217 A.D. 282 | N.Y. App. Div. | 1926
This action is brought to recover damages for the anticipatory breach or repudiation by defendants of an alleged irrevocable letter of credit issued by them in favor of plaintiff. The complaint alleges that prior to October 18, 1919, plaintiff entered into a contract with the Italian Ministry of Shipping, acting for and on behalf of the government of Italy, under and by virtue of which the plaintiff agreed to sell to the said Italian Ministry of
It is then further alleged that the plaintiff, in reliance upon the credits then open in its behalf, proceeded to the performance of its contract with the Italian Ministry of Shipping, and made various contracts and arrangements for the purchase of the coal necessary to fulfill its contract and for the due financing of such purchases when by reason of the coal embargo laid by the government of the United States, and by reason of the freight conditions and shipping conditions, the plaintiff and the Italian Ministry of Shipping agreed to modify the contract then existing by extending the time of performance thirty days from the date of the official lifting of the embargo. It is averred that it was further mutually agreed at the said time that the credits' opened for and on behalf of the plaintiff would be simultaneously extended to a date and be kept open thirty days after the day of the official lifting of the embargo; and that pursuant to the modification thus effected the defendants duly acknowledged and agreed that the two credits theretofore opened were extended to a period of thirty days after the official lifting of the embargo on the export of coal.'
It is then set forth that in reliance upon the extensions thus procured and the continuance of the credits thus kept alive, the plaintiff
It is further alleged that at the time of the notification of the refusal to perform, thirty days had not elapsed from the day of the official lifting of the embargo on coal, nor had such embargo been officially lifted; that by reason of the premises plaintiff was unable to proceed any further in the performance of its contract, but that it duly performed all of the terms, covenants and conditions thereof, except in so far as performance was prevented by defendants. Damages for the breach are demanded in the sum of $50,000.
The answer admits that the Italian Ministry of Shipping opened two credits in favor of the plaintiff (one for $262,000 and the other for $229,000) to be used for the payment of two cargoes of coal, each delivered c. i. f. Italy, and instructed the defendants to pay plaintiff therefor against the delivery of certain documents. It admits delivery to the plaintiff of the four letters attached to the complaint, i. e.: (1) The instrument in suit; (2) the first extension thereof; (3) the second extension thereof, and (4) the letter constituting the alleged repudiation or withdrawal of the said credit. In all other respects the answer is a general denial.
The testimony shows that plaintiff, prior to October 18, 1919, had sold to the Italian Ministry of Shipping by contracts as modified two cargoes of Pocahontas and New River coal, the first to consist of from 5,000 to 7,000 tons, October loading, to be delivered c. i. f. Genoa at the price of thirty-three dollars and thirty cents per gross ton; the second, of 6,000 to 8,000 tons Pocahontas and New River coal, October loading, to be delivered c. i. f. Civitavecchia at the price of thirty-three, dollars and twenty-five cents per gross ton. The coal was to be supplied from Hampton Roads pools No. 1 and No. 2. The original price fixed had been thirty-two dollars and eighty cents c. i. f. Italy and thirty-two dollars and seventy-five cents c. i. f. Civitavecchia. In the letter of September 30, 1919, from the Italian Ministry of Shipping to plaintiff acknowledging the purchase by the former from the latter of the first cargo, it was said: “ This office will take care to inspect and pay for this cargo.” In the letter of October 4, 1919, from the Ministry to plaintiff acknowledging the sale of the second cargo, the expression used was “ The necessary money for paying this cargo is here at your disposal ” (meaning at New York, where the letter was written by the accredited representative of the Ministry).
The Ministry did in fact fulfill and carry out its obligations by establishing a credit here in plaintiff’s favor to pay for the coal
“ Kidder, Peabody & Co.
'' 115 Devonshire Street 17 Wall Street
“ Boston New York
“ By Hand
: New York, October 18, 1919.
“ Messrs. Ernesto Foglino & Co., Inc.,
“11 Broadway,
“ New York City:
“ Dear Sirs.— We have today received instructions from Engineer A. Palanca of the Italian Ministry of Shipping requesting us to open two credits in your favor for $262,000 and $229,000, both to be used for payment of a cargo of coal, c. i. f. Italy, as follows:
“ 'Against such credits you will make payment to the above said concern against the delivery of the following documents, duly viséed by the undersigned (Engineer A. Palanca).
“ ' First — Ocean Bill of Lading (3 originals and 3 duplicates). Second — Invoices in triplicate. Third —• Railroad scale of weight of each individual cargo dumped into vessel. Fourth — Tidewater coal exchange certificate showing the pool number the coal has been drawn from. Fifth — Insurance policy covering the cost of this shipment of coal, c. i. f.
“ ‘ Further instructions will follow regarding these credits in case that no shipment of coal will be made on or before the end of this month.’
Very truly yours,
“ KIDDER, PEABODY & CO.”
It being impossible at the time to obtain the coal called for by the contracts, an extension of time for performance Was agreed on, as Well as a slight increase in price, and the following letter from the Ministry of Shipping was sent to plaintiff, confirming these modifications of the original contracts:
“ Italian Ministry of Shipping
“ 291 Broadway
“ New York
“A. Palanca, N. A. October 30th, 1919.
“ Messrs. E. Foglino & Co., Inc.,
“11 Broadway,
“ New York City:
" Gentlemen.— This will acknowledge receipt of your letter of October 29th just received.
“ With the view of trying to have definite action on these two*287 cargoes of coal sold by Dr. Foglino to the Italian Coal Comptroller, it is agreeable for me to modify the conditions as follows:
“ Price to be $33.25 per gross ton c. i. f. Civitavecchia.
$33.30 per gross ton c. i. f. Genoa,
with the understanding that the coal supplied is to be Pocahontas and or New River coal from Hampton Roads pools #1 and 2.
“As I understand that you are going to ship these two cargoes via the S /Ss ‘ Haughland ’ and ‘ Monceliere/ I am instructing Messrs. Kidder, Peabody & Company to keep the credits already established in force up to November 30th, 1919.
“ Please advise definite loading dates of the above-mentioned two vessels, so that we may provide for the necessary inspection of the cargo while the steamers are loading.
“ Yours very truly,
“ For the Italian Ministry of Shipping,
“A. PALANCA.”
In further performance of their obligations under the contracts, the Ministry wrote defendants under the same date as follows:
“ Italian Ministry of Shipping
“ 23751 “ New York
n., 1nin October 30th, 1919
“ Messrs. Kidder, Peabody & Co.,
“ 17 Wall Street,
“ New York City:
“ Gentlemen.— Please refer to my letter #23062 dated October 17th establishing two credits in favor of Ernesto Foglino & Company, Inc., 11 Broadway, New York City.
“ This is to inform you that these credits shall be kept in force to cover payment during the month of November and shall be considered as discontinued in case no shipments of coal are made before November 30th, 1919, in which case further' instructions will follow as to the disposal of the amounts of money involved.
“ Please confirm and notify Ernesto Foglino & Company, Inc., of this. Yours very truly,
“ For the Italian Ministry of Shipping.”
In conformity with the instructions thus given defendants wrote plaintiff as follows:
“ Messrs. Ernesto Foglino & Co., Inc.,
“11 Broadway, New York:
“ Dear Sirs.— Referring to our letter of October 18th, we have to advise that these Credits shall be kept in force to cover payment during the month of November and shall be considered as dis*288 continued in case no shipments of coal are made before November 30th, 1919, in which case further instructions will follow as to the disposal of the amounts of money involved.
“ Kindly acknowledge receipt, and oblige,
“ Very truly yours,
“ KIDDER, PEABODY & CO.”
A coal strike which had been imminent for some time finally became effective on November 1, 1919. Because of its threatened damage to our business prosperity and domestic comfort, the President of the United States on October 30, 1919, took advantage of the Lever Act, which was still in force (this country being still officially at war), and which among other things conferred upon him power to supervise and regulate the distribution of coal. (See 40 U. S. Stat. at Large) 284, § 25; Id. 283, § 24; 41 id. 1359, chap. 136; 42 id. 105, chap. 40.) By Executive Order dated October 30, 1919, he revoked prior orders made by bim and restored all the rules, regulations, orders and proclamations theretofore suspended and restored to the Fuel Administrator, Dr. Harry A. Garfield (by Executive Order of November 5, 1919), his former power to “ restore, change or make such rules, regulations, orders and proclamations fixing the prices or regulating the production, sale, shipment, distribution, apportionment, storage, or use, of all coal or coke as in his judgment may be necessary.” The strike lasted from November first to the middle of December, 1919, during which time no bituminous coal was produced.
Because of the difficulties, if not impossibility, of procuring coal for export under these conditions, an extension of time of performance of the contracts in question was realized to be imperative. So, December 3, 1919, the Ministry wrote to defendants as follows:
“ Italian Ministry of Shipping
“291 Broadway
“ New York
“ A. Palanca, N. A. December 3rd, 1919.
“ When replying refer to 25374
“ Messrs. Kidder, Peabody & Co.,
“ 17 Wall Street,
“ New York City:
“ Gentlemen.— Please refer to my letter #23062 dated October 17th and to my subsequent letter #23751 dated October 30th establishing two credits in favor of Messrs. E. Foglino & Company, Inc., 11 Broadway, New York 'City.
“ On account of the strike conditions of the coal mines, this con*289 cern has not been able to ship the coal covered by these two credits and therefore the subject of this letter is to authorize you to extend these two credits to be valid until thirty days after the official lifting of the embargo on export coal.
“If on the thirtieth day after the official release of embargo, one or both cargoes have not been shipped, credit shall be considered cancelled for the portion not shipped.
“ Yours very truly,
“ For the Italian Ministry of Shipping
“ (sgd) A. PALANCA ”
On the same day, following these instructions, defendants wrote to plaintiff:
“ New York, December 5, 1919.
“ Messrs. Ernesto Foglino & Co., Inc.,
“11 Broadway, New York:
“ Dear Sirs.— Referring to the two credits opened in your favor by the Italian Ministry of Shipping for $262,000 and $229,000, we have been instructed to extend these two credits to be valid until thirty days after the official lifting of the embargo on the export of coal. If on the thirtieth day after the official release of embargo, one or both cargoes have not been shipped, credit shall be considered cancelled for the portion not shipped.
“ Kindly acknowledge receipt.
“ Very truly yours,
“ KIDDER, PEABODY & CO.”
Thereafter plaintiff continued its efforts to obtain the coal, necessarily embarrassed in such efforts by the conditions which existed. On April 16, 1920, it finally was able to enter into a written agreement for the purchase of the coal called for by the two contracts, with the Alden Coal Mining Company. This contract insured compliance with the terms of the contract between the Ministry and plaintiff. It called for the delivery of 15,000 tons of Pocahontas and New River coal from pools No. 1 and No. 2 at Hampton Roads, 7,000 tons for delivery to Genoa, 8,000 tons to Civitavecchia. The cargoes were to be loaded at Hampton Roads within thirty days. The purchaser was to turn over satisfactory credits, and the seller testified that plaintiff told him of the existence of the credits in its favor with defendants, and the seller accepted them as satisfactory. The price per gross ton was $31.75.
What is called the “ embargo ” was finally lifted on April 30, 1920. As a matter of fact, between December 5, 1919, and April 30, 1920, there was never any “ embargo ” on coal in the ordinary
On March 1, 1920, a majority of the President’s representatives on the Tidewater Coal Exchange committee (Howe, Peale and Whitaker) issued an order providing that:
“ It is hereby ordered and directed that until further or other order by them or any of them that coal for bunkering vessels destined to foreign ports may be supplied only upon application to J. W. Howe (Singer Building, 149 Broadway, New York) and in accordance with permits issued by him.
“ The exportation of cargo coal to foreign and insular ports or destinations is prohibited, except upon special authority in the form of permit issued in each case and upon each cargo by J. W. Howe (Singer Bldg., 149 Broadway, New York). This order shall remain in force and effect until midnight of the 30th day of April, 1920, unless otherwise ordered.”
This order continued in effect until April thirtieth, but on April ninth the committee modified it to the extent of allowing all bunkering without permits.
With affairs in this condition, plaintiff having a valid subsisting contract for the coal, required to fulfill his contracts with the Ministry, made April .sixteenth, which was to be fully performed by May sixteenth, less than thirty days after the embargo was lifted, on April 30, 1920, the Italian Ministry of Shipping and the defendants wrote to plaintiff notifying it of the cancellation of the credits.
The Ministry wrote as follows:
“ Italian Ministry of Shipping,
“ 291 Broadway,
“ New York.
“April mh, 1920.
“ Messrs. Ernesto Foglino & Co.,
“11 Broadway,
“ New York City:
“ Gentlemen.— Kindly note that, in view of your failing to deliver the two well-known cargoes of coal under c. i. f. conditions — notwithstanding that the absolute embargo against exportation of coal from United States to Italy was lifted during December last after which time big quantities of coal were monthly exported to Italy, both for private and government account — the two credits of $262,000 and $229,000 which had been opened by this office in your favor with Messrs. Kidder, Peabody & Company have been considered in agreement with the latter as automatically cancelled.
“ We have informed of the cancellation our people abroad, while Messrs. Kidder, Peabody & Company have closed the relative credit accounts.
U^T ', ^ Yours very truly,
“ For the Italian State Railways,
“ F. QUATTRONE.”
Quattrone was the successor of Palanca who had then left the service of the Italian government.
The defendants’ letter follows:
*292 “ Kidder, Peabody & Co.
“ 115 Devonshire Street 17 Wall Street
“ Boston . New York
“ New York, April 30, 1920.
“ Messrs. Ernesto Foglino & Co., Inc.,
“ 11 Broadway, New York:
“ Dear Sirs.— Referring to the Credits which were opened by us order of the Italian Ministry of Shipping for $262,000 and $229,000 in your favor, we haye to advise that these credits have expired. Very truly yours,
“ KIDDER, PEABODY & CO.”
Treating this letter as a repudiation of the letter of credit and' an anticipatory breach thereof, as well as of the contract of sale, since both the letter of credit and the time of performance of the contract would not expire until May 30, 1920, plaintiff brought this action and has recovered as damages the sum of $48,750, being the difference between the contract price of the coal to the Ministry and its market price, c. i. f. the respective ports in Italy, within thirty days after April 30, 1920.
The first question to be determined upon this appeal is whether the document issued by appellants to respondent constituted a letter of credit. The appellants concede that the letter of October 18, 1919, sent by them to respondent falls within some definitions of a letter of credit (citing American Steel Co. v. Irving National Bank, 266 Fed. 41, 43, and Ward on American Commercial Credits, 29). They also concede that no particular form is required for a letter of credit (citing Bank of Plant City v. Canal-Commercial T. & S. Bank, 270 Fed. 477; Border National Bank v. American National Bank, 282 id. 73, and Lamborn v. National Park Bank, 240 N. Y. 520). As McCurdy says in his article on “ Commercial Letters of Credit ” in the Harvard Law Review (Vol. XXXV, p. 542): “ Their variations are almost infinite.” But appellants contend that the letter in question did not constitute an irrevocable documentary letter of credit because of the requirement that payment was to be made to plaintiff thereunder only on the delivery of enumerated documents, which were to be duly vised by Engineer A. Palanca, representing the'Italian Ministry of Shipping. It is contended that the necessity for securing such visé before payment could be properly made under the credit established, destroyed the legal effect which otherwise would have been attached to the letter and rendered it impossible to regard it as creating an irrevocable credit. As the learned counsel for appellants puts it in his brief: “ In the usual letter of credit transaction payment is made against drafts drawn by the beneficiary accompanied by document, and the intervention of the party
This objection is best answered in the language of Wilbert Ward in his work on “American Commercial Credits,” (N. Y. 1922), the most helpful treatise on the subject which has come under my observation. He thus defines a commercial letter of credit (at p. 9): “A buyer who can place in the hands of a seller a written instrument issued by the buyer’s bank, authorizing the seller to draw in accordance with certain terms, and stipulating in legal form that all such bills will be honored, has at his command an instrument which will make his business more attractive to the seller than would otherwise be the case. An instrument by which a bank gives formal evidence of its willingness to undertake this class of operation for one of its customers is what has come to be known as a ‘ Commercial letter of credit.’ A commercial letter of credit is normally, though not necessarily, issued in favor of a third party, usually a seller of goods, designated by the customer on whose behalf the credit is issued. As we shall see, commercial letters of credit are issued in a great variety of forms and are made available in a great many ways. The essential object in every case is the same — to evidence to a selected correspondent, or to bankers generally, the nature of the credit which the opening bank has committed itself to extend to its customer.” He then calls attention to the fact that though commercial letters of credit owe their origin to the early Roman and Lombard money changers, there has been until recent days little litigation about instruments known and used for centuries and there is no record of one of them having been passed upon by Lord Mansfield, who created the commercial law of modern England. As the author says (at p. 10): “ It is a tribute to the keen desire of bankers to honor their obligations without quibble, though it has contributed to the lack of understanding of the subject, that the use of commercial letters of credit has extended into these modern times without creating enough litigation,. either in England or in this country, to define their legal implications.”
So far from the requirement that an engineer should certify to the proper performance of the contract operating to destroy the character of the letter of credit, Ward in his work advances cogent reasons why such a provision is both desirable and advantageous, helpful alike to buyer and banker. Thus in his chapter on “ Protection of the Mercantile Risk,” he says (at p. 210): “ The proper
Thus, it would seem that the requirement for visé was an attempt to protect the buyer, and allow the buyer to pass on the performance of the contract between the buyer and seller-. Ward further says (at p. 207): “ It has always been understood and has recently been reaffirmed in decisions reviewed in Chapters XVII and XVIII, that the obligation of the bank which has issued a commercial credit to the seller of the goods as the beneficiary, is quite independent of the obligation between the buyer and the seller as such, evidenced by the contract of sale. A beneficiary does not become entitled to avail himself of a commercial letter of credit by performing the terms of his contract of sale, if the documents do not conform to the terms of
“ The defendant in effect seeks to read into the contract a provision that the plaintiff’s rights under the letter of credit should be subject to the superior right of the MacDonnell Chow Corporation to modify the contract which the bank had made with the plaintiff. We do not so understand the law.”
- Appellants contend that if a third party’s certificate had been insisted upon the letter of October 18, 1919, would have fulfilled the functions of an irrevocable, documentary letter of credit, but “ Where, however, the very party at whose instance a credit is opened must consider before it is drawn against, the obligations of the bank are so unlike those of the ordinary issuer of a documentary credit that only by courtesy can it be said to have issued an irrevocable, documentary letter of credit.” In support of this idea it quotes from the case of Morgan v. Larivière (L. R. 7 H. L. 423, revg. Larivière v. Morgan, L. R. 7 Ch. App. 550). There the French Committee of National Defense, whose agent in England was one Joulin, executed a contract in November, 1870, with Lariviére for the purchase of 20,000,000 ball cartridges, deliverable in lots of 25,000 or more. On December 1, 1870, J. S. Morgan & Co. wrote Lariviére: “ We are instructed by Mr. L. Joulin to advise you that a special credit for the sum of £40,000 (say forty thousand pounds), equivalent to frs. 1,000,000 (one million francs), has been opened with us in your favour, and that it will be paid to you rateably as the goods are delivered upon receipt of certificates
Thus, the case quoted by appellants is authority only for the holding that the liability of the issuing bank was not that of trustee, and that there is no equitable assignment of funds.
I reach the conclusion that by the weight of authority and reason the letter in question was a commercial letter of credit, and, containing no words stipulating the possibility of revocation before its limit of maturity, it was irrevocable as well.
The appellants contend that the official lifting of the embargo on the export of coal took place not later than April 1, 1920, so that the defendants were correct in saying on April 30, 1920, that the credits had expired. This is based on the theory that the power of the Director General of Railroads “ to divert, confiscate, reconsign and distribute all the coal ” ended on April first, making coal available for export. They admit, however, that the Howe
Of course, in its strict sense an embargo never existed during the period in question against the exportation of coal.
An embargo is a proclamation or order of State, usually issued in times of war or threatened hostilities, prohibiting the departure of ships or goods from some or all ports of such State, until further order. (The William King, 2 Wheat. [U. S.] 148.) But what the parties concededly meant by an embargo was a continuance of the conditions existent in this country by reason of a coal strike and of the continuance of a state of war, under which even if the exportation of coal was theoretically allowed under certain limitations it was practically impossible. This condition was realized and accepted by all the parties concerned herewith, buyer, seller and bankers alike. It was the reason why the time for performance of the contract and the time limit of the letter of credit were extended from the end of October, 1919, first to the end of November, 1919, and then to the period of thirty days after the official release of the embargo. A careful consideration of the voluminous executive orders and other official documents set forth in the record leads to the conclusion that the date of such “ official release of the embargo ” was April 30, 1920.
The respondent thus having thirty days after April 30, 1920,
The sole remaining question is that of the measure of respondent’s damages. It has recovered upon the theory that it was entitled to the difference between the contract price with the Ministry and the market price within thirty days after the official lifting of the embargo, amounting to $3.25 per ton, or $48,750. Both parties concede the rule of damages applicable to the breach of a letter of credit, which is thus laid down in Doelger v. Battery Park National Bank (201 App. Div. 515, 521) where this court said: “ It seems to us that upon the breach of the contract by the defendant, the plaintiff became entitled to recover from the defendant the damages which it could have established in an action against the buyer, the Machinery Metals and Sales Company, that is to say, the difference between the then market value of the steel bars and the purchase price thereof as fixed by the contract between the plaintiff and the metals company.”
In Urquhart Lindsay & Co., Ltd., v. Eastern Bank, Ltd. (L. R. [1922] 1 K. B. 318), which is followed in the Doelger case, the court said: “ The damagés to which the plaintiffs are entitled are the difference between, on the one hand, the value of the materials left on their hands and the cost of such as they would have further provided, and, on the other hand, what they would have been entitled to receive for the manufactured machinery from the buyers, the whole being limited to the amount they could in fact have tendered before the expiry of the letter of credit.”
What then were the damages which could be recovered by the respondent against the buyer, the Ministry, for its damages for the breach of its contract? The contract price thereunder for the coal was thirty-three dollars and thirty cents per gross ton at
While it is true that respondent had a valid contract at a firm price for the furnishing of this coal by the Coal Export Corporation, it never in fact received or paid for the coal, as it would have been required to do had it been obliged to make an actual tender thereof in the absence of any anticipatory breach of the letter of credit by appellants or of the contract of purchase by the Ministry. In the event, having two cargoes of coal on hand, which it would be obliged to dispose of at a loss (the market having fallen meantime), it might perhaps have been entitled to add that loss to its lost profits as damages actually sustained. So too, if sued or threatened with suit by the Export Corporation for breach of its contract with the former, when it did not in fact take the coal as agreed, the respondent might perhaps have added that element of damage to its loss of profits, as the financial injury caused by defendants’ default and that of the Ministry.
But neither of these elements is present here. As a matter of fact the Export Corporation simply treated their contract as at an end when they learned appellants’ credits to respondent had been canceled. I am, therefore, of the opinion that plaintiff’s recovery is limited to the profit it would have made as shown by the difference between the two contract prices, viz., $22,500. (Henderson Tire & Rubber Co. v. Wilson & Son, Inc., 235 N. Y. 489.)
The judgment should, therefore, be modified by reducing the amount of the directed verdict on which it is based to the sum of $22,500 (with the addition of the interest allowed in the accompanying opinion in Foglino & Co., Inc., v. Webster, No. 2, 217 App. Div, 300, on appeal from an order disallowing the same), and the judgment as so modified and the order appealed from affirmed, with costs to respondent.
Clarice, P. J., Merrell, McAvov.and Martin, JJ., concur.
Judgment modified as indicated in order, and as so modified the judgment and order appealed from are affirmed, with costs to the respondent.