36 Pa. Commw. 530 | Pa. Commw. Ct. | 1978
Opinion by
Exeter Township Authority (Authority) appeals from an order of the Court of Common Pleas of Berks County, sitting en banc, which affirmed an adjudication by the trial judge entered in favor of the appellee-property-owners. Two municipal claims had been filed by the Authority, and were consolidated for trial and for argument here, in the amounts of $6,828-.15 and $3,072.25 for work done in laying sanitary sewer lines in two roads abutting appellees’ property.
The Pre-Trial Conference Order stipulated the issues to be tried, to wit: whether the neighborhood in which the subject property is located was predominantly rural in character at the time the assessments were levied and whether the sewer line in question was a benefit to the premises.
At a trial before the court, sitting without a jury, it was shown that (1) the appellees’ property consists of 142.59 acres of land, mainly used for farming, which is located in an area of the township that consists largely of residential subdivisions; (2) the sanitary sewer line was constructed by the Authority in 1968 on the opposite sides of the farm, 779 feet on Lincoln Road, a paved state highway, and 350 feet on Nagle Road,, a paved township road; and (3) that lateral lines (to connect to abutting property) were installed by the Authority for residential property opposite appellees ’ farm but none was placed to serve the property of the appellees. The only testimony was that of the appellee-property owner, a former township engineer who also testified as an expert witness. Appellee stated that it would cost approximately $9,000 to install laterals to serve his property and that prior permission would have to be obtained from the state and township to cut the surface of the roads.
The Authority pleaded surprise with regard to this testimony and moved to strike that portion relating to the laterals as not responsive to the pleadings. The trial court, however, allowed the testimony, but because of the Authority’s plea scheduled a second hearing at which the Authority renewed its motion to strike but offered no rebuttal evidence. In its adjudication the trial court found that because laterals had not been constructed to serve the appellees’ property it would
The Authority first contends that Section 4(B) (r) and (s) of the Municipality Authorities Act of 1945
The front foot method of apportionment is but a practical substitute for an actual assessment by a jury of view. It ... is merely a convenient method of practical adjustment of proportional benefits and it is allowable only because it practically arrives at a correct result in adjusting the burden according to the benefits. An application thereof which does not reflect an assessment according to benefits is in excess of legislative power.
Thus, an assessment made on a front footage basis Avithout regard for the benefits conferred on the property, even where the property is located in an urban area, is invalid. See Palmer Township Municipal Sewer Authority v. Witty, Pa., 388 A.2d 306 (No. 140 January Term, 1977, filed June 2, 1978) and Upper Moreland-Hatboro Joint Sewer Authority v. Pearson, 190 Pa. Superior Ct. 107, 152 A.2d 774 (1959).
It is true, as the Authority contends in its second issue for review, that there is a rebuttable presump
A final argument advanced by the Authority for reversal is that the trial court erred admitting testimony regarding the existence of lateral lines and cost of installing laterals to serve the appellees’ property because this evidence was outside the scope of facts
Lastly, since the trial court found in favor of the Authority in determining that the property of appellees was in a predominantly urban area, we need not address the Authority’s allegation of error in this regard.
Accordingly, we will enter the following
Order
And Now, July 13, 1978, the order of the Court of Common Pleas of Berks County, at Nos. 66 and 67 December Term 1973, dated October 27, 1976, is hereby affirmed.
Act of May 2, 1945, P.L. 382, as amended, 53 P.S. §306B(r) and (s).
This evidence was in the nature of testimony by the appellee property owner that the cost of installing a lateral to the existing sewers on the two roads would be roughly three times the cost of such laterals had they been put in place at the time of the initial construction. Mr. Eways further testified that in his experience as an engineer the Authority bore the cost of laterals installed at the time of the main line while the property owner was required to pay for costs to “cut” into the line to install a lateral at a later time. Following the introduction of this evidence the Authority declined an offer to stipulate that the Authority would be either wholly or partly responsible for the construction of any lateral to serve the appellees’ property.