structures,” that they are “necessary for the drilling of wells and the preparation of wells for the production of oil or gas,” and that the election was properly made, the controversy centers solely on whether the expenditures in question were for “labor, fuel, ¡repairs, hauling, and supplies * * * used * * * in the construction” of offshore platforms, within the meaning of the regulation.
Singularly enough, both parties rely solely on the language of the regulation in formulating their positions, and the result has been aptly described by defendant as “the pervasive semantical differences which exist in this case.” Tracking the language of the regulation, plaintiff argues that all construction costs (including land costs) for items which in and of themselves have no salvage value (e.g., labor, fuel, etc.)
The defendant interprets the regulation differently but likewise directly from its wording. In the Government’s view the examples given of items within and without the option create three major categories of construction-type costs, all of which do not qualify as IDC. First, there is the category of expenditures which are “used * * * in the construction of physical structures * * * which in themselves do not have a salvage value.” These admittedly qualify as IDC. There is then a second category comprised of expenditures for labor, fuel, etc. “by which the taxpayer acquires tangible property ordinarily considered as having a salvage value.” (Emphasis added.) These acquisition expenditures, in the Government’s view, do not qualify for the option. Finally, there is a third category of expenditures for labor, fuel, etc. “used in connection with the installation of physical property which has a salvage value,” and these are qualified IDC.
It is in this last category that the Government has placed a considerable portion of the water-phase costs and allowed them to be deducted as IDC. However, the Government argues that all expenditures by Humble prior to the commencement of the water phase, and a portion thereafter, were expenditures by which Humble acquired property having a salvage value, i.e., the platform and its components. This classification of all land expenditures and a portion of the water-phase expenditures as acquisition costs is crucial to
At the'outset, it may be instructive to note briefly the history of the IDC option. Although it has been available to oil and gas operators since 1917, it did not originate from any specific statutory provision but rather from Treasury Department action in the form of regulations. Despite this somewhat unusual genesis, no serious attack on the validity of the option was made. But in 1945, the Fifth Circuit Court of Appeals severely restricted the coverage of the regulation to the consternation of the oil industry. F. H. E. Oil Co. v. Commissioner, 147 F. 2d 1002, rehearing denied in 149 F. 2d 238 and again in 150 F. 2d 857 (5th Cir., 1945). This decision seemingly prompted the adoption by Congress of Concurrent Resolution 50, 79th Cong., 1st Sess., 59 Stat. 844 (1945) reading in its entirety as follows:
Resolved by the House of Representatives (the Senate concurring), That in the public interest the Congress hereby declares that by the reenactment, in the various revenue Acts beginning with the Bevenue Act of 1918, of the provisions of section 23 of the Internal Bevenue Code and of the corresponding sections of prior revenue Acts allowing a deduction for ordinary and necessary business expenses, and by the enactment of the provisions of section 711(b) (1) of the Internal Bevenue Code relating to the deduction for intangible drilling and development costs in the case of oil and gas wells, the Congress has recognized and approved the provisions of section 29.23 (m)-16 of Treasury Begulations 111 and the corresponding provisions of prior Treasury Begula-tions granting the option to deduct as expenses such intangible drilling and development costs.
Passed July 21,1945.
Congress did not thereafter revisit the IDC option until 1954 when a new Internal Bevenue Code was under consideration. At that time there was added to what became the Internal Bevenue Code of 1954 a new provision designated Section 263 (c) reading as follows:
(c) Intangible drilling and development costs in the case of oil and gas wells. — Notwithstanding subsection (a), regulations shall be prescribed by the Secretary or his delegate under this subtitle corresponding to the*269 regulations which, granted the option to deduct as expenses intangible drilling and development costs in the case of oil and gas wells and which were recognized and approved by the Congress in House Concurrent Resolution 50, Seventy-ninth Congress. 26 TJ.S.'C. § 263 (c) .9
From this statutory and administrative history of the IDC option, Circuit Judge (now Mr. Justice) Blackmun, speaking for a unanimous court in Harper Oil Company v. United States was able to conclude at 425 F. 2d 1335, 1342 (10th Cir.1970):
The option, although long possessed of dubious statutory ancestry, now has firm congressional authority in § 263 (c) of the 1954 Code.
This brief account of the option’s history has been stated as a prelude to the conclusion that Congress has consistently
These background observations show that the courts should not be niggardly in their approach to Reg. 118, § 39.23(m)-16. Otherwise, there is always the danger of becoming far too busy with the trees to see the forest. Equally important, however, is the realization that dealing with some of the “chameleon-hued words”
All expenditures made by an operator for wages, fuel, repairs, hauling, supplies, etc., incident to and necessary for the drilling of wells and the preparation of wells for the production of oil or gas, may, at the option of the operator, be deducted from gross income as an expense or charged to capital account.
The regulation then goes on to place two conditions on the optional expensing of these cost items, namely, (1) they must -have been incurred “in the construction of such derricks, tanks, pipelines and other physical structures as are necessary for the drilling of wells and the preparation of wells for the production of oil or gas,” and (2) they must not in and of themselves “have a salvage value.”
The record in this case shows that, from time to time, plaintiff has recovered some materials from salvaged platforms which it reconditioned and used in other platforms. This fact is immaterial, however, because the regulation also makes it clear that of the several costs enumerated above:
* * * labor, fuel, repairs, hauling, supplies, etc., are not considered as having a salvage value, even though used in connection with the installation of physical property which has a salvage value. [Emphasis supplied.]
But not so, says the defendant. Pointing to the use of the word “installation” in the sentence of the regulation last quoted above, defendant concludes that the scope of the IDC option has been specifically limited so that only those expenditures incurred in the course of installing the constructed property at the well site are deductible. This interpretation excludes from the option all expenditures made in the construction of physical property at a place other than the well site no matter how necessary such pre-installation construction may have been to the drilling and preparation of the well. Such emasculation of a long-standing regulation, recognized and approved by Congress in § 263(c), supra, simply cannot be sustained.
In seizing upon this isolated word “installation” as controlling the entire operation of the regulation, defendant has grossly misread its own language. The obvious reason for the clause in question is to eliminate a possible contention that the option-type expenditures (labor, fuel, etc.) acquire a salvage value simply because they were connected with the installation of admittedly salvable property. Thus, as plaintiff correctly observes, the clause in no way restricts the application of the regulation but instead expands it to include a situation where option-type expenditures can be related to salvable property without losing their own characterization as nonsalvable items.
