MEMORANDUM OPINION
Plаintiff Essroc Cement Corp. (“Plaintiff’) brings the present action against Defendant CTI/D.C., Inc. (“Defendant”) (together, the “Parties”), asserting causes of action for breach of contract, unjust enrichment, and fraud in connection with Plaintiffs extension of credit and provision of goods, materials, and services to Defendant in the spring and fall of 2008. Presently before the Court is Plaintiffs [26] Motion for Summary Judgment, which Defendant has failed to oppose or respond to in any fashion. After reviewing Plaintiffs submissions, including the attachments thereto, the relevant authorities, and the record as a whole, the Court shall GRANT-IN-PART and DENY-IN-PART Plaintiffs Motion for Summary Judgment, for the reasons set forth below.
I. BACKGROUND
A. Factual Background
1. The Parties and their Contractual Relationship
Plaintiff, a Pennsylvania corporation with its principal place of business within that state, is engaged in the business of producing and providing cement to clients throughout the United States, Canada, and Puerto Rico. 1 Pl.’s Stmt., Docket No. [26], *135 ¶¶ 1, 3. Defendant, incorporated and operating at least in part in the District of Columbia, is in the business of providing ready-mix concrete to commercial and residential developers. Pl.’s Stmt. ¶¶ 2, 4; Y. Answer, Docket No. [10-2], ¶¶ 2, 5.
On or about January 23, 2008, the Parties entered into an agreement, the primary purpose of which was to enable Defendant to purchase goods, materials, and services — most notably, cement — on credit from Plaintiff (the “Credit Agreement”). PL’s Stmt. ¶¶ 5-6 and Ex. A (Credit Agreement). 2 The terms of the Credit Agreement itself are relatively sparse, contemplating that individual sales of concrete would be governed by more specific terms and conditions to accompany such sales. Specifically, the Credit Agreement provides, in relevant part:
All sales will be subject to further Terms and Conditions as provided, as revised from time to time without notice to [Defendant], аnd such revised Terms and Conditions shall prevail on all shipments after the date of revision regardless of when the related orders were received.
Pl.’s Stmt. Ex. A (Credit Agreement) at 1.
Subsequently, as contemplated by the Credit Agreement, each individual delivery of cement products from Plaintiff to Defendant was followed by an invoice covering one or more deliveries, which set forth the terms and conditions of the sale (the “Terms and Conditions”). 3 PL’s Stmt. ¶ 10 *136 and Ex. C (PL’s Req. for Admis.) SubExs. A-AA (Invoices and Bills of Lading). The Terms and Conditions accompanying each sale supplemented the Credit Agreement, and fleshed out the contours of the Parties’ contractual relationship. Specifically, with respect to payment, the Terms and Conditions provided that invoices were “payable in full not later than the last day of the month following the month in which shipments were made.” 4 PL’s Stmt. Ex. B (Terms and Conditions) at 1. Balances past due would be “subject to a service charge of one and one half percent (1-1/2%) per month or the highest rate permissible by law.” Id. And, in the event Defendant failed to comply with the terms of payment, the Terms and Conditions reserved to Plaintiff the right to terminate deliveries and to exercise its right to recover for all unpaid accounts. Id.
2. The Deterioration of the Parties’ Commercial Relationship
Beginning in April 2008, Plaintiff periodically supplied to Defendant various cement products pursuant to the Credit Agreement and the Terms and Conditions. Id. ¶¶ 12-28. From the outset, the relationship was a troubled one, as Defendant never paid any of the invoices issued by Plaintiff. Id. ¶ 43. On or about September 8, 2008, prompted by the ballooning number of invoices that remained unpaid by Defendant (at least sixteen invoices had been issued, with a total amount outstanding approaching $500,000), Plaintiff advised Defendant that, going forward, Defendant would be rеquired to purchase cement on a cash-on-delivery basis. 5 Id. ¶¶ 13-28, 44^5.
Thus, beginning on September 8, 2008 and continuing at least through September 17, 2008, Plaintiff supplied Defendant with cement exclusively on a cash-on-delivery basis. Id. ¶¶ 29-34. Despite this arrangement, between September 11, 2008 and September 18, 2008, Defendant proceeded to issue to Plaintiff a series of bad checks. 6 All in all, Defendant issued a total of four checks to Plaintiff in the aggregate amount of $27,224.01, purportedly in payment of six separate invoices issued by Plaintiff. Id. ¶¶ 47, 49, 52. All four checks were returned for insufficient funds. Id. And, in all four instances, it is undisputed that Defendant knew that it held insufficient funds in its bank account to cover the amounts designated at the time the checks were issued. Id. ¶¶ 48, 50-51, 53.