In the process of advancing its impoverished interpretation, the defendant quite naturally has attempted to present it in respectable attire. Citing such authoritative decisions as Commissioner v. Idaho Power Co., 418 U.S. 1 (1974) and Southern Natural Gas Co. v. United States, 188 Ct. Cl. 302,
Reliance on these cases for such a well-established rule of tax law illustrates the poverty of defendant’s argument and reveals to what extent it would mutilate the specific exception to the general rule as spelled out in Reg. 118, § 39.23 (m) - 16. Those cases involved Code § 263(a) (or a predecessor section) providing that “no deduction shall be allowed for * * * any amount paid out for new buildings * * * or betterments made to increase the value of any property * * *” In contrast, § 263(c), which adopted by reference the longstanding IDC option to deduct or capitalize such costs, is an express exception to § 263(a) and provides a choice between deduction and capitalization “notwithstanding subsection (a).” Neither section 263(c), nor the implementing regulation, was involved in the cited cases. Apparently, defendant simply refuses to recognize that the IDC deduction was intended to and does deviate significantly from the usual rules of capitalization as epitomized by § 263 (a).
Next, defendant rather surprisingly relies on the decision in Harper Oil Co., supra. The dispute there was over whether “surface casing,” which is steel pipe installed in the well to prevent water contamination and surface caving, qualified for the IDC option. The taxpayer argued that such casing did qualify because it was cemented into the ground, could not be removed under Oklahoma law, and thus had no salvage value. The Tenth Circuit disagreed and held that the cost of casing, specifically described by subsection (c) of the regulation as a nonoptional item, remained such even though under the particular circumstances the casing could not, in fact, be salvaged. Plaintiff, of course, finds no fault with this decision since it has never contended that any of its costs specifically described by the regulation as nonoptional items (such as “actual materials” or “casing”) can qualify for the
* * * One might expect an expenditure for tangible hard goods, such as surface-casing, or any casing for that matter, not ordinarily to qualify as an “intangible” drilling or development cost. Standing in contrast, and qualifying, would he an appropriate labor or services cost. [Emphasis supplied.]
Defendant’s final point with respect to its salvage argument is that 'an offshore drilling platform becomes completely salvaged at the instant of an oil or gas “strike” which has the effect of converting the structure from a drilling facility to a production facility. While it is true that by the express terms of the regulation the IDC option is available only for the enumerated costs incurred during the “drilling” and “preparation” stages, it is a monstrous step to the defendant’s conclusion that “total salvage” of the entire facility occurs at the moment the oil string of casing reaches the oil trap in the producing sands. This would mean, of course, that no costs relating to a platform are deductible because they all 'have salvage value as part of a production facility. Yet, inconsistently with its argument, defendant concedes that 'hauling and installation costs are optional expenditures. Therefore, to accept such an argument would only “lead to possible inconsistencies and certainly to taxpayer and administrative confusion.” Harper Oil Co., supra, at 1343.
In addition, as plaintiff cogently points out, the argument is directly contrary to Treas. Reg. § 1.167 (a)-1(c) (and predecessor authorities) which provides that salvage occurs only “upon sale or other disposition of an asset when it is no longer useful in the taxpayer’s trade or business or in the production of his income and is to be retired from service by the taxpayer.” Clearly, plaintiff’s further utilization of platforms in the 'production of oil and gas is totally incompatible with the platforms being “retired from service” and “no longer useful in the taxpayer’s business.”
If, by the statement quoted above, defendant means to infer that the only deductible expenditures are those incurred during the “drilling phase” at the well site itself, then defendant is plainly wrong. In this connection, defendant has stated at pp. 22-23 of its main brief:
* * * The costs of fabricating derricks, which were purchased by the taxpayer in a prefabricated state as “a derrick”, have never been considered as being allowed by the Regulations, and the taxpayer does not suggest otherwise.
In fact, however, plaintiff does “suggest otherwise.” It vigorously, and correctly, attacks defendant’s statement as “unsupported,” and points to those provisions of the regulation which clearly state that the regulation covers optional expenses incurred by “contractors under any form of contract” and which specifically give as examples of deductible costs those “amounts paid for labor, fuel, repairs, hauling, and supplies, or any of them which are used * * * in the construction of such derricks * * * as are necessary for the drilling of wells and the preparation of wells for the production of
In sum, then, it must be concluded that the restrictive interpretation given to Reg. 118, § 39.23 (m)-16 by the Government as reflected in Rev. Rul. 70-596, supra,
Hence, Exxon is entitled to recover. The record indicates no dispute as to the amount of costs at issue, but to the extent disagreement should arise, determination of the exact amount of recovery will be made in further proceedings as contemplated by Kule 131 (c).
The concurring opinions of Judges Davis, Bennett and Kunzig and the concurring in part and dissenting in part opinion of Judge Kashiwa follow tlie opinion of the trial judge which has been adopted by the court.
The precise tax period in question is January 1, 1954 through November 11, 1954. The remainder of the calendar year, not here in issue, was reported on a consolidated return.
26 U.S.C. § 263(c). It has been noted that this option, although long available, was not clearly authorized by statute until the enactment of the Internal Revenue Code of 1954, and that its “history is a curious one, indeed.” Harper Oil Company v. United States, 425 F. 2d 1335, 1338 (10th Cir., 1970).
They are here summarized only. The detailed facts are set forth In the Findings of Fact below.
A templet-type platform may be described generally as a large deck area, on which are mounted derricks and various other drilling paraphernalia, all supported above sea level by “templets”, which are compound, trussed structures, analogous in function to table legs but composed of several large vertical steel beams and pipes (usually an even number) arranged in a rectangular fashion with bars running between the pipes for support and spacing. Several templets are ordinarily used to support one deck, the number depending on the size, weight, and other features of the deck and equipment to be Installed thereon.
The material to be supplies by Humble was recorded on a list furnished to the contractor which designated whether the materials so listed were new or had been salvaged from other platforms.
In addition to salvaging such materials as it could, Humble had other reasons for dismantling and removing unproductive platforms instead of simply leaving them in the water. Since Humble knew it could be directed by the Army District to remove a platform upon expiration of its permit in order to reduce navigational hazards posed by the platform, it elected to do so as soon as the platform ceased to be useful. Humble also recognized that by removing an unproductive platform as soon as possible and even prior to expiration of the permit, it could thereby avoid the substantial costs of maintaining navigational aids as required by the United States Coast Guard. Humble’s exposure to liability for damages resulting from possible ship collisions with the structures was also reduced by early dismantling.
The use of such shorthand descriptions is, of course, a well-known technique in tax law. Consider, for example, such phrases as “spin-off,” “collapsible corporation,” “ABC transaction,” “Clifford trust,” and many others, all unique to taxation with no common law significance.
It is undisputed that the availability of the option is not impaired by the fact that Humble contracted out both the land and water phases of the work to an independent contractor.
There is very little in the legislative history of the 1954 Code with respect to reasons for enactment of new § 263(c). The House Ways and Means Committee report (H. Rep. No. 1337 83d Cong. 2d Sess.) says nothing at all. The Senate Report notes that the House bill made no changes in prior law and that the Senate Finance Committee “has added an amendment to make it clear that the provisions of the bill do not affect the treatment now allowed by regulations [i.e. Reg. 118, § 39.23 (m)-16] relating to the deduction or capitalization of intangible drilling and development costs in the case of oil and gas.” S. Rep. No. 1662, 83d Cong., 2d Sess. p. 81 (1954). Likewise the hearings before both Committees disclose nothing particularly helpful in interpreting the regulations.
The predecessor and successor regulations to the one here in question are almost identical and little is to be gained from a comparison of the several versions. Compare Reg. 111, § 29.23(m)-16 (1943) with Reg. 118, § 39.23 (m)-16 (1951) and with Reg. §§ 1.263(e)-1 and 1.612-4 (1965).
Those commentators who have specifically addressed the question of offshore platform IDC are in disagreement among themselves. See, for example, Breeding, Burke & Burton, Income Taxation of Natural Resources, § 14.12 (1972) (offshore platform IDC not deductible) ; Baum, Intangible Drilling and Development Costs: Some Recurring Problems, 21st Inst, on Oil & Gas L. Tax. 337, 344 (1970) (IDC deductible) ; Klayman, The New Intangible Drilling and Development Regulations and Their Implications, 25 N.Y.U. Tax Inst. 99, 101 (1967) (IDC partially deductible) ; Andersen & Co., Oil and Gas Federal Income Tax Manual (8th ed.) (1960) pp. 328-9 (IDC deductible). In 1969, Miller noted the absence of court decisions and published rulings on offshore platform IDC, although in the 1974 edition of his book he reported the issuance of Rev. Rul. 70-596, the correctness of which is presently in issue. Miller, Oil & Gas Federal Income Taxation § 20-32 (1969 and 1974).
For general discussions of IDC in their various ramifications, see also Bennion, Intangible Drilling and Development Costs: The Final Regulations, 15 Tul. Tax Inst. 665 (1965); Fiske, Federal Taxation of Oil and Gas, 5 Oil & Gas Tax Q. 83 (1956); Fielder, The Option to Deduct Intangible Drilling and Development Costs, 33 Tex L. Rev. 825 (1955); Miller, The Intangible Drilling Deduction, 100 J. Acc. 40 (Sept. 1955); Jackson, Taw Planning Before Drilling: The Operator’s Problem, 27 Tul. L. Rev. 21 (1952); Judge, Problems of the Oil and Gas Industry: Federal Income Tax Problems, 9 N.Y.U. Tax Inst. 453 (1951); and Mahin, Deduction for Intangibles, 2d Inst. on Oil & Gas Tax L. 367 (1951).
By providing an immediate “write-off” of expenditures normally capitalized and amortized over a period of time, the deduction theoretically reduces or otherwise offsets the well-known risks of providing capital for oil and gas exploration. See, generally, Jackson, Tax Planning Before Drilling: The Operator’s Problem, 27 Tul. L. Rev. 21 (1952) (concluding that, on the average, 60 percent or more of the costs of a producing well are IDC, and that the deduction is allowed to induce the risking of such capital). See, also, Murray, Intangible Drilling and Development Costs of Oil and Gas Wells, 26 Taxes 312, 316 (1948) (stating that a major purpose of the option privilege is to provide an offset to the “considerable risks involved in drilling”).
in passing, it may be noted that when an opportunity arose to undercut or abolish the drilling incentives provided by the option, Congress did not do so. See 1939 Code, § 711(b) (1) (I), of the now repealed Excess Profits Tax of 1940. By providing therein that IDC deductions would be disallowed only if “abnormal” or otherwise excessive for the previous four years, Congress appears to have affirmed its policy of encouraging the risking of capital in drilling operations.
See Hohfeld, Fundamental Legal Conceptions, p. 35 (1923).
The estimated revenue loss attributable to expensing IDC in the Budget for F.X. 1968 was $300,000,000. In the Budget for F.X. 1976 the estimate had increased to $1,365,000,000. For an erudite discussion of the policy of using tax incentives to achieve non-tax goals, see Surrey, Tax Incentives as a Device for Implementing Government Policy, 83 Harv. L. Rev. 705 (1970).
As previously noted, Humble did not expense such costs but charged them to capital account.
The Treasury’s issuance of a regulation followed on hy a later refusal to apply it where to do so would result in the collection of less revenue has been referred to by a respected commentator as “bizarre administrative behavior.” Bisenstein, A Critical View of the Treasury, 15 N.Y.U. Inst. on Fed. Tax 21, 30 (1956).
“When I use a word,” Humpty Dumpty said in a rather scornful tone, “it means just -what I choose it to mean — neither more nor less.” Carroll, Through the Looking Glass, Dial Press Ed., p. 238.
We are reminded in tRe “Introduction” to eacli issue of tRe Internal Revenue Bulletin tRat tRe Revenue Rulings puRlisRed tRerein “do not Rave tRe force and effect of Treasury Department Regulations * * *”
Concurrence Opinion
concurring:
Although I do not find the result in this case to be absolutely clear, I agree with Trial Judge Fletcher’s conclusion
Defendant emphasizes the term “installation” in one sentence
Similarly, the other sentence on which the Government mainly relies
Perhaps the regulation, which was formulated before offshore drilling was foreseen, is too all-embracing for current conditions. Perhaps it should be narrowed as defendant wishes. If so, the proper method is by prospective amendment of the regulation or by legislation, not by an attempt
“For the purpose of this option, labor, fuel, repairs, hauling, supplies, etc., are not considered as having a salvage value, even though used in connection with the installation of physical property which has a salvage value.”