3. The Defendant’s Assurances and Plaintiff’s Demand
On or about September 29, 2008, “[f]or purposes of inducing [Plaintiff] to supply it with additional cement,” Defendant told Plaintiff that it would convert a certificate оf deposit (“CD”) to pay Plaintiff $240,000 towards its past-due balance. Id. ¶ 56. However, Defendant actually had no intention of converting the CD at the time these representations were made to Plaintiff. Id. ¶ 57. Plaintiff nevertheless supplied to Defendant approximately $33,153.96 worth of cement between September 30, 2008 *137 and October 9, 2008. 7 Id. ¶¶ 38-39. It is undisputed that Plaintiff never received payment for these goods. Id. ¶¶ 42-43, 59; V. Answer ¶ 21.
On November 11, 2008, apparently having had its fill, Plaintiff sent to Defendant a certified letter demanding full payment of the unpaid invoices, as well as accrued service charges on past-due invoices. Pl.’s Stmt. ¶ 58. As of that date, Defendant was delinquent in its payments in the principal amount of $552,577.77 and had incurred service charges in the amount of $33,925.72, for a total of $586,503.49. Pi’s Stmt. Ex. C (PL’s Req. for Admis.) Sub-Ex. EE (Certified Letter) at 1-2. Defendant received the letter, but failed to respond or remit payment in any amount. PL’s Stmt. ¶¶ 58-59. It is undisputed that Defеndant has received a copy of each of the invoices underlying these figures and, prior to Plaintiffs filing of the Complaint in this action, has never disputed or questioned their validity. Id. ¶¶ 41-42. To date, Defendant has never paid any of the invoices. Id. ¶¶ 43-44, 59.
B. Procedural History
Plaintiff filed this action against Defendant on December 17, 2008, asserting three causes of action based upon Defendant’s alleged failure to pay for the cement supplied by Plaintiff. See Compl., Docket No. [1]. A copy of the Summons and Complaint was served on Defendant, via its registered agent, on December 19, 2008. See Return of Serv./Aff., Docket No. [4]. Having received no response in the time allotted by the Federal Rules of Civil Procedure, Plaintiff requested an entry of default, see PL’s Req. for Entry of Default, Docket No. [5], which the Clerk of the Court subsequently entered on or about February 3, 2009, see Clerk’s Entry of Default, Docket No. [6]. Thereafter, Plaintiff moved this Court for entry of judgment by default. See PL’s Mot. for Default J., Docket No. [7], Before the Court had an opportunity to consider and rule upon Plaintiffs motion, Defendant filed a Motion to Set Aside Entry of Default and Opposition to Motion for Entry by Default, asserting that it did not have actual notice of the lawsuit prior to learning of Plaintiffs motion. See Def.’s Mot. to Set Aside Default, Docket No. [10]. 8 On November 9, 2009, finding, inter alia, that Defendant had sufficiently demonstrated a lack of willfulness on its part, the Court granted Defendant’s Motion to Set Aside Entry of Default and denied Plaintiffs Motion for Entry of Judgment by Default. See Nov. 9, 2009 Mem. Op., Docket No. [14].
Unfortunately, Defendant’s active participation in this action was short lived. Prior to making any meaningful inroads into discovery, the Court referred this case to the Court’s Mediation Program pursuant to the Parties’ request. See Dec. 14, 2009 Order, Docket No. [17], When Defendant’s counsel failed to participate in the Court’s Mediation Program, and also failed to appeаr at a Court-ordered Initial Scheduling Conference, Defendant was ordered to file written notice explaining why Defendant’s counsel should not be held in contempt. 9 See Mar. 5, 2010 Order, Dock *138 et No. [19]. In so doing, the Court noted that the aforementioned conduct “continue[d] a pattern of indifference towards the defense of this lawsuit that began with Defendant’s failure to timely file an answer and a subsequent entry of default against Defendant (which was later set aside by the Court).” Id. at 1. That pattern has continued unabated.
The Parties proceeded to the initial stages of discovery in this action, undertaking to serve any written discovery upon each other on or before April 12, 2010, with responses to be provided in accordance with the Federal Rules of Civil Procedure and the Court’s Local Rules. See Joint Report as to Disc. Plan, Docket No. [23], at 1; see also Joint Local Civ. Rule 16.3(c) Stmt., Docket No. [16], at ¶ 8(b). On April 12, 2010, consistent with these strictures, Plaintiff properly and timely served upon Defendant 132 Requests for Admission. See PL’s Stmt. Ex. C (Reqs. for Admis.) at 18. Plaintiff failed to respond or object to Plaintiffs Requests for Admission within the allotted thirty-day period, see Fed.R.Civ.P. 36(a)(3), or at any time thereafter. Nor does it appear that Defendant has ever sought any discovery from Plaintiff.
On June 11, 2010, Plaintiff proceeded to file the present Motion for Summary Judgment. See Not. of PL’s Mot. for Summ. J., Docket No. [26]. Defendant once again failed to respond, prompting Plaintiff to file a notice with the Court indicating that Defendant’s time to file opposition papers had expired, thus rendering the motion ripe for adjudication. See Praecipe regarding PL’s Mot. for Summ. J., Docket No. [27], at 1. While a copy of the notice was served upon Defendant’s counsel via the Court’s ECF system, id. at 2, Defendant has nevertheless failed to provide a response of any kind to the present motion. Defendant’s failure cannot be for want of time, as well over three months have elapsed since Plaintiffs motion was first filed with the Court.
II. LEGAL STANDARD
Summary judgment is proper when “the pleadings, the discovery [if any] and disclosure materials on file, and any affidavits show that there is no genuine issue as to any material fact and that the movant is entitled to judgment as a matter of law.” Fed.R.Civ.P. 56(c). Under this standard, the moving party bears the “initial responsibility of informing the district court of the basis for its motion, and identifying those portions of the pleadings, depositions, answers to interrogatories, and admissions on file,.together with the affidavits, if any, which it believes demonstrate the absence of a genuine issue of material fact.”
Celotex Corp. v. Catrett,
A. Defendant’s Failure to File an Opposition to Plaintiffs Motion
At the outset, the Court observes that, as of the date of this opinion, Defen
*139
dant has failed to file a Memorandum of Points and Authorities in opposition to Plaintiffs Motion for Summary Judgment. As a result, the Court may elect to treat the present motion as conceded.
See
LCvR 7(b) (“If [a memorandum of points and authorities in opposition to the motion] is not filed within the prescribed time, the Court may treat the motion as conceded.”).
10
The D.C. Circuit Court of Appeals has explained that this rule “is a docket-management tool that facilitates efficient and effective resolution of motions by requiring the prompt joining of issues.”
Fox v. Am. Airlines,
B. Defendant’s Failure to File a Statement of Material Facts at Issue
While the Court has elected not to exercise its discretion to treat Plaintiffs motion as conceded as a result of Defendant’s failure to submit a Memorandum of Points and Authorities, this is hardly Defendant’s only failing. Here, the Court notes that the District Court for the District of Columbia has supplemented Federal Rule of Civil Procedure 56 with Local Civil Rule 7(h), which requires that each party submitting a motion for summary judgment attach a statement of material facts to which that party contends there is no genuine issue, with specific citations to those portions of the record upon which the party relies in fashioning the statement. The party opposing such a motion must, in turn, submit a statement enumerating all material facts which the party contends are at issue and thus require litigation.
See
LCvR 7(h)(1). Where the opposing party fails to discharge this obligation, a court may take all facts alleged by the movant as admitted.
Id.; see also Arrington v. U.S.,
This well-reasoned rule “places the burden on the parties and their counsel, who are most familiar with the litigation and the record, to crystallize for the district court the material facts and relevant portions of the record.”
Jackson v. Finnegan, Henderson, Farabow, Garrett & Dunner,
In this case, whereas Plaintiff filed a statement in conformance with Local Civil Rule 7(h)(1), Defendant has failed to discharge its corresponding burden to come forward and submit a statement enumerating all material facts allegedly at issue and thus requiring litigation. As such, although discretionary in the text of Local Civil Rule 7(h), this Court shall “assume[] that facts identified by [Plaintiff] in its statement of material facts are admitted” in resolving the present summary judgment motion. LCvR 7(h). The Court concludes that Defendant has been given more than adequate opportunity to be heard, but has repeatedly failed to take advantage of its opportunities to defend itself in this action. See also supra. Part I.B. The Court has reviewed the record citations to ensure that the representations made in Plaintiffs statement are accurate, and, where possible, the Court cites to Plaintiffs Statement of Material Facts filed in accordance with Local Civil Rule 7(h)(1).
C. Defendant’s Failure to Respond to Plaintiff’s Requests for Admission
In any event, even if Defendant had hypothetically submitted a statement in compliance with Local Rule 7(h), it would be of little avail in light of its separate and independent failure to respond to Plaintiffs properly served Requests for Admission within the time allоtted by the Federal Rules of Civil Procedure. Pursuant to Fed.R.Civ.P. 36(a)(1), a party may serve on any other party written requests to admit the truth of any matters relating to facts, the application of law to fact, or opinions about either, and the genuineness of any described documents. If the party served fails to respond within thirty days of service, either by written answer or objection, the matters described are deemed admitted. Fed.R.Civ.P. 36(a)(3). Moreover, once a matter is deemed admitted under the Rule, it is to be considered “conclusively established” unless the party moves to amend or withdraw. Fed. R.Civ.P. 36(b);
see also Anchorage-Hynning & Co. v. Moringiello,
As set forth above, Plaintiff properly and timely served upon Defendant 132 Requests for Admission, and Defendant failed to respond within the allotted thirty-day period or at any time thereafter. By automatic operation of Rule 36, each of the matters set forth therein are “conclusively established” for purposes of the present litigation. Fed. R.Civ.P. 36(b). Such deemed admissions may properly support a motion for summary judgment.
See, e.g., Unitronics (1989) (R”G) Ltd. v. Gharb,
III. DISCUSSION
Plaintiff seeks judgment as a matter of law on each of its causes of action for breach of contract, unjust enrichment, and fraud — the only claims Plaintiff has asserted in this action. Plaintiff contends that the undisputed facts demonstrate that Defendant (1) breached the terms of the Credit Agreement and Terms and Conditions or, in the alternative, has been unjustly enriched due to its failure to pаy for the cement supplied to it by Plaintiff, 11 and (2) has committed fraud against Plaintiff based upon Defendant’s allegedly false representations that it would convert a CD to pay amounts owed to Plaintiff by a certain date. The Court shall consider each of these contentions in turn below.
A. Plaintiffs Claim for Breach of Contract
1. Choice-of-Law
Because this is a diversity case, the Court must first determine which state law to apply to Plaintiffs cause of action for breach of contract. In resolving this question, the Court applies the District of Columbia’s choice-of-law rules.
Klaxon Co. v. Stentor Elec. Mfg. Co.,
Here, the Terms and Conditions governing all of the sales at issue inсludes the following choice-of-law provision:
The laws of the Commonwealth of Pennsylvania, including the UCC, shall govern any dispute between Essroc and [Defendant] arising from or in connection with this invoice or its terms and conditions, and payment [t]hereof.
Pl.’s Stmt. Ex. B (Terms and Conditions) at 1. Plaintiffs status as a Pennsylvania corporation with its principal place of business within that state,
see
PL’s Stmt. ¶ 1, more than suffices to meet the “reasonable relationship” threshold required to support the express choice-of-law provision set forth in the Parties’ agreement.
See, e.g., Ekstrom,
2. Merits of Plaintiff’s Breach of Contract Claim
Under Pennsylvania law, in order to successfully maintain a cause of action for breach of contract, the plaintiff must establish: (1) the existence of a contract, including its essential terms; (2) the defendant’s breach of a duty imposed by the contract; and (3) resultant damages.
Gorski v. Smith,
First, it is undisputed that Plaintiff and Defendant entered into the Credit Agreement, whereby Plaintiff agreed to supply to Defendant cement products on credit. PL’s Stmt. ¶¶ 5-6 and Ex. A (Credit Agreement). The Credit Agreement, in turn, expressly contemplаted that all future sales by Plaintiff to Defendant would be subject to the additional Terms and Conditions. Id. at 1. During the course of the Parties’ relationship, each sale was accompanied by an invoice, which set forth the identical Terms and Conditions, and it is undisputed that Plaintiff provided Defendant cement products “[pjursuant to the Credit Agreement and the Terms and Conditions.” Id. ¶¶ 10,12, 42.
Second, pursuant to the terms of the Credit Agreement and the Terms and Conditions, Defendant was obligated to render payment on each invoice “not later than the last day of the month following the month in which shipments were made.” PL’s Stmt. Ex. B (Terms and Conditions) at 1. Where Defendant failed to meet that obligation, overdue balances would be “subject to a service charge of one and one half percent (1-1/2%) per month or the highest rate permissible by law.” Id. Despite these unambiguous terms, Defendаnt repeatedly breached the Credit Agreement and Terms and Conditions over the course of the Parties’ relatively short commercial relationship. Indeed, Defendant has never paid any of the invoices issued by Plaintiff, all while never disputing or questioning their validity. Id. ¶¶ 41-44. The Court finds it difficult to conjure a more obvious breach.
Finally, Plaintiff has also carried its burden of establishing an entitlement to damages, though its submissions have *143 hardly eased the Court’s task of calculating those damages. Specifically, in connection with its claim for breach of contract, Plaintiff seeks damages in the amount of $552,577.77 in past due balances for cement invoiced and $185,816.01 in service charges accruing at 1.5% per month through the week prior to Plaintiffs motion. Pl.’s Mem. P. & A. at 7-8. Although there is ample support in the record for Plaintiffs contention that the principal amount due totals $552,577.77, see PL’s Stmt. ¶¶ 44, Ex. C (PL’s Req. fоr Admis.) ¶ 7 and Sub-Exs. A-AA, EE, the same is not true for the latter figure.
In support of the claimed service charges figure, Plaintiff cites to two paragraphs from its Statement of Material Facts; those paragraphs unhelpfully set forth broad sections of the Parties’ agreements and provide that Defendant has failed to render payment on any invoices. PL’s Stmt. ¶¶ 11, 43. Indeed, the Court can find no support in the record submitted by Plaintiff pointing to the proper measure of service charges as of June 4, 2010 (or at the time of the filing of Plaintiffs motion). Instead, the only concrete figure supported by the record appears in a Service Charge Invoice sent by Plaintiff to Defendant on or about November 11, 2008. See PL’s Stmt. Ex. C (PL’s Req. for Admis.) Sub-Ex. EE. That document identifies the service charges outstanding as of that date as $33,925.72. Id. at 2. Although the Court does not doubt that the figure has grown in the intervening months, Plaintiff has failed to bring to this Court’s attention sufficient documentation demonstrating the proper calculation of service fees as of today, and it is not this Court’s burden to hunt down the pertinent materials and attempt a calculation of Plaintiffs damages. 13 Accordingly, the Court finds that Plaintiff has only established its entitlement to damages in the amount of $586,503.49, representing the principal amount and service charges outstanding as of November 2008.
3. Attorney’s Fees and Costs
In addition to compensatory damages, Plaintiff seeks to recover attorney’s fees and costs in connection with its breach of contract claim. Under Pennsylvania law, which applies to Plaintiffs breach of contract claim, “a litigant cannot recover counsel fees ... unless there is express statutory authorization, a clear agreement of the parties, or some other established exception.”
Trizechahn Gateway LLC v. Titus,
Here, there is no ambiguity in the Parties’ agreements. The Credit Agreement provides: “Customer agrees to pay any collection costs incurred by Essroc whether by suit or otherwise, including any attorney’s fees.” PL’s Stmt. Ex. A (Credit Agreement) at 1. Indeed, even if
*144
this language had not expressly contemplated Plaintiffs recovery of attorney’s fees in the course of prosecuting a lawsuit against Defendant, at least one Pennsylvania court has concluded that the term “collection costs” is sufficiently broad to encompass both attorney’s fees and costs.
See Wrenfield Homeowners Ass’n, Inc. v. DeYoung,
B. Plaintiff’s Claim for Unjust Enrichment
Plaintiff further contends that, “were the Court to somehow determine that the Credit Agreement is invalid,” it would nevertheless be entitled to recover the value of the goods and services it provided to Defendant under the theory of unjust enrichment. PL’s Mem. P. & A. at 8. As Plaintiff has prevailed on its cause of action for breach of contract, the Court need not address its alternative argument that recovery should be had under the theory of unjust enrichment.
See Reiman & Co. v. Eromanga Investments, N.V.,
meruit where plaintiff had already prevailed on parallel breach of contract claim).
C. Plaintiffs Claim for Fraud 1. Choice-of-Law
Because the choice-оf-law provision in the Parties’ agreements does not extend to Plaintiffs cause of action for fraud, the Court must separately determine the applicable law pursuant to the District of Columbia’s choice-of-law rules.
Klaxon,
*145
Plaintiff asserts that Pennsylvaniа governs its fraud count, arguing in essence that, because it is a Pennsylvania corporation and because Pennsylvania has an interest in protecting its citizens from fraud, application of the District of Columbia’s “governmental interests” test calls for the application of Pennsylvania law. Plaintiff, however, neglects to address the antecedent question:
ie.
whether there is any true conflict at all between the laws of Pennsylvania and the District of Columbia with respect to Plaintiffs cause of action for fraud. The Court, having found no such conflict based upon its independent review of the laws of the respective jurisdictions, will therefore apply the law of the District of Columbia by default.
GEICO,
2. Merits of Plaintiffs Fraud Claim
Plaintiff contends that Defendant fraudulently represented to Plaintiff that it would convert a $240,000 CD to partially pay its outstanding debt, thereby inducing Plaintiff to supply additional сement to Defendant.
16
See
Pl.’s Mem. P. & A. at 10. To prevail on its claim for fraud, a plaintiff must establish each of the following essential elements: (1) the defendant made a false representation; (2) in reference to material fact; (3) with knowledge of its falsity; (4) with the intent to deceive the plaintiff; (5) the plaintiff acted in reasonable reliance on that representation; (6) which consequently resulted in provable damages.
C & E Servs., Inc. v. Ashland, Inc.,
Mindful that Plaintiffs motion is uncontested, the Court nevertheless concludes that myriad undisputed facts on the record, elided by Plaintiff in its moving papers, militate against a finding in Plaintiffs favor on this point. First, by early September 2008, approximately three weeks before the assurances at issue, Defendant had already incurred approximately half a million dollars in debt, failing to remit payment on any one of the sixteen invoices issued by Plaintiff as of that point in time. Pl.’s Stmt. ¶¶ 13-28, 43. Second, it is undisputed that, by September 8, 2008, Plaintiff had become sufficiently concerned as to Defendant’s ability to meet its financial obligations that it began requiring Defendant to purchase cement on the basis of cash-on-delivery. Id. ¶ 45. Third, in the period between September 11, 2008 and September 18, 2008 (approximately eleven days prior to the assurances at issue), Defendant proceeded to write a series of bad checks to Plaintiff, each of which was returned for insufficient funds. 18 Id. ¶¶ 47-53. Fourth, Plaintiffs submissions leave unexplained why Plaintiff continued to supply Defendant with сement products between September 19, 2008 and September 22, 2008, the time intervening between Defendant’s issuance of checks returned for insufficient funds and the time of Defendant’s alleged representations regarding the conversion of the CD, without any apparent further inducement. Id. ¶¶ 35-37. Fifth, the record supports the inference that Plaintiff, a corporation in the business of providing cement to clients nationally and internationally, id. ¶ 3, is a sophisticated commercial actor, and Plaintiff does not suggest that it and Defendant ever interacted at anything other than arm’s length. Finally, although Plaintiff had means at its disposal to verify Defendant’s financial condition, see PL’s Stmt. Ex. A (Credit Agreement) at 1 (“Customer further agrees to supply such information as may be required by Essroc to ... warrant the future extension of credit”), the record is devoid of any evidence that Plaintiff ever exеrcised that right.
Considered together, these facts — which are undisputed based on Plaintiffs own submissions to the Court — compel the Court to conclude that there remains a genuine issue as to whether Plaintiff acted reasonably in relying upon Defendant’s alleged assurances.
See C & E Servs.,
3. Punitive Damages
While Plaintiffs failure to make out an underlying claim for fraud pre *147 eludes an award of damages sought in connection with that claim, the Court pauses to note that, even if Plaintiff had hypothetically prevailed on its fraud claim, Plaintiff has independently failed to meet the heightened standard required to justify an award of punitive damages at this stage of thе proceedings.
Under District of Columbia law, “[p]unitive damages may be awarded ‘only if it is shown by clear and convincing evidence that the tort committed by the defendant was aggravated by egregious conduct and a state of mind that justifies punitive damages.’ ”
Chatman v. Lawlor,
Plaintiff contends that punitive damages are mandated because Defendant “had actual knowledge of the fact that it was issuing bad checks, had actual knowledge that it would not be converting the $240,000 CD to pay off a portion of its past due balance and made willful misrepresentations to secure the Cement.” Pl.’s Mem. P.
&
A. at 14. In this regard, Plaintiff offers nothing more than a restatement of the facts supporting its underlying claim for fraud.
See, e.g., C & E Servs.,
IV. CONCLUSION
For the foregoing reasons, the Court shall GRANT-IN-PART Plaintiffs [26] Motion for Summary Judgment with respect to Plaintiffs claim for breach of contract and award Plaintiff damages in the amount of $586,503.49, along with reasonable attorney’s fees, costs, and post-judgment interest calculated at the statutory rate, and DENY-IN-PART Plaintiffs motion with respect to its claims for unjust enrichment and fraud. An appropriate Order accompanies this Memorandum Opinion.
Notes
. As set forth in greater detail below, see infra. Part II.B, this Court strictly adheres to the text of Local Civil Rule 7(h) (formerly Local Civil Rule 56.1). In this case, as Defendant has failed to discharge its burden to submit a statement of material facts at issue *135 and therefore requiring litigation, the Court shall treat as admitted the facts identified in Plaintiff's Statement of Material Facts ("Pl.'s Stmt.”). See LCvR 7(h). Nevertheless, in an exercise of its discretion, the Court has independently reviewed the entire record to confirm that there is adequate support for Plaintiff's submissions.
. The Credit Agreement was signed by Patrick Bell, a duly authorized representative of Defendant. PL's Stmt. ¶¶ 7-8 and Ex. A (Pl.'s Req. for Admis.) ¶¶ 3-6. At the time, Mr. Bell served as Defendant's Chief Financial Officer, and, in the course of the Parties' dealings, held himself out to be (and in fact was) authorized to execute the agreement on Defendant’s bеhalf. Id. Although Defendant has previously taken the position in this litigation that Mr. Bell was a mere "consultant” to Defendant, see Def.'s Initial Disclosures Pursuant to Fed.R.Civ.P. 26(a), Docket No. [25], at ¶ 2, Plaintiff's characterization of Mr. Bell's position and his authority to bind Defendant is, for reasons set forth elsewhere, deemed admitted by operation of Local Civil Rule 7(h) and Fed.R.Civ.P. 36(b).
. From Plaintiff's various submissions to the Court, it is not entirely clear whether the Terms and Conditions appeared on the back of the Credit Agreement, the bills of lading, the invoices, or some combination of the three. For instance, whereas Plaintiff alleges in the Complaint that "[t]he Terms and Condition[s] appeared on the back side of the Credit Agreement and on each invoice sent to Defendant," Compl., Docket No. [1], 1Í 9 (emphasis added), Plaintiff's Statement of Material Facts somewhat vaguely provides that "[t]he Terms аnd Condition[s] of the Credit Agreement appear on each invoice sent to Defendant,” PL's Stmt. ¶ 10. Meanwhile, the bills of lading submitted by Plaintiff in support of its motion suggest that the Terms and Conditions may have appeared on the backside of those documents as well. PL's Stmt. Ex. C (PL's Req. for Admis.) Sub-Exs. AAA. Unfortunately, the Court’s determination of the issue was not aided by Plaintiff's decision to submit the Terms and Conditions as a single, separate exhibit rather than including it as part of the relevant document(s). See PL's Stmt. Ex. B (Terms and Conditions). Judging from the choice-of-law clause that appears therein, it appears that at least that iteration accompanied an invoice. See id. at 1 ("The laws of the Commonwealth of Pennsylvania ... shall govern any dispute between Essroc and the Customer arising from or in connection with this invoice ”) (emphasis added). The confusion, however, is ultimately immaterial, as it is undisputed that the identical Terms and Conditions were set forth on each invoice sent to Defendant, PL’s Stmt. ¶ 10, and that Defendant "never disputed or questioned the validity or substance of any of the Invoices,” id. 11 42. More to the point, for purposes of this motion, it is undisputed that *136 Plaintiff provided Defendant cement products "[plursuant to the Credit Agreement and the Terms and Conditions.” Id. II 12.
. However, for cash-on-delivery invoices, payment was considered past due if not paid in full upon delivery.
. Plaintiff's decision to impose this requirement fell within the boundaries of the Terms and Conditions. See PL's Stmt. Ex. B (Terms and Conditions) at 1 (“If at any time the financial responsibility of Customer becomes impaired or unsatisfactory to Essroc, Essroc reserves the right to require payments in advance or such other security or guarantee as Essroc deems appropriate.”).
. Defendant issued these checks via the “CHAX” check software system.
. Although not directly addressed in Plaintiffs submissions, it appears that Plaintiff continued to supply Defendant with cement products between September 19, 2008 and September 22, 2008, the time intervening between Defendant's issuance of bad checks and the time of Defendant's alleged representations regarding the conversion of the CD. PL’s Stmt. ¶¶ 35-37.
. Defendant's submissions included a purported Verified Answer to Plaintiff's Complaint. See Def.'s V. Answer, Docket No. [10-2].
. Defendant’s counsel subsequently filed a notice with the Court claiming to have miscalendared the date of the Initial Scheduling Conference, but providing no explanation for *138 Defendant's failure to participate in the Court's Mediation Program as ordered. See Def.’s Not. to Court, Docket No. [21],
. Similarly, when a party files an opposition to a dispositive motion, yet fails to address certain arguments raised by the moving party, the Court may treat those specific arguments as conсeded.
Yelder v. Gates,
Civ. A. No. 09-1301 (RJL),
. Plaintiff's claim for unjust enrichment is asserted in the alternative to its claim for breach of the Parties’ express agreements. See Compl. ¶ 36; PL’s Mem. P. & A., Docket No. [26], at 8.
. Nor can Defendant be heard to complain of the application of Pennsylvania law here, having failed to offer any rebuttal to Plaintiff’s contention that the choice-of-law provision in the Terms and Conditions should be applied in this case.
See Davis v. Grant Park Nursing Home LP,
. Indeed, the Court could not discharge such a burden even if it were so inclined. Because the record is not entirely clear as to which of the invoices in the period extending from September 19, 2008 through October 9, 2008 were extended to Defendant on credit and which were provided on a cash-on-delivery basis, see Pl.’s Stmt. ¶¶ 35-39, the Court is unable to determine the date on which service charges for those transactions should begin to accrue. See Pl.'s Stmt. Ex. B (Terms and Conditions) at 1 ("All past due balances will be subject to a service charge of one and one half percent (1-1/2%) per month or the highest rate permissible by law.”) (emphasis added).
. Although contracting parties may generally structure their agreement as they choose,
Waynesborough Countty Club of Chester Cnty. v. Diedrich Niles Bolton Architects, Inc.,
Civ. A. No. 07-155,
. Under that test, courts must “ 'evaluate the governmental policies underlying the applica
*145
ble laws and determine which jurisdiction's policy would be more advanced by the application of its law to the facts of the case under review.' "
Drs. Groover, Christie & Merritt, P.C. v. Burke,
. While not entirely clear, Plaintiff also appears to suggest in its moving papers that Defendant acted fraudulently in issuing to Plaintiff four checks returned for insufficient funds. See Pl.’s Mem. P. & A. at 10. No such allegations appear under the fraud count set forth in the Complaint, see Compl. ¶¶ 41-46, and parties are obligated to plead with particularity circumstances allegedly constituting fraud. Fed.R.Civ.P. 9(b). Regardless, nothing in Plaintiff’s submissions establishes that Plaintiff relied, let alone reasonably relied, upon Defendant’s issuance of these checks in providing additional cement. See Pl.’s Stmt. ¶¶ 29-34, 46-53. The mere suggestion that one followed the other cannot suffice to meet Plaintiff's burden.
. Pennsylvania recognizes nearly identical elements to a claim sounding in fraud.
See Eigen v. Textron Lycoming Reciprocating Engine Div.,
. Although Plaintiff's submissions do not specify when it received notice that Defendant’s checks had been returned for insufficient funds, the Court shall presume that it was close in time to their issuance.
See Anderson v. Liberty Lobby, Inc.,
. Here as well, Pennsylvania law is in agreement.
See Toy v. Metropolitan Life Ins. Co.,
. Again, the Court observes that the same result would be dictated were Pennsylvania law to apply to Plaintiffs fraud claim, as the courts of that state have also held that, "when fraud is the basis of compensatory damages, the same fraudulent conduct is not sufficient to base an award of punitive damages without more.”
Pittsburgh Live, Inc. v. Servov,