“The option with respect to intangible drilling and development costs does not apply to expenditures by which the taxpayer acquires tangible property ordinarily considered as having a salvage value.”
So far as ive have been informed, there is no indication of any IRS practice, prior to the emergence of the off-shore problem, of excluding from optional coverage any intangible drilling and development costs connected with the fabrication or construction of land-based derricks or other drilling equipment.
Concurrence Opinion
concurring:
While I agree with Trial Judge Fletcher’s result and join in the concurring opinion of Judge Davis, I believe a further comment is in order. A strong reason, not elsewhere articulated, for interpreting the regulation as the trial judge and plaintiff would have us read it is that their interpretation is workable. Defendant’s reading of the regulation, on the other hand, would present substantial difficulties in the administration of the tax laws. The court should not strain to reach an interpretation, not clearly compelled, that would have such a result. Commissioner v. Brown, 380 U.S. 563, 571 (1965); Steuer v. United States, 207 Ct. Cl. 282, 294 (1975); Kantor v. United States, 205 Ct. Cl. 1, 6 (1974). There is considerable appeal in defendant’s view of the regulation, for the theory that it ascribes to the regulation’s accounting scheme is familiar: one-time expenditures for items that contribute to the construction of platform components with continuing value should 'be capitalized and depreciated, rather than ex-pensed. If, however, certain otherwise intangible drilling costs are to be capitalized, according to defendant’s theory, it would become necessary to determine exactly what components of the final assembly could be saved as they are and subsequently reused. This would not be an easy exercise.
The trial judge pointed out that each platform in the present case was designed to accommodate ocean depth and current conditions at the proposed drilling site. This immediately leads one to suspect that platform component subassem-blies are not uniformly salvable. In this case, one platform was dismantled and its parts stored in roughly their state of assembly at the completion of the land-phase construction stage. Does this warrant the conclusion that all platform
Were we to follow defendant’s reading of the regulation, the accounting for each platform would potentially revolve about fact problems not at all readily resolved or resolvable. Considering the number of platforms built (with changing technology) by a variety of drilling operators since 1954, and yet to be built, the problem takes on staggering proportions. For the added reason that defendant’s interpretation of the regulation would be altogether cumbersome in application for the taxpayer, the IRS, and for the courts when the first two cannot agree, the court does well to avoid that interpretation and to stand by the reading that it adopts.
Concurrence in Part
concurring in part and dissenting in part:
In this case of offshore drilling operations, the majority of the court by affirming and adopting the trial judge’s recommended decision allows as intangible drilling and development costs (“IDC”) those costs incurred in fabricating-offshore drilling platforms (“platforms”), moving them to location and making them operational. I, however, would allow only the latter two groups of expenditures to qualify for the IDC option, denying the option to those costs incurred in fabricating the component parts (e.g., templets)
With relation to the IDC problem before us, I believe that the goal is to determine which costs are attributable to an item having a salvage value and which costs are attributable to wages, fuel, repairs, hauling and supplies incurred in using that item for the drilling of wells or their preparation for production.
Each 1954 platform was individually designed for a specific location to take account of the peculiarities of that location ; however, the basic concept and design was a templet-
The fabrication process was the manner by which Humble acquired the templet unit. During the fabrication process of this basic templet unit, labor, fuel and supplies were integrated with tangible basic materials to form an item. The item, a 'basic templet unit, was designed to be salvaged.
The fact that dismantling and salvaging of platforms was a difficult operation and that during the salvage operation parts of the platform were badly damaged while other parts were not salvaged at all does not affect the IDC option. In the words of Justice Blackmun:
The salvage value reference29 [Keg. § 1.612-4(c) (1) (1965)] strikes us only as the usual, but not the necessary, characteristic of the non-option item. We do not regard salvage value 'as a condition of non-option status. [Footnote supplied.] [Harper Oil Co. v. United States, 425 F. 2d 1335, 1342 (10th Cir. 1970).]
Since the templets were designed to be salvaged as a component part in unit form, they ordinarily would be considered as having a salvage value without regard to the frequency of actual salvage or the actual reasons therefor. Nevertheless, as the trial judge found, “after considerable modification and reconditioning, most of the salvaged parts of [the platform] * * * were reusable at least once in other platforms.”
I do not feel that a complete reading of the pertinent Regulations, in light of their history, provides support for the trial judge’s decision within the intent of the drafters of the Regulations.
The IDC option first saw light in T.D. 2447, relating to the Revenue Act of 1916, and read as follows:
The incidental expenses of drilling wells, that is, such expenses as are paid for wages, fuel, repairs, etc., which do not necessarily enter into and form a part of the capital invested or property account, may, at the option of the individual or corporation owning and operating the property, be charged to property account subject to depreciation or be deducted from gross income as an operating expense. [Emphasis supplied.]
The Treasury language was a cautious venture into the field, granting the option in guarded terms. The option was similarly stated, though in more detail, in the regulations
In 1932, Treasury Decision 4333
In 1945 Congress passed Concurrent Resolution 50,
This brief account of the history of the IDC option is important with respect to an interpretation of Reg. 118 provisions here in issue.
The drafters of the regulations, as above shown, have consistently demonstrated an intent to qualify for the IDC option those costs which are “incidental expenses,” costs which do not “enter into and form a part of the capital invested or property account,” and costs “which in themselves do not have a salvage vlue.” In other words, expenditures by which the taxpayer does not require “tangible property ordinarily considered as having a salvage value” have been the recurring theme to determine qualification of expenditures for the IDC option.
The relevant provisions, as applied to the instant case, of Treas. Reg. 118, construed in light of the drafters’ apparent overall goal, set forth the task to determine which costs are
Although the trial judge acknowledges that the basic component units of the platform do have a salvage value,
To buttress his conclusion that the costs incurred during fabrication of the basic component units do not have salvage value and thereby qualify for the IDC option, the trial judge quotes from the Harper Oil decision.
The trial judge also placed great reliance upon the sentence in the regulations which reads:
For the purpose of this option, labor, fuel, repairs, hauling, supplies, etc., are not considered as having a salvage value, even though used in connection with the installation of physical property which has a salvage value.
The trial judge correctly reasons that:
* * * [t]he obvious reason for the clause in cfuestion is to eliminate a possible contention that the option-type expenditures (labor, fuel, etc.) acquire a salvage value because they were connected with the installation of admittedly salvable property. * * * [T]he clause in no way restricts the application of the regulation but instead expands it to include a situation where option-type expenditures can be related to salvable property without losing their own characterization as nonsalvable items. [At page 272.]
However, by focusing on the tangible basic materials instead of the salvageable basic component units of the platform, the trial judge, in my opinion, incorrectly concludes that Humble installed “lengths of pipe and steel beams.” On the contrary, Humble installed the basic component unit. Consistent with
In order to support his conclusion that the above-quoted regulation sentence brings fabrication as well as installation costs within the IDC option, the trial judge reasons that the drafters intended the word “installation” to expand the coverage of the IDC option to include “option-type expenditures [which] can be related to salvable property without losing their own characterization as nonsalvable items.” Consistent with the trial judge’s reasoning, the quoted sentence “expands” the coverage of the regulation only insofar as it assures that the immediately preceding regulation sentence
Another critical inquiry in this case is the proper meaning to be attributed to the words “in themselves.”
In at least three separate places in the Eegulations in issue, installation costs are singled out for favorable treatment. Thus, the Eegulations distinguish between those costs incurred in the installation of physical property and those costs incurred in acquiring the tangible items being installed. The labor, fuel, etc., used in erecting the platform structure, or in transporting the structure to the drilling site, add no value to the structure which can be salvaged when the drilling operation is completed and, hence, do not “in themselves” have salvage value. On the other hand, labor, fuel, etc., used in fabricating the salvageable components of such a structure
It should be noted that the IDC option remains, as it has been since its birth, an addendum to the general capitalization principle enunciated by § 263(a). Harper Oil, supra at 1342. Capitalization of this kind of cost is the rule and ex-pensing the exception. The deduction afforded by § 263(c) is not a matter of right; rather, it is a matter of legislative grace. The deduction must be authorized by “clear provision.” And it is the taxpayer who has the burden of demonstrating that he is entitled to the deduction. Harper Oil, supra at 1342; New Colonial Ice Co. v. Helvering, 292 U.S. 435, 440 (1934); Deputy v. duPont, 308 U.S. 488, 493 (1940); United States v. Olympic Radio & Television, Inc., 349 U.S. 232, 235 (1955); New World Life Ins. Co. v. United States, 88 Ct. Cl. 405, 26 F. Supp. 444 (1939); Mayer v. United States, 126 Ct. Cl. 1, 111 F. Supp. 251 (1953). In my opinion, the taxpayer in the instant case has failed to demonstrate by pointing to a clear provision in the regulations that it is entitled to deduct via the IDC option those costs incurred while fabricating the basic component units of its drilling platform. For the foregoing reasons, I am firmly convinced that the costs of fabricating the basic templet -units, a necessary component part in the templet-type platform used by Humble during the tax years in question, are not subject to the IDC option.
FINDINGS OF FACT
1. The plaintiff, Exxon Corporation (Exxon), is a Delaware corporation engaged in substantially all phases of the petroleum and petrochemical businesses, including exploration, development, production, refining, transportation, and marketing.
2. During 1954, Humble built in the Gulf of Mexico offshore oil drilling and production platforms. These offshore platforms were numbered by Humble 797E, 797F, 798D, 804G, 820E, and 1428B. An extension was added to platform 820E later in 1954. Also extended in 1954 was a seventh platform, number 802C, which had been built prior to 1954. These platforms were located on numbered leases which leases conveyed to Humble an operating interest in the territory subject thereto.
3. These offshore platforms and extensions thereof were necessary for drilling wells in the seabed and thereafter preparing the drilled wells for the production of oil and gas. The platform extensions were built to permit the drilling of wells in excess of the number for Which the platform had originally been designed. Whenever a well drilled from an offshore platform proved productive, the platform remained at the location of the well and was thereafter used for production purposes. All of the platforms and platform extensions mentioned above with the exception of platform 1428B,
4. The amounts in issue, which Humble deducted on its 1954 Federal income tax return pursuant to an election to deduct all “intangible drilling and development costs”, are the costs incurred by Humble for wages, fuel, repairs, hauling, and supplies during the land-phase and water-phase construction of these platforms and platform extensions. However, a portion of the construction costs incurred by Humble (for wages, fuel, repairs, hauling, and supplies) in building offshore platforms are not in issue; the defendant does not contest that Humble properly deducted as intangible drilling and development costs all of its water-phase construction costs incurred after the partially constructed parts of a platform, and related materials, were lifted by crane from the construction barge. These latter construction costs were classified by the examining agent as currently deductible “erection” costs, in contrast to the earlier construction costs classified by the agent as non-deductible “fabrication” costs. Accordingly, the water-phase construction costs in issue are the costs incurred before the platform pieces and related materials were lifted by crane. The costs of the actual materials in the platforms, such as lengths of pipe and steel beams, were not deducted by Humble on its 1954 Federal income tax return and, accordingly, are not in issue. The dollar amounts of expenditures in issue per platform are as follows:
5. Humble’s Exploration Department selected the drilling site for each of the offshore platforms. Information as to each selected site location was transmitted to Humble engineers in its Operations Division which was charged with
6. Thereafter Humble engineers prepared all detailed plans and specifications for each platform or platform extension to be constructed. In the course of these preparations, there was correspondence among Humble engineers in the Headquarters Production Department located in Houston, Texas, Humble engineers in the Louisiana Division Office located in New Orleans, Louisiana, and Humble engineers in the Humble District Office located at Grand Isle, Louisiana. In 1954 the basic design work was performed in Houston by the Office of the Chief Civil Engineer in the Headquarters Production Department. The actual plans, construction specifications, and construction drawings were prepared by the Louisiana Division Office in New Orleans, but any design changes or modifications proposed by the Louisiana Division Office were reviewed and either approved or disapproved by the Headquarters Production Department in Houston.
7. Each platform in 1954 was individually designed specifically to take account of various factors pertinent to the particular site location. 'See finding 5, supra. Recognition of these factors, which varied from one site location to another, necessitated some design -differences between platforms at different locations. Examples of the differences actually occurring among the 1954 platforms and platform extensions include (a) the number of templets which provided hori
8. Although the 1954 platforms were designed for a specific location and to take account of the peculiarities of that location, the basic concept and design of a templet-type offshore platform in 1954 had been standardized. The original concept, was developed by W. Horace Williams Company, Inc. (hereinafter “Williams”), and in 1947, through the joint efforts of Humble and Williams personnel, Humble erected -the first operational templet-type platform in the Gulf of Mexico. There were other types of offshore structures used by oil companies in 1954 such as caissons and jacket type platforms. Caissons are large, installed single pipes, used for purposes other than drilling. Jacket-type platforms utilize a single-trussed structure (rather than several trussed structures, such as templet-type platforms) for vertical support and are suitable mainly for use in shallow water. All platforms built or extended' by Humble in 1954 were templet-type platforms.
9. The platform construction process was divided into two stages referred to as the “land phase” and the “water phase.” Humble did not employ its own personnel to perform either the land phase or water phase construction, because it was uneconomical to maintain a continuing labor force for these purposes. Therefore, Humble engaged independent contractors to perform the actual construction of its platforms.
10. Humble selected its independent construction contractors by writing to various construction companies requesting bids. Such invitations for bids were generally sent to Williams, to J. Ray McDermott Company of Assumption Parish, Louisiana, and to Brown & Root, Inc. of Plaquemines
Attached to the invitations were the plans and specifications for the platform involved which had been prepared by Humble engineers, as above described. Also attached were sample contracts and a list of materials to be supplied by Humble. Generally, this Humble-supplied material consisted of structural goods such as the heavier steel beams and larger sizes of pipe. The list of material further indicated whether the material furnished by Humble was new or second class (salvaged).
11. Upon receipt of an invitation to bid, Williams’ personnel estimated the costs which would be incurred in performing both the land and water phase contracts. Williams then submitted its bids to Humble, whose engineers analyzed the elements of the cost estimates for each bid. The analysis would set forth for each land phase contract the costs of materials to be furnished by Humble and of those to be furnished by Williams, the costs of performing the land phase prefabrication work on the platform components, the costs of loading the platform components onto barges for transportation to the offshore site, and the amount of the contractor’s overhead and profit. Included in the analysis of the land phase estimate for costs of performing the land phase prefabrication would be a detailing of costs for labor, fuel, repairs, supplies, and hauling incurred by the contractor. These detailed costs would reflect both direct and indirect costs. An analysis would also be made for each water phase contract on a similar basis. The water phase analysis would set forth a breakdown of direct and indirect costs for materials, transportation, labor, insurance, and the contractor’s fee.
12. It was customary for separate contracts to be entered into for the land and water phases of each platform or platform extension. The land phase contract was typically a fixed-price contract while the water phase contract was a cost-plus-fixed-fee contract. A cost-plus-fixed-fee contract
With the exception of one platform, Williams was awarded the land and water contracts for all platforms and platform extensions built during 1954. Hunt Tool Company was awarded the land contract for platform 797F.
13. A typical land phase contract in 1954 contained the following language:
Contractor agrees to begin immediately and to press with due diligence until completion in a good and workmanlike manner with the necessary plant facilities, supervision, crews, tools, machinery and equipment furnished and maintained by Contractor at his own cost and expense the erection, fabrication or construction of the parts in accordance with the plans and specifications agreed to by Contractor and Humble, of one (1) marine type offshore drilling structure with spud piles * * * for use at a well location known as Grade Isle * * * on (the) Gulf of Mexico. It is the intention of the parties hereto that Contractor shall, under this contract, prefabricate as much of the platform and shall perform as much of the actual work towards the building of said platform as may be possible and consistent with good engineering practice towards the end that the least amount of work for the erection of this platform will remain to be done under the Water Phase of the job which is covered by a separate contract. When completed, Contractor agrees to load all of the parts of such structure into barges furnished by Contractor at Contractor’s terminal and to make same ready for transportation to the well location.
The specifications, * * * and the plans * * * according to which the Contractor is to fabricate and construct such parts are attached hereto and made a part hereof for all purposes * * *
H» H* *f» «í»
Humble has in stock and will make available to Contractor at New Orleans, Louisiana, certain material, templets, structural steel and steel pipe. From this material it has been agreed between the parties that Contractor shall employ the items and the quantities which are specified in Material Inventory List attached hereto.
*296 Upon notice from Contractor to Humble that all of the structural parts have 'been completed in accordance with the terms and requirements of this contract, the acceptance thereof by Humble and the loading thereof by Contractor upon its barges ready for transportation to the well site, the contract price shall be due and payable by Humble to Contractor.
14. Upon being awarded a land phase contract, Williams would order the materials which it was obligated to furnish under the contract, and Humble would furnish the materials which it had agreed to furnish.
15. After the platform construction materials had been assembled in Williams’ fabrication yard, approximately fifty Williams’ employees, mostly iron workers, were deployed in the performance of the land phase contract. The iron workers were classified into three basic groups according to skills; namely, burners, fitters, and welders. A burner, using an acetylene torch, cut the steel beams, pipe, bars, and plate into the required shapes and sizes required by Humble specifications. A fitter, taking the pre-cut pieces, further trimmed and fitted the pieces together in order that they might then be welded. The welders first tack-welded the fitted pieces and then returned to perform the finish welds.
16. Before a welder could perform work on any of Humble’s 1954 platforms, he had to pass a test administered in the contractor’s yard by a Humble welding inspector from the Louisiana Division Office in New Orleans, Louisiana.
17. It was agreed as a term of the land job contract that Williams would perform as much of the prefabrication and construction work on land as was reasonably possible. Therefore, Williams generally carried out its land-phase construction work to the point where the platform was in the largest pieces that could be lifted by crane onto the barge. However, an additional limiting factor with respect to land-phase construction was the size of the canal from Williams’ yard to the Gulf of Mexico, since the platform could only be constructed on land to the extent that it could pass under the bridges over the canal as well as through the canal locks.
18. When the various component parts of the platform in their largest manageable size had been completely loaded onto the barge, or barges, the land phase of the construction contract was at an end. The water stage of construction began with the towing of the barges to the drilling site in the Gulf of Mexico. The construction work on the water was performed from a construction ship or construction barge which had a crane capable of lifting the pieces of the partially constructed platform. A substantial amount of welding, cutting, and fitting work was performed on the construction
19. During the water work, -Humble assigned a civil engineer and a welding inspector to the project who ascertained whether the work conformed to the standards and specification set forth in the water-phase contract. The engineer and the welding inspector held the same authority during the water work as the division engineer and welding inspector held during the land work. The engineer and welding inspector often lived on the construction vessel throughout the the water stage.
20. If no economically productive wells were drilled at a particular location, the platform would be dismantled. The dismantling generally occurred in the reverse order of the prior erection -and assembly process. The dismantled platform parts, which were roughly the same prefabricated parts as existed at the completion of the land-phase contract, would then be taken ashore. There they would be stored at Humble’s Grand Isle installation or in a contractor’s yard for further disposition.
For the most part, however, Humble’s 1954 offshore platforms proved productive and have remained at the well locations for production purposes. Hence, as stated above, all of the platforms and platform extensions in issue are still in place in the Gulf with the exception of platform 1428B which was dismantled during 1954 and 1955.
21. There were several reasons for dismantling and removing unproductive platforms instead of simply leaving them in the water. The construction permits from the Army District Engineer required Humble to remove a platform upon expiration of its permit, or if the platform was incomplete at the expiration of the permit, or upon request. Since Humble knew it would probably be directed to remove a platform upon expiration of its permit in order to reduce navigational hazards posed by the platform, it elected to do so as soon as the platform ceased to be useful. Humble
22. With respect to the monetary value and economic feasibility of reusing salvaged materials, there are Humble files containing estimated figures which suggest that the costs of salvage operations consistently exceeded the monetary value of the materials expected to be salvaged, all as indicated by what management called an Authorization for Expenditure (AFE).
On one occasion, the dismantling of platform 1428B in 1954, the salvaged components were valuable to Humble as a means of expediting the construction of another platform, without regard to any particular monetary value they might have had. Humble had dismantled that particular platform with the intent of immediately reusing the components and thus hasten the construction of the platform on lease 2729
23. On October 29, 1954, Humble wrote to Williams requesting a bid for the dismantling and salvage for reuse of platform 1428B, stating in part:
You are invited to submit a bid to cover the salvage of this platform. The work to be done consists of: (1) removing all parts of the platform and eight anchor piles from the Gulf; (2) loading this salvaged material on barges; (3) transporting salvaged material to Contractor’s yard; (4) unloading all salvaged material; (5) reconditioning all material by removing all marine growth, mud, rust scales and damaged protective coatings by adequate hand and/or mechanical methods, and priming all exposed steel; and (6) storing for use in other platforms. In dismantling the platform, the material should be removed as nearly as possible in sections and shapes that can be reused in future construction, and should be handled in such manner as to prevent damage to the sections. Contractor will be expected to remove templets intact and to pull the piling and anchor piles from the Gulf bottom.
Williams was awarded the Salvage Job contract which was signed on November 24, 1954. Attached thereto was an exhibit titled “Specifications for Salvage of Offshore Platforms” reading, in part as follows:
The platform shall be dismantled in sections or parts corresponding to the prefabricated sections or parts from which the platform was erected. Where the handling of larger parts will materially speed the work in the Gulf, parts commensurate with the capacity of the equipment being used may be removed. Such parts, however, shall not destroy the integrity of the prefabricated sections and shall be further dismantled in Contractor’s yard for conditioning and storage. All sections or parts shall be rigged for handling in such manner as to prevent damage to the sections or parts in loading and unloading.
*****
After being unloaded in Contractor’s yard or other yard specified by Humble, all parts, sections and materials from the dismantled platform shall be conditioned for storage and/or use in future platforms by removing all marine growth, mud, rust scales and damaged protective coatings by 'adequate hand and/or mechanical*301 methods and by priming all exposed steel to prevent further corrosion while stored. * * *
% # # #
Templet sections, cap and portal sections and other fabricated sections shall be stocked as units. Beams, piles and pipe shall be marked to show length of each piece, with fade-proof crayon, so as to be readable after stocking without handling other pieces. Creosote decking may be used for cribbing and shall be placed so beams and pipe will drain and bear evenly. Small items such as bolts, lag screws, fence posts, floor flanges, clevises, etc., shall be grouped for inventory and storing. All junk items shall be assembled in one pile for disposition by Humble.
24. The dismantling and salvage of platform 1428B was a difficult operation, and parts of the platform were badly damaged in the process. One principal cause for this was the use by the contractor of an 80-ton crane, the capacity of which proved insufficient to pull the templets from the Gulf floor according to plan. As a result, dynamiting was resorted to for loosening the templets, and the explosive blasts caused substantial damage to some platform parts.
25. The platform erected on state lease 2729, in the construction of which significant parts of platform 1428B were used, was located on a site with conditions quite different than those where platform 1428B had been located. The soil foundation in the South Pass area (state lease 2729) was considerably different than that in the Grand Isle area (state
26. Occasionally Humble would design, or actually begin prefabrication of, a platform before the exact site had been established. At such times, the approximate location of the site was known, and the platform would be designated for accounting purposes as a “stock platform”. In this manner, expenses and other tabulations could be appropriated, accumulated, and identified to the proper platform, and work begun without waiting for designation of the exact site. Usually this method was used only when the contemplated site was close to a lease line. Only minor design modifications were required when the exact site location was eventually determined, which was usually never more than several hundred feet from the approximate location.
27. Derricks, such as those used on the 1954 platforms, were constructed for Humble by contractors. Boiled steel shapes, such as angles, channels and beams, as well as steel grating, bolts, and washers, were used in the fabrication of derricks. These basic materials were purchased by a supplying firm. The supplying firm then fabricated these basic materials into derrick parts by cutting the pieces to length, punching them for bolt holes and galvanizing them. The parts thus fabricated and comprising the parts required for a complete derrick were purchased by Humble from the supplying firm as a derrick (dismantled). The principal
28. With respect to the administrative proceedings herein, the parties have stipulated that on March 3, 1965, the Commissioner of Internal Revenue assessed a deficiency in income taxes against Humble with respect to its income tax return filed for the period January 1, 1954, through November 11, 1954. A portion of that deficiency, in the amount of $349,726, was due to the disallowance of deductions claimed for offshore platform construction expenditures attributable to the tax period totaling $791,172. Humble paid the deficiency plus assessed interest, and thereafter timely filed its claim for refund in the amount of $558,733, representing the $349,726 portion of the deficiency plus $209,007 assessed interest. On November 17, 1967, the Internal Revenue Service issued a notice disallowing the claim for refund of Humble under Section 6532 (a) (1) of the Internal Revenue Code. Following agreements extending the time for bringing suit until November 16,1971, Humble timely filed its petition herein on November 12,1971.
30. The amounts of tax and assessed interest in issue are also stipulated by the parties as follows:
CONCLUSION OF LAW
Upon the foregoing findings of fact which are made a part of the judgment herein, the court concludes as a matter of law that plaintiff is entitled to recover, and judgment is entered to that effect, with the determination of the exact
In accordance with the opinion of the court, a memorandum report of the trial judge and a stipulation of the parties, it was ordered on February 4, 1977 that judgment for the plaintiff be entered for $512,818, together with statutory interest as provided 'by law.
JTor ease in discussion throughout this opinion, I will refer only to templets as the pre-fabricated basic component parts of the drilling platform. However, there were other pre-fabricated basic component parts, such as cap and portal sections. To the extent that the other basic component parts are similar to the above discussed templet sections, I would deny the IDC option to the costs incurred in fabricating those component parts.
The costs to which I refer, in addition to the enumerated costs, include the cost of insurance and taxes, as well as the contractor’s overhead and profit
All platforms built or extended by Humble (plaintiff’s predecessor) In 1954 were templet-type platforms. Findings of Fact, No. 8. Therefore, this opinion does not consider with respect to the IDC option the other types of offshore structures used by oil companies In 1954, such as caissons and jacket-type platforms.
For other design differences, see Findings of Fact, No. 7.
Templets are fabricated structures composed of steel beams and pipe which are designed to support the platform deck.
A well-documented pictorial treatise, “Humble Oil and Refining Company, Civil Engineering Project Report, July 20, 1956," Joint Exhibit 1, in evidence and part of the record of this ease, visually presents the construction of a Humble offshore drilling platform.
See Findings of Fact, No. 4.
On October 29, 1954, Humble wrote to Williams requesting a bid for the dismantling and salvaging for reuse of a platform, stating in part: “* * * In dismantling the platform, the material should be removed as nearly as possible in sections and shapes that can be reused in future construction and should be handled in such manner as to prevent damage to the sections. Contractor will lie expected to remove the templets intact and to pull the piling and anchor piles from the Gulf bottom.” [Emphasis supplied.] Williams was awarded the salvage job contract. Attached thereto was an exhibit titled “Specifications for Salvage of Offshore Platforms” reading, in part, as follows :
“The platform shall be dismantled in sections or parts corresponding to the prefabricated sections or parts from which the platform was erected. * * «
*****
“Templet sections, cap and portal sections and other fabricated sections shall be stocked as units. * * *” [Emphasis supplied.] [Findings of Fact, No. 23.]
Although Justice Blackmun was referring to Treas. Reg. § 1.612-4(c) (1) (1965), that Identical language appears In Reg. Ill § 29.23 (m)-16(c) (1) Issued under the 1939 Code and applicable to the instant case.
Findings of Fact, No. 24.
Findings of Fact, No. 25.
An item not In Issue In the present case but still analogous to the basic templet unit Is the component parts of the derricks which were used on the 1954 platforms.
The derricks were constructed for Humble by contractors. Rolled steel shapes, such as angles, channels and beams, as well as steel grating, bolts and washers, were used In fabrication of derricks. These basic materials were fabricated Into derrick parts by cutting the pieces to length, punching them for bolt holes and galvanizing them. The parts thus fabricated and compris
As with the basic templet unit, those costs incurred in moving, assembling and making the derrick parts operational as a derrick would in a proper case be allowed to qualify for the IDC option. The expenditures for wages, fuel arid supplies, etc., Incurred In fabricating the basic tangible materials into derrick parts would not qualify for the IDC option.
T.D. 4333, XI-1 Cum. Bull. 31 (1932).
Treas. Reg. 103, § 19.23 (m)-16.
T. D. 4333, supra at 31.
It should be noted that In 1943 the Treasury issued T.D. 5276 01943 Cum. Bull. OLStl, amending Treas. Reg. 103) which constituted a complete overhaul of the IDC option for taxable years beginning after December 31, 1942. Except for the fact that costs subject to the IDC option were defined to include the cost to the operator of any drilling or development work done for him by contractors under any form of contract, T.D. 5276 did not change with respect to the instant case any pertinent provision of T.D. 4333, which carried over to Reg. 118.
H.R. Con. Res. 50, 79th Cong., 1st Sess. (1945); 1945 Cum. Bull. 545.
At page 271.
At page 274.
“In general, this option applies only to expenditures for those drilling and developing Items which in themselves do not have a salvage value.” Reg. 118, § 39.23(m)-16(a) (1).
See note 40.
Platforms derived their Identification numbers from the number of the particular state lease upon which the platform was located. For example, platform 798D was located on land subject to lease number 798. The “D” indicates that 798D was the fourth platform erected on lease 798.
In 1954, a Humble offshore drilling and production platform was constructed from several principal categories of materials, including (a) rolled structural steel shapes known as “H” beams, (b) structural steel pipe, (c) structural steel bars and plate, and (d) structural timber. Humble purchased and supplied the heavier materials, such as steel beams and plate from steel mills, and Williams obtained and supplied the smaller items which it also purchased from steel miUs.
An AFE was a device used by Humble management formally and officially to authorize the commencement of a planned project. In the context of value, it represented the estimated value of the parts after salvage, as calculated prior to the commencement of the salvage operation.
In later platform salvage operations, Humble managed to avoid some of tbe difficulties and damage which occurred during the salvage of platform 1428B. For example, 3T. Ray McDermott Co., Inc. used a 250-ton American crane to pull the templets of platform 929B.
Concurrence Opinion
I concur in the per curiam opinion of the court and further express my general agreement with the separate views stated by Judges Davis and Bennett